*Overview of Projects:
-Haram Expansion.
-Mataf Expansion.
-Ring Road Project.
-Stations Project.
*Progress / WIR
*100% Measured
* Site Inspections/ MIR
Pooling skills: a good team will let everyone use their individual skills to the full.
Learning: we can learn from other members of the team.
Leadership: teamwork is a context for leadership skills to shine.
Following: followership is just as important as leadership; teamwork helps us to develop this skill.
Problem solving: good teamwork teaches us to resolve problems effectively.
((Working well in a team can bring out the best in us)).
* Site Inspections
approved process and procedures are being followed in execution.
proper equipment and materials are being used for execution
Proper work safety process to be checked
The work progress shall be checked against the approved work schedule.
*PanelBoards.
*Motor Control Center.
*Transformer.
*Lighting Fixture.
*Cable Tray.
*There are two main types of Panel Boards, distribution or lighting and appliance. The Panel Boards Used to control light, heat, or power circuits, we can use Excel to record the Tag Reference and in which floor also the types and quantity. The types of Panel Boards are PP, LP, EPP, ELP.
* A motor control center (MCC) is an assembly of one or more enclosed sections having a common power bus and principally containing motor control units. Motor control centers are in modern practice a factory assembly of several motor starters. A motor control center can include variable frequency drives, programmable controllers, and metering and may also be the electrical service entrance for the building. A motor control center (MCC) has many types such as MCP, EMCC, EMCP we can use Excel to record the Tag Reference and in which floor also the types, quantity.
* A transformer is a static electrical device that transfers electrical energy between two or more circuit through electromagnetic induction. A varying current in one coil of the transformer produces a varying magnetic field, which in turn induces a varying electromotive force (emf) or Voltage in a second coil. Power can be transferred between the two coils through the magnetic field, without a metallic connection between the two circuits. we can use Excel to record the lighting fixture and in which floor also the types, quantity. For example, PD1, A1, H1, K49,
*Cable Tray 150-600mm width options with multiple designs for a choice of load capability, there are 3 types of cable Tray, ELBOW, REDUCER,
T-SHAPE
*100% Agreements.
*The contents of each Report is:
-Interim Quantities Agreement Sheet.
-Summary Sheet.
-Measurement Sheet.
-Assumption & Exclusions.
-Drawing Register.
-Drawing Sample.
*Interim Quantities Agreement Sheet needs to add Description/Comments, also adding the Measure Name with Date and Signature.
*Summary Sheet, I must change the name of the taker off to my name because after printing the report I must singe in front of my name, then adding the total of each size.
1-Some List of Electrical items:
*Grounding and Bonding, so for the grounding connecting a live part and the bonding is act of joining two electrical conductors together.
*Earthing System, is used for safety or production of electrical equipment.
*Earthing Conductor (PE), it joins the installation earthing terminal to earth electrode or to the earth terminal provided by the electricity supply company.
*Wiring Methods, there are different types of wiring systems and methods of electrical wiring. its classes of wiring methods. - cables - raceway - Cable Tray. all this method is used to connect the power supply devices, a and switches in an electrical circuit.
*Power Outlets, its device that allow electricity operated equipment’s to be connected to the primary Alternating current (AC) power supply.
*LV, MV cables, electricity supply in low voltage & MV medium voltage. the low voltage cables including PVC, XLPE, Insulation, armored cables, single & Multi core cable construction.
- Company industry: