مراقب كهروميكانيك
مكتب ديران ومصري
Total years of experience :29 years, 9 Months
مشرف أعمال كهروميكانيك لدى مكتب ديران ومصري
لمشروع انشاء استراحة وادي عربة المالك شركة إقليم وادي عربة
Supervising and receiving the notes of the final period of the expansion project of Kempinski Hotel - Amman
Of finishing works, electricity and mechanics
Various projects have been completed, including the Ministry of Defense
King Faisal Air Base (Construction of Aircraft Maintenance Building)
King Fahad Air Base (MBI calibration project - Ammunition Building Project)
And the completion and delivery of projects belonging to Saudi Telecom
Dammam Beach neighborhood
Al-Ahsa - Al-Jafr
Taif (Kharma-Rania)
Tabuk (Field-Dba)
The Special Forces Buildings Project - Salbukh
This project has been dedicated to 40 years of education, dormitories, areas, sports halls, training, teaching, theater, swimming pools and commercial malls.
Thanks to God, he was handed over before the time limit
The Andalusian Villas Project has worked on this project with its full implications and time constraints
And challenged the difficulties until he was arrested by the owner of the project
The project consisted of 548 villas and over 010 models
Except for villas whose model is modified by the new owner
I worked with the company at the expense of the Islamic Hospital Expansion Project.
Of the consequences of the Department of Mechanics completed at the expense of the project
Medical gases and the following
Fire fighting system of FHRC sprinklers and cabinets
Drainage system and water treatment
Air ducts of push and suctio
(Worked with the Foundation at the expense of the project (building general administration for vocational training
Of the Ministry of Public Works
During this period, several school projects were handed over to the Ministry of Education
Private and government projects have been completed
Including Al Nahda Al Haddah Schools - Sharjah and this project was completed before the specified time
)
And health centers - Private Susnah - - Dubai
Including the Jumeirah Market Center - Dubai Municipality
The project contains 380 commercial stores
Al-Lulua Tower - Sharjah - This tower contains 32 floors and 6 basement floors - servants, transformer stations and parking lots
I started to open engine maintenance engine and thanks to God in this period I signed maintenance contracts with several factories including
Zakarneh Ceramics & Ceramics Factory
Nablus Manufacturing Company
Shawal Plastic Company
Location of the operator in Sahab area near the roundabout Alshahid
I worked with the company initially as a sanitary ware installation supervisor at the expense of Al Qrain Project
بعد الانتهاء من مرحلة الثانوية العامة العامة القسم العلمي التحقت بالمعهد واتممت الدراسة بدجة الدبلوم