Dcs Control Room Operator
biolab arabia ltd
مجموع سنوات الخبرة :14 years, 1 أشهر
Participated in the initial start up and commissioning of the petrochemical batching plant including reactors, boilers, cooling towers, chillers, reverse osmosis unit and DCS units. Run and maintained process, signed work permits and ensured safety of workers and process. I also run lab analysis and was a qualified fire fighter
Make sure products meet with standards
Take care of workers safety
Helping workers to follow procedures
Review the procedures to support production team to determine rejection conditions
Training new employees
Follow up with employees qualifications
Follow up with new employees working practice
Helping shift leaders with finishing hold and NC pipes
Reporting shift status, abnormal conditions. Rejected pipes and total produced pipes
Helping operators to solve issues that causing rejection
Helping gauge room with set up and calibration of gauges
training new employees on OPERATION safety procedures and chemical reactions behaviors, cooling systems, utilities and how to utilise it in process, safety emergency procedures, LOTOs, isolation process, main process procedures, instrumentations and piping diagrams
Participated in the initial start up and commissioning of the Nylon 6, 6 plant. Run and maintained process
equipment, ensured safety of co-workers and maintenance in my unit. Worked on the Polymerization process, Utilities and HTF systems.
Participated in the initial start up and commissioning of the mega utility plant including boilers, cooling towers,
Incinerators, wastewater and DCS units. Ran and maintained process, signed work permits and ensured safety of workers and process. I also ran lab analysis and was a qualified fire fighter
basic operation course for 2 years
لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.