Sales and Service Support Engineer
Schlumberger Technical Services
Total years of experience :19 years, 4 Months
During my career with Schlumberger, I have developed an excellent knowledge about the DTS (Distributed Temperature Sensors) and DVS (Distributed Vibration Sensors) in the Power and Midstream (Pipeline) sectors within the gulf area and projects outside the area. The projects include:
• Held a major role in implementing and managing the installation of the SENSA’s Heat Trace Temperature monitoring system at QatarGas’s CSP3 project in Ras Laffan, Qatar. (2009 - 2011)
• DTS and Fiber installation in SGI project for Chevron. The fiber was installed to monitor pipes in the sour gas injection plant in Tengiz, Kazakhstan. (2006)
• DTS and Fiber installation at YLNG project in Balhaf, Yemen. The fiber was installed to monitor LNG tanks for leak detection during the storage of the liquefied gas. (2009)
• DTS Installation and commissioning for Qatar’s Kahramaa for the expansion of the power grid. This was subcontracted from clients who include Nexans, ABB, Siemens, Sudkabel, LS Cable, Marubeni, Saudi Cables and Qatar Petroleum. (2006 - 2011)
• DTS Installation and commissioning for Bahrain’s EWA, subcontracted from Saudi Cables, Nexans and LS Cable. (2006 - 2010)
• DTS Installation and commissioning and training for the GCC Subsea cable 400 kV power cable between Saudi Arabia and Bahrain (2008)
• DTS Installation and commissioning and training for the Jeddah Kandarah 380 kV Project in Saudi Arabia (2010)
• DTS Installation and commissioning and training for projects undertaken in Russia and Kazakhstan (2010/2011)
• DVS field trial for ENI at Obiafu Oil Field in Nigeria (2009)
• DVS field survey in India for BPCL/IOCL for potential field trials and installations (2010)
• Perform DTS training and presentation for all clients.
• Involved in the installation of the DVS on the BP’s BTC pipeline in Georgia (2011)
Support computers, printers and servers connected to the company's LAN in three locations in Dubai. Involved in many projects such as:
• Involved in a team of 4 to migrate all servers, LAN peripherals and users to a new office premises.
• Making sure all computers are non vulnerable.
• Applying Connected backup on all user computers.
• Rearrangement of the server room and consolidating similar servers together saving space and power consumption.