Technical Office Manager
Misr Connsult Envir.&Infrastructure Studies (Prof. Dr. Sameh Abdel-Gawad)
Total years of experience :24 years, 5 Months
Construction No. 3 of water pump station & transportation pipe line.
Owner: Misr Elgdeda (New Helioples).
Project Cost (255 M).
Contract Cost (7.2 M).
Group Manager - Consultant to the Ministry of Education - Asir Region Education Department
The value of projects is 234 million
The contract value is 21 million
Project Manager Consultations
• The project: completion of sewage networks in south Khamis Mushait (phase III) cost (22.5 M).
***Technical Office Manager for Company projects
• Weekly Sabia market cost (36 M).
• The replacement & renovation of the hospital Dhahran 100 beds cost (22 M).
• ICU in Assir Central Hospital cost (27 M).
• Physiotherapy at Assir Central Hospital cost (24 M).
• Multi-stores car park in Assir central hospital cost (45 M).
• The building of the Department of Zakat and Income in Abha cost (35 M).
• Children's Emergency Building in Al-Mahalla Hospital cost (25 M).
• Jeddah Kidney Dialysis Filters Factory, cost (105 M).
• Villas resort in Al-Darb Assir cost (15 M).
***Project Manager
• The project: the Police Training City in Assir, cost (166 M).
Contains an administrative, an educational, a dining hall for 2000 people and a kitchen, no. 4 dormitory for students &finally a general site of ground and overhead tanks and pumps, sewage tanks, feeding and drainage networks &landscape.
1- Project manager building weapons, ammunition store, & 3 firing range shooting 35 millions.
2- Project manager to the first phase of the complex of sports Qassim university 45 millions.
1- Project engineer at two girls schools 15 millions.
2- Site engineer for two transform substation 33.8 k.v.a in Qassim 66 millions.
1- Site engineer many of building, villas & mosque.
a. Work in house of the Egyptian Engineering Office surveyor engineer lump sum for the work of locating and signing land pawn to the united Egyptian bank to determine the area and comparing property contracts.
b. work as an engineer in the maintenance and the increase floor for schools owned Cairo Investment & Real Estate Development business and the number 28 in the Shroq city Villa.
c. Egyptian-American company to work for irrigation and to do different survey for the first phase of the extension of the main irrigation line length of 36 km easy cannabis tourism in Hurghada Center under the management of the global company Bechtel and implementation of patient Consultant Engineering Consultancy Office.
GPA 2 / 4 - 65%. Good