Mechanical Automotive Engineer
Tabuk Pharmaceuticals
Total years of experience :5 years, 3 Months
• Streamlined workflow and enhanced team.
• Executed comprehensive risk management and analysis for HVAC, identifying potential risks, developing mitigation
strategies.
• Spearheaded risk assessment and onducted comprehensive risk assessment, analyzing current risks, business continuity, and
crisis management.
• Installation and commissioning of BMS (Building Management System) Siemens.
• Troubleshooting Utility (Chillers - Generators - Boilers - Fire System- Air Compressors).
• Implemented advanced control algorithms and sensor technologies.
• PLC hardware configuration and PLC configuration management - Siemens Smart Infrastructure.
• Created SOPs standard operating procedure for preventive maintenance for most machines in facilities.
• Configured and integrated CCTV and Configure fire alarm system with BMS.
• Conducted comprehensive risk assessment, analyzing current risks, business continuity, and crisis management requirements,
resulting in the identification of critical gaps and challenges impacting the company’s operations and financial stability
• Ensure that designs comply with contract technical specification, relevant codes, standards, regulations, and procedure
• Created and implemented a comprehensive spare parts report, analyzing inventory levels and demand patterns, resulting in a 20% reduction in breakdowns and associated maintenance costs.
• Implemented new contract management system to automate processes, reducing contract turnaround time by 30% and improving accuracy in service provision.
• Streamlined and optimized raw materials receiving areas through meticulous project planning, resulting in a 15% reduction in lead time, minimizing production downtime and increasing operational efficiency.
URL removed due to policy violation. Please contact support for further information.