Mechanical Project Engineer
7Kat Co.
Total years of experience :8 years, 4 Months
2020 RESIDENTIAL VILLAS AND CHALETS
The contract value of $1.5 Million
Prepared shop drawings and material submittals
Followed up with site activities and inspected works against approved drawings
Billed completed activities on monthly based
2015-2018 THE CONSTRUCTION OF AL AMIRI STATE HOSPITAL EXPANSION
416 beds capacity and contract value of $103 Million
Successfully led the site team of 150 members to execute mechanical works
Inspected the work packages against approved drawings, specifications, and local codes.
Undertook periodic inspections on-site following the Inspection and Test Plans
Assessed the health, safety, and any environmental issues that may arise at the site.
Monitored continuously, the quality of works reported daily activity on-site.
Effectively coordinated between discipline-related works resulted in a smooth workflow.
Provided technical engineering solutions on-site for the day-to-day site issues that surfaced.
2013-2015 THE CONSTRUCTION OF BIO-REMEDIATION SOIL TREATMENT AT MINA ABDULLAH KNPC
The contract value of $4.3 Million
Trusted with a budget of the project and successfully handed it over
Managed a team of 30 and two subcontractors, overseeing the direction of the project.
Supervised the project ensured that the client's specifications and requirements were met.
Reviewed progress and liaised with quantity surveyors to monitor costs
Made periodic safety inspections, ensuring construction and site safety
2012-2013 SE-80 TSE NETWORK PUMP STATION AREA C1 AND STORMWATER PUMPING STATIONS RA211, RA121, RA240, RA263
The contract value $55 Million
Prepared and approved the shop drawings from the consultant
Submitted, approved, and supplied all submersible pumps and other material
Supervised all installations, approved, and billed monthly the delivered work packages
Commissioned and negotiated the snag list tell closure of the projects.
Project: New Gas Booster Station 132 Enhancement for BS-131 (£560 Million of Total Works)
Responsibilities
• Planned and controlled the erections of Vessels, scrubber, pumps and steel structures
• Assigned and planed resources workforce and equipment to execute daily basis works
• Head of the team who carried critical modifications of steel structure for the HP and LP turbines
• Assigned to meet weekly with civil and piping divisions to match the project schedule and coordinate works
Responsibilities
• Got a training to calibrate robotic arms that handle plastic pieces and learnt to troubleshoot.
• Operated and monitored plastic moulding machines and of the production lines.
• Executed the planned daily and monthly maintenance.
Graduated with Distinction