PSD and Signaling specialist
Capital Metro Company LLC
Total years of experience :14 years, 2 Months
I'm working as PSD and Signaling specialist in riyadh metro project. I have been working in CAMCO since 2020. I have worked in MEPS Team Leader in Dubai Metro project as well. I have been working in railway industry since 2018. Before I have work in FM industry, ipp power plant and telecom sector. I have a great skills and knowledge about maintenance troubleshooting and commissioning work. I have been working in CAMCO more than 3 years and my expertise in handover inspection, punch list and PM AND CM Work on PSD and Signaling system. I'm maintaining record in the maximo and performing CMMS accordingly. I have good command in maximo. Collecting evidence and submitting to CMMS.
I'm working as a MEPS TECH and behalf of team leader also. I work on PSD( Platform Screen Door) system, TVS ( Tunnel ventilation system) and i also do work in Electrical mechanical and plumbing field. I have L-PIC aram band for Taking access from E.C, ISC, SC, SM for different types of locations like Line side work or Non line side work. I handle team and assign Technician for different kind of work. I check and maintain UPS, Air circuit breaker, Earth relay's, Transformer's, AHUS, FCUs, FAHUs, Dampers, Exhaust Fan's, moters, DPS system, LV Switchgears.
I worked as a MEP Team Leader in Abu Dhabi Mall and The Residential Tower appartments. I had worked on HV Switchgears, LV Switchgears, Transformer's, SMDBs, Distrbution panels, ATS panels, FAHUs, FCUs, AHUs, Plumbing system, flut switchs, jockey pump's, Electrical pump's, UPS, CBS system, Pressurization Fan's, Dampers. I have good knowledge about MEP work's.
I worked as a shift supervisor in ROOMI Power Plant. I had worked on LV Switchgears and HV Switchgears both Sub Stations. Starters panels, UPS, Batteries, Centrifugal Pump's, Dozing Pump's, Generator Synchronized panels, MCC Panels, Gas pipe line, Bulk meters, Exhaust Dampers. I had done whole overhauling of the Generator's like 1650kva to 2450 kva. I had erraction of 10MW and 6MW power plant.
I was checked everything thing related electrical or as a shift in charge checked all cooling towers and tempratures and engine room, centrifugel pump's, dozing pump's and every hourly taken all sensors reading and engine both sides gas pressure inlet out let and cylinders tempratures everything noted for the record into the log sheet.
I had worked as electrician at Telecom sector.
My responsibility only had checked the ATS panels, Rectifier's, 12 volts x 24 dry betteries, battery charger, magnetic contactors, circuit breakers, Earth wires, Earth pits and thimales, over head light on the site tower ( OB Light), photo cell's, alarms cables found the faulty alarm cables and 9 kva, 10 KVA, 11kva, 20kva, 27 kva, 30 kva, 60kVA, 100KVA, 500 KVA Generators Preventive plan maintenance and emergency calls response. I had done overhauling of generators.
Bachelor of Technology in Electrical. My Project was, I assembled control panel with the using of servo moter
Three years Diploma of Associate Engineer in Electrical
Matriculation