Project Execution Manager
U.ZIA Building Contractors
Total years of experience :10 years, 6 Months
Supervise and execute Civil, Mechanical and Electrical work of different projects.
Electrical designing of Commercial and Residential buildings.
Preparation of BOQ’s of electrical projects.
Cost Analysis of different projects.
Inspection of Electrical work according to project specifications.
Proper management of materials and workmanship.
Ensure all the work meet the stipulated quality standards.
Coordinate with subcontractors for smooth flow of work.
Negotiating with suppliers and purchasing items at optimum cost.
Preparation of electrical procedures for installation and commissioning.
Manage different construction sites and deliver to clients within the given time.
To supervise and ensure the trouble free running of all machinery and smooth operation of electrical substation.
To plan, organize and monitor the preventive and corrective maintenance of all plant.
Oversee all repairs and troubleshooting of equipment failures as well as root cause analysis of failures.
To manage the electrical preventive maintenance team in different shifts to improve the plant performance.
Coordinated with production department on different project progress.
Analyzed and recommended improvements to operational process to increase the performance of the plant.
Pay attention to safety precaution provided by the manufacturers and organization.
Conducting Safety audits within the department and ensuring the compliance from all the employees and updating the checklists and audit reports.
Reducing down time on all machinery (Operational and Maintenance).
Working on power factor to reduce the reactive power and decrease the electricity bill by 40%.
Determining, calculating and analyzing various maintenance cost.
Optimized machinery to increase efficiency and output.
Strong Ability to read Electrical drawings.
Maintain inventory at optimum level.
To gain the Knowledge; of basic engineering principles and techniques; of engineering planning; of equipment used in master control room
1) To understand the assembling and testing process of indoor and outdoor unit of Air Conditioner.
2) To understand the manufacturing process of condenser of Air Conditioner.
I did Electrical Engineering from Air University Islamabad.
I did FS.c Pre Engineering from Unique College of Computer Science.