Adel Gammaz, Construction Manager

Adel Gammaz

Construction Manager

Kharafi National Company

Location
Kuwait - Hawali
Education
Bachelor's degree, Civil Engineering
Experience
29 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :29 years, 7 Months

Construction Manager at Kharafi National Company
  • Kuwait - Al Jahra
  • My current job since September 2015

Client : Kuwait Oil Company (KOC) - Kuwait

Project Manager : Worley Parsons

Contracts value : $ 100, 000, 000

The work includes:

* Earth work 100, 000 m3
* Reinforced concrete 20, 000 m3
* Building, Finishing work
* Landscape, infrastructure, asphalt,
* Booster Pumping Station
* Storage tank 24000 m3
* Steel structure work
* RTRP&SS duplex piping work
* Equipment, pumps installation work
* Electrical instrumentation work

Construction Manager at Kharafi National Company
  • Kuwait - Al Jahra
  • My current job since September 2015

Client : Kuwait Oil Company (KOC) - Kuwait

Project Manager : Worley Parsons

CONTRACT : Design, Procurement, Construction of Brine
Pumping Facility (EPC work & O&M work)

Contracts value : $ 110, 000, 000

The work includes:

* Earth work 100, 000 m3
* Reinforced concrete 20, 000 m3
* Building, Finishing work
* Landscape, infrastructure, asphalt,
* Booster Pumping Station
* Storage tank 24000 m3
* Steel structure work
* RTRP&SS duplex piping work
* Equipment, pumps installation work
* Electrical instrumentation work

Construction Manager at Kharafi National Company - Kuwait
  • Kuwait - Hawali
  • March 2013 to August 2015

02 years experience in the field of Civil
Construction.
Skills
• Project Management& Engineering knowledge
• The ability to analyze complex data.
• Management of risk, resources and time.
• Supervisory Skills& Team Leadership
• Computer skills.
• Clear written and oral communication skills.
• Creative approach to solving problems.
2


Adel Ahmed Gammaz
Work Experience
Jun 2013 - till to date
Company: Kharafi National Company - Kuwait

Construction Manager ( civil work) at Kharafi National Company - Kuwait
  • Kuwait - Hawali
  • January 2013 to August 2015

POSITION: Construction Manager ( civil work)
CONTRACT NAME: Design Development, Construction, Supervision& Maintenance of Administration Building at Bayan Palace

PROJECT: Administration Building at Bayan Palace
(Area of building 23000 m2 for six floors)

Client: Al Diwan Al Amiri - Kuwait
Designer: NBC Engineering
Consultant: The Associated Engineering Partnership

Structural Consultant: Al- Farooqi Engineering Consultants Bureau

Contracts value: $ 90, 000, 000
WORK DESCRIBTION: The work includes: * Earth work 300, 000 m3
* Reinforced concrete 50, 000 m3
* pre-cast concrete 150, 000 m2
* Car parking area 45, 000 m2
* finishing work ( block work, aluminium, raised floor,
marble, false ceiling, parking, )

Construction Manager at Kuwait al- Ghad Company - Kuwait
  • January 2012 to May 2013

Jan 2012 - May 2013
Company: Kuwait al- Ghad Company - Kuwait
POSITION: Construction Manager
PROJECT: Infra structure, landscape & Asphalt work

Client: MOD & MOI & PAFH - Kuwait
Contracts value: $ 2, 500, 000
3

Construction Manager at Consolidated Contractors Company ( CCC)
  • Kuwait - Al Ahmadi
  • March 2010 to December 2011

02 years experience in the field of Civil
Construction.
Skills
• Project Management& Engineering knowledge
• The ability to analyze complex data.
• Management of risk, resources and time.
• Supervisory Skills& Team Leadership
• Computer skills.
• Clear written and oral communication skills.
• Creative approach to solving problems.
2


Adel Ahmed Gammaz
Work Experience
Jun 2013 - till to date
Company: Kharafi National Company - Kuwait

Construction Manager ( civil work) at Consolidated Contractors Company (CCC) Kuwait
  • Kuwait - Al Ahmadi
  • March 2010 to December 2011

POSITION: Construction Manager ( civil work)
CONTRACT NAME: Design Development, Construction, Supervision& Maintenance of Administration Building at Bayan Palace

PROJECT: Administration Building at Bayan Palace
(Area of building 23000 m2 for six floors)

Client: Al Diwan Al Amiri - Kuwait
Designer: NBC Engineering
Consultant: The Associated Engineering Partnership

Structural Consultant: Al- Farooqi Engineering Consultants Bureau

Contracts value: $ 90, 000, 000
WORK DESCRIBTION: The work includes: * Earth work 300, 000 m3
* Reinforced concrete 50, 000 m3
* pre-cast concrete 150, 000 m2
* Car parking area 45, 000 m2
* finishing work ( block work, aluminium, raised floor,
marble, false ceiling, parking, )


Jan 2012 - May 2013
Company: Kuwait al- Ghad Company - Kuwait
POSITION: Construction Manager
PROJECT: Infra structure, landscape & Asphalt work

Client: MOD & MOI & PAFH - Kuwait
Contracts value: $ 2, 500, 000
3


Adel Ahmed Gammaz

March 2010 - Dec 2011
Company: Consolidated Contractors Company (CCC) Kuwait

POSITION: Construction Manager
PROJECT: 400KV XLPE Power Cable (Laying & Civil Work)

WORK DESCRIBTION: The work include; * laying cable 100, 000 Mr.
* earth work 500, 000 m3 * joint pit concrete & finishing
* reinforced concrete 3000 m3 * pre-cast concrete 15000 m3

Construction Manager at Consolidated Contractors Company (CCC)
  • Kuwait - Al Ahmadi
  • April 2009 to February 2010

Client: Taihan Electric Co. (main contractor) & MEW - Kuwait

Contract value: $ 17, 000, 000

Apr 2009 - Feb 2010
Company: Consolidated Contractors Company (CCC) Kuwait

POSITION: Construction Manager
PROJECT: Green belt "W" 300KV Substation
WORK DESCRIBTION: The work include;
* Earth Work 40, 000 m3 * Reinforced Concrete 12000 m3
* Finishing Work ( tiles, painting, aluminium, sand lime bricks, )

Client: Hyundai Co. (main contractor) & MEW - Kuwait

Contract value: $ 4, 500, 000
4
Adel Ahmed Gammaz

Construction Manager at Consolidated Contractors Company
  • Kuwait - Al Ahmadi
  • April 2008 to March 2009

Apr 2008 - Mar 2009
Company: Consolidated Contractors Company (CCC) Kuwait

POSITION: Construction Manager
PROJECT: Jabber Al Ahmed "W" 300 KV Substation

WORK DESCRIBTION: The work include;
* Earth Work 80, 000 m3 * Reinforced Concrete 12000 m3
* Finishing Work ( tiles, painting, aluminium, sand lime bricks, )

Construction Manager at Consolidated Contractors Company (CCC)
  • Kuwait - Al Ahmadi
  • October 2006 to March 2008

Client: Hyundai Co. . (main contractor) & MEW - Kuwait

Contract value: $ 4, 500, 000

Oct 2006 - Mar 2008
Company: Consolidated Contractors Company (CCC) Kuwait

POSITION: Construction Manager
PROJECTS: * Al Rai "C" 132/11KV Substation
*Salmiya "I" 132/11KV Substation
*Salmiya "F" 132/11KV Substation

WORK DESCRIBTION: The work include;
* Earth Work 60, 000 m3 * Reinforced Concrete 18000 m3
* Finishing Work ( tiles, painting, aluminium, sand lime bricks, )
Client: Hyundai Co. (main contractor) & MEW - Kuwait

Contract value: $ 7, 200, 000

Construction Manager ( civil work) at Petrojet Company Egypt
  • Egypt - Suez
  • December 1999 to September 2006

POSITION: Construction Manager ( civil work)
CONTRACT NAME: Design Development, Construction, Supervision& Maintenance of Administration Building at Bayan Palace

PROJECT: Administration Building at Bayan Palace
(Area of building 23000 m2 for six floors)

Client: Al Diwan Al Amiri - Kuwait
Designer: NBC Engineering
Consultant: The Associated Engineering Partnership

Structural Consultant: Al- Farooqi Engineering Consultants Bureau

Contracts value: $ 90, 000, 000
WORK DESCRIBTION: The work includes: * Earth work 300, 000 m3
* Reinforced concrete 50, 000 m3
* pre-cast concrete 150, 000 m2
* Car parking area 45, 000 m2
* finishing work ( block work, aluminium, raised floor,
marble, false ceiling, parking, )


Jan 2012 - May 2013
Company: Kuwait al- Ghad Company - Kuwait
POSITION: Construction Manager
PROJECT: Infra structure, landscape & Asphalt work

Client: MOD & MOI & PAFH - Kuwait
Contracts value: $ 2, 500, 000
3


Adel Ahmed Gammaz

March 2010 - Dec 2011
Company: Consolidated Contractors Company (CCC) Kuwait

POSITION: Construction Manager
PROJECT: 400KV XLPE Power Cable (Laying & Civil Work)

WORK DESCRIBTION: The work include; * laying cable 100, 000 Mr.
* earth work 500, 000 m3 * joint pit concrete & finishing
* reinforced concrete 3000 m3 * pre-cast concrete 15000 m3

Client: Taihan Electric Co. (main contractor) & MEW - Kuwait

Contract value: $ 17, 000, 000

Apr 2009 - Feb 2010
Company: Consolidated Contractors Company (CCC) Kuwait

POSITION: Construction Manager
PROJECT: Green belt "W" 300KV Substation
WORK DESCRIBTION: The work include;
* Earth Work 40, 000 m3 * Reinforced Concrete 12000 m3
* Finishing Work ( tiles, painting, aluminium, sand lime bricks, )

Client: Hyundai Co. (main contractor) & MEW - Kuwait

Contract value: $ 4, 500, 000
4


Adel Ahmed Gammaz
Apr 2008 - Mar 2009
Company: Consolidated Contractors Company (CCC) Kuwait

POSITION: Construction Manager
PROJECT: Jabber Al Ahmed "W" 300 KV Substation

WORK DESCRIBTION: The work include;
* Earth Work 80, 000 m3 * Reinforced Concrete 12000 m3
* Finishing Work ( tiles, painting, aluminium, sand lime bricks, )

Client: Hyundai Co. . (main contractor) & MEW - Kuwait

Contract value: $ 4, 500, 000

Oct 2006 - Mar 2008
Company: Consolidated Contractors Company (CCC) Kuwait

POSITION: Construction Manager
PROJECTS: * Al Rai "C" 132/11KV Substation
*Salmiya "I" 132/11KV Substation
*Salmiya "F" 132/11KV Substation

WORK DESCRIBTION: The work include;
* Earth Work 60, 000 m3 * Reinforced Concrete 18000 m3
* Finishing Work ( tiles, painting, aluminium, sand lime bricks, )

Client: Hyundai Co. (main contractor) & MEW - Kuwait

Contract value: $ 7, 200, 000
Jan2006 - Sept 2006
Company: Petrojet Company Egypt
POSITION: Construction Manager
PROJECTS: Silos For Yields (we use piles in foundation)

Client: Government-Egypt
Contract value: $ 12, 000, 000
5


Adel Ahmed Gammaz

Oct 2004 - Dec 2005
Company: Petrojet Company Egypt
POSITION: Construction Manager
PROJECTS: * Coker Heater 12 h-1
* Maintenance of Tanks

Client: Al-Suez Petroleum Company-Egypt
Contract value: $ 4, 500, 000

Jan 2003 - Oct 2004
Company: Petrojet Company Egypt
POSITION: Construction Manager
PROJECTS: Sumed co. port Development -Egypt
(Work include; Roads, Platform, boundary wall)

Client: Sumed Company
Contract value: $ 3, 000, 000

Jan 2002 - Dec 2002
Company: Petrojet Company Egypt
POSITION: Construction Manager
PROJECTS: Agroud Station
(Work include; buildings, tanks foundation, roads& paving)
* Concrete Quantity 50, 000 m3

Client: Al-Suez Petroleum Company-Egypt
Contract value: $ 18, 000, 000
\
6
Adel Ahmed Gammaz

Construction Manager at Petrojet Company Egypt
  • Egypt - Suez
  • January 2006 to September 2006

Jan2006 - Sept 2006
Company: Petrojet Company Egypt
POSITION: Construction Manager
PROJECTS: Silos For Yields (we use piles in foundation)

Client: Government-Egypt
Contract value: $ 12, 000, 000
5
Adel Ahmed Gammaz

Construction Manager at Petrojet Company Egypt
  • Egypt - Suez
  • October 2004 to December 2005

Oct 2004 - Dec 2005
Company: Petrojet Company Egypt
POSITION: Construction Manager
PROJECTS: * Coker Heater 12 h-1
* Maintenance of Tanks

Construction Manager at Petrojet Company Egypt
  • Egypt - Suez
  • January 2003 to October 2004

02 years experience in the field of Civil
Construction.
Skills
• Project Management& Engineering knowledge
• The ability to analyze complex data.
• Management of risk, resources and time.
• Supervisory Skills& Team Leadership
• Computer skills.
• Clear written and oral communication skills.
• Creative approach to solving problems.
2


Adel Ahmed Gammaz
Work Experience
Jun 2013 - till to date
Company: Kharafi National Company - Kuwait

Construction Manager ( civil work) at Petrojet Company Egypt
  • Egypt - Suez
  • January 2003 to October 2004

POSITION: Construction Manager ( civil work)
CONTRACT NAME: Design Development, Construction, Supervision& Maintenance of Administration Building at Bayan Palace

PROJECT: Administration Building at Bayan Palace
(Area of building 23000 m2 for six floors)

Client: Al Diwan Al Amiri - Kuwait
Designer: NBC Engineering
Consultant: The Associated Engineering Partnership

Structural Consultant: Al- Farooqi Engineering Consultants Bureau

Contracts value: $ 90, 000, 000
WORK DESCRIBTION: The work includes: * Earth work 300, 000 m3
* Reinforced concrete 50, 000 m3
* pre-cast concrete 150, 000 m2
* Car parking area 45, 000 m2
* finishing work ( block work, aluminium, raised floor,
marble, false ceiling, parking, )


Jan 2012 - May 2013
Company: Kuwait al- Ghad Company - Kuwait
POSITION: Construction Manager
PROJECT: Infra structure, landscape & Asphalt work

Client: MOD & MOI & PAFH - Kuwait
Contracts value: $ 2, 500, 000
3


Adel Ahmed Gammaz

March 2010 - Dec 2011
Company: Consolidated Contractors Company (CCC) Kuwait

POSITION: Construction Manager
PROJECT: 400KV XLPE Power Cable (Laying & Civil Work)

WORK DESCRIBTION: The work include; * laying cable 100, 000 Mr.
* earth work 500, 000 m3 * joint pit concrete & finishing
* reinforced concrete 3000 m3 * pre-cast concrete 15000 m3

Client: Taihan Electric Co. (main contractor) & MEW - Kuwait

Contract value: $ 17, 000, 000

Apr 2009 - Feb 2010
Company: Consolidated Contractors Company (CCC) Kuwait

POSITION: Construction Manager
PROJECT: Green belt "W" 300KV Substation
WORK DESCRIBTION: The work include;
* Earth Work 40, 000 m3 * Reinforced Concrete 12000 m3
* Finishing Work ( tiles, painting, aluminium, sand lime bricks, )

Client: Hyundai Co. (main contractor) & MEW - Kuwait

Contract value: $ 4, 500, 000
4


Adel Ahmed Gammaz
Apr 2008 - Mar 2009
Company: Consolidated Contractors Company (CCC) Kuwait

POSITION: Construction Manager
PROJECT: Jabber Al Ahmed "W" 300 KV Substation

WORK DESCRIBTION: The work include;
* Earth Work 80, 000 m3 * Reinforced Concrete 12000 m3
* Finishing Work ( tiles, painting, aluminium, sand lime bricks, )

Client: Hyundai Co. . (main contractor) & MEW - Kuwait

Contract value: $ 4, 500, 000

Oct 2006 - Mar 2008
Company: Consolidated Contractors Company (CCC) Kuwait

POSITION: Construction Manager
PROJECTS: * Al Rai "C" 132/11KV Substation
*Salmiya "I" 132/11KV Substation
*Salmiya "F" 132/11KV Substation

WORK DESCRIBTION: The work include;
* Earth Work 60, 000 m3 * Reinforced Concrete 18000 m3
* Finishing Work ( tiles, painting, aluminium, sand lime bricks, )

Client: Hyundai Co. (main contractor) & MEW - Kuwait

Contract value: $ 7, 200, 000
Jan2006 - Sept 2006
Company: Petrojet Company Egypt
POSITION: Construction Manager
PROJECTS: Silos For Yields (we use piles in foundation)

Client: Government-Egypt
Contract value: $ 12, 000, 000
5


Adel Ahmed Gammaz

Oct 2004 - Dec 2005
Company: Petrojet Company Egypt
POSITION: Construction Manager
PROJECTS: * Coker Heater 12 h-1
* Maintenance of Tanks

Client: Al-Suez Petroleum Company-Egypt
Contract value: $ 4, 500, 000

Jan 2003 - Oct 2004
Company: Petrojet Company Egypt
POSITION: Construction Manager
PROJECTS: Sumed co. port Development -Egypt
(Work include; Roads, Platform, boundary wall)

Construction Manager at Petrojet Company Egypt
  • Egypt - Suez
  • January 2002 to December 2002

02 years experience in the field of Civil
Construction.
Skills
• Project Management& Engineering knowledge
• The ability to analyze complex data.
• Management of risk, resources and time.
• Supervisory Skills& Team Leadership
• Computer skills.
• Clear written and oral communication skills.
• Creative approach to solving problems.
2


Adel Ahmed Gammaz
Work Experience
Jun 2013 - till to date
Company: Kharafi National Company - Kuwait

Construction Manager at Petrojet Company Egypt
  • Egypt - Suez
  • December 1999 to December 2001

Dec 1999 - Dec 2001
Company: Petrojet Company Egypt
POSITION: Construction Manager
PROJECTS: Jet Beach Resort
(Work include; buildings, drainage, landscape,
swimming pool, drainage treatment unit, finishing.)
* Area of work 150, 000 m2

Project Engineer at Petrojet Co
  • Egypt - Suez
  • October 1998 to December 1999

02 years experience in the field of Civil
Construction.
Skills
• Project Management& Engineering knowledge
• The ability to analyze complex data.
• Management of risk, resources and time.
• Supervisory Skills& Team Leadership
• Computer skills.
• Clear written and oral communication skills.
• Creative approach to solving problems.
2


Adel Ahmed Gammaz
Work Experience
Jun 2013 - till to date
Company: Kharafi National Company - Kuwait
POSITION: Construction Manager ( civil work)
CONTRACT NAME: Design Development, Construction, Supervision& Maintenance of Administration Building at Bayan Palace

PROJECT: Administration Building at Bayan Palace
(Area of building 23000 m2 for six floors)

Client: Al Diwan Al Amiri - Kuwait
Designer: NBC Engineering
Consultant: The Associated Engineering Partnership

Structural Consultant: Al- Farooqi Engineering Consultants Bureau

Contracts value: $ 90, 000, 000
WORK DESCRIBTION: The work includes: * Earth work 300, 000 m3
* Reinforced concrete 50, 000 m3
* pre-cast concrete 150, 000 m2
* Car parking area 45, 000 m2
* finishing work ( block work, aluminium, raised floor,
marble, false ceiling, parking, )


Jan 2012 - May 2013
Company: Kuwait al- Ghad Company - Kuwait
POSITION: Construction Manager
PROJECT: Infra structure, landscape & Asphalt work

Client: MOD & MOI & PAFH - Kuwait
Contracts value: $ 2, 500, 000
3


Adel Ahmed Gammaz

March 2010 - Dec 2011
Company: Consolidated Contractors Company (CCC) Kuwait

POSITION: Construction Manager
PROJECT: 400KV XLPE Power Cable (Laying & Civil Work)

WORK DESCRIBTION: The work include; * laying cable 100, 000 Mr.
* earth work 500, 000 m3 * joint pit concrete & finishing
* reinforced concrete 3000 m3 * pre-cast concrete 15000 m3

Client: Taihan Electric Co. (main contractor) & MEW - Kuwait

Contract value: $ 17, 000, 000

Apr 2009 - Feb 2010
Company: Consolidated Contractors Company (CCC) Kuwait

POSITION: Construction Manager
PROJECT: Green belt "W" 300KV Substation
WORK DESCRIBTION: The work include;
* Earth Work 40, 000 m3 * Reinforced Concrete 12000 m3
* Finishing Work ( tiles, painting, aluminium, sand lime bricks, )

Client: Hyundai Co. (main contractor) & MEW - Kuwait

Contract value: $ 4, 500, 000
4


Adel Ahmed Gammaz
Apr 2008 - Mar 2009
Company: Consolidated Contractors Company (CCC) Kuwait

POSITION: Construction Manager
PROJECT: Jabber Al Ahmed "W" 300 KV Substation

WORK DESCRIBTION: The work include;
* Earth Work 80, 000 m3 * Reinforced Concrete 12000 m3
* Finishing Work ( tiles, painting, aluminium, sand lime bricks, )

Client: Hyundai Co. . (main contractor) & MEW - Kuwait

Contract value: $ 4, 500, 000

Oct 2006 - Mar 2008
Company: Consolidated Contractors Company (CCC) Kuwait

POSITION: Construction Manager
PROJECTS: * Al Rai "C" 132/11KV Substation
*Salmiya "I" 132/11KV Substation
*Salmiya "F" 132/11KV Substation

WORK DESCRIBTION: The work include;
* Earth Work 60, 000 m3 * Reinforced Concrete 18000 m3
* Finishing Work ( tiles, painting, aluminium, sand lime bricks, )

Client: Hyundai Co. (main contractor) & MEW - Kuwait

Contract value: $ 7, 200, 000
Jan2006 - Sept 2006

Project Engineer at Petrojet Company Egypt
  • Egypt
  • October 1994 to December 1999

Company: Petrojet Company Egypt
POSITION: Construction Manager
PROJECTS: Silos For Yields (we use piles in foundation)

Client: Government-Egypt
Contract value: $ 12, 000, 000
5


Adel Ahmed Gammaz

Oct 2004 - Dec 2005
Company: Petrojet Company Egypt
POSITION: Construction Manager
PROJECTS: * Coker Heater 12 h-1
* Maintenance of Tanks

Client: Al-Suez Petroleum Company-Egypt
Contract value: $ 4, 500, 000

Jan 2003 - Oct 2004
Company: Petrojet Company Egypt
POSITION: Construction Manager
PROJECTS: Sumed co. port Development -Egypt
(Work include; Roads, Platform, boundary wall)

Client: Sumed Company
Contract value: $ 3, 000, 000

Jan 2002 - Dec 2002
Company: Petrojet Company Egypt
POSITION: Construction Manager
PROJECTS: Agroud Station
(Work include; buildings, tanks foundation, roads& paving)
* Concrete Quantity 50, 000 m3

Client: Al-Suez Petroleum Company-Egypt
Contract value: $ 18, 000, 000
\
6


Adel Ahmed Gammaz
Dec 1999 - Dec 2001
Company: Petrojet Company Egypt
POSITION: Construction Manager
PROJECTS: Jet Beach Resort
(Work include; buildings, drainage, landscape,
swimming pool, drainage treatment unit, finishing.)
* Area of work 150, 000 m2

Client: Petrojet Co.- Egypt
Contract value: $ 6, 000, 000

Oct 1998 - Dec 1999
Company: Petrojet Company Egypt
POSITION: Project Engineer
PROJECTS: Residential Building
Client: Al- Nasr Petroleum Company-Egypt
Contract value: $ 800, 000

Project Engineer at Petrojet Company Egypt
  • Egypt - Suez
  • January 1997 to October 1998

Jan 1997- Oct 1998
Company: Petrojet Company Egypt
POSITION: Project Engineer
PROJECTS: Meeting hall building
Client: Al- Nasr Petroleum Company-Egypt
Contract value: $ 1, 300, 000
7
Adel Ahmed Gammaz

Site Engineer at Petrojet Company Egypt
  • Egypt - Suez
  • October 1994 to December 1996

Oct 1994 - Dec 1996
Company: Petrojet Company Egypt
POSITION: Site Engineer
PROJECTS: Pipe racks
(work include; earth work, foundation, anchors.)
*Length of work 3000 Mr.

Client: Al- Nasr Petroleum Company-Egypt
Contract value: $ 2, 000, 000

.


Oct 1994 - Dec 1996
Company: Petrojet Company Egypt
POSITION: Site Engineer
PROJECTS: Crude Oil distillation unit
(Work include; foundation, drainage system,
pipe racks, paving, fire proofing, ..)

Client: Al-Nasr Petroleum Company-Egypt
Contract value: $ 16, 000, 000
8


Adel Ahmed Gammaz

Education

Bachelor's degree, Civil Engineering
  • at Zagazig University
  • January 1993

*BSc - Civil Engineering - 1993 *Zagazig University, *Grade, very good (81.5%), *Egypt MEMBERSHIP: *Kuwait Society of Engineers *Egyptian Engineers Syndicate

Specialties & Skills

AUTO BODY
CONCRETE
DRAINAGE
EARTH WORK
ENGINEER
FINISHING
PAINTING
PETROLEUM
REINFORCED CONCRETE

Languages

Arabic
Expert
English
Expert

Hobbies

  • fishing, football