Senior Resident Engineer
Italconsult
Total years of experience :41 years, 6 Months
Core Strategic Responsibilities:
• Act as Engineer's Representative.
• Coordinate with the Departments, Consultants and
Contractors.
• Liaise with other Authorities.
• Liaise with Department and approve Contractor's
submissions.
• Coordinate forward planning.
• Be fully conversant with the Contract Terms and Conditions.
• Implement the terms and conditions of Contract.
• Generally supervise, review, monitor and report on progress.
• Liaise with all parties for site safety.
• Convene and chair regular site meetings.
• Issue additional drawings etc.as required.
• Provide technical leadership to his team.
• Coordinate and monitor activities of his team.
• Ensure prompt exchange of correspondence and approvals.
• Ensure accuracy and completeness of records according to
ISO 9001.
• Maintain awareness of contracts financial status.
• Give final approval to Works and arrange Handover
Act as Engineer's Representative.
• Coordinate with the Departments, Consultants and Contractors.
• Liaise with other Authorities.
• Liaise with Department and approve Contractor's submissions.
• Coordinate forward planning.
• Be fully conversant with the Contract Terms and Conditions.
• Implement the terms and conditions of Contract.
• Generally supervise, review, monitor and report on progress.
• Liaise with all parties for site safety.
• Convene and chair regular site meetings.
• Issue additional drawings etc.as required.
• Provide technical leadership to his team.
• Coordinate and monitor activities of his team.
• Ensure prompt exchange of correspondence and approvals.
• Ensure accuracy and completeness of records according to ISO 9001.
• Maintain awareness of contracts financial status.
• Give final approval to Works and arrange Handover
Client: Dubai Municipality (DM) UAE - Sewerage and irrigation
department..
PROJECT: DS198-Upgrading Of Subsidiary Sewage Pumping
Station G1 To G7. Sewerage Gravity pipeline, NDM works by Micro
Tunneling 14200 L.M Works From 900mm.Dia. To 2200mm Dia. And
all Temporary .and permanents reinstatement Roads Works And
construct New Pump station G 1775 L/S
PROJECT VALUE: 400 Millions Dhs.
Client: The EWAN -Architectural & Engineering Consultancy. Abu Dhabi-U.A.E.
Client: The Executive Committee For The Presidential Palace Project.
PROJECT: PRESIDENTIAL PALACE ABU DHABI -UAE - (PPIS) Infrastructures & roads Package works. Storm water, sewerage( gravity, force main and lifting stations), irrigation, potable water, NDM works by Pipe jacking / Micro Tunneling 975 L.M Works 1200 mm To 2400 mmDia., soft and hard landscaping works street lighting, cctv and roads works.
PROJECT VALUE: 890 Millions Dhs
Jumira International Consultant. Dubai-U.A.E
Client: Command Military Works (CMW) UAE
- Miscellaneous works at various location North Emirates (roads Package works, Storm water, sewerage (gravity, force main and lifting stations), irrigation, and potable water works, NDM works by Pipe jacking / Micro Tunneling 845 L.M Works900 mm Dia. TO 1800 mm Dia.. And all Temporary .and permanents reinstatement Roads Works
Client: Dubai Municipality (DM) UAE - Sewerage and irrigation
department.
PROJECT: DS-128 Irrigation main For ALAweer Farm.
GRP pipelines1800mm dia. to 500mmdia. With 35 KM Length,
associated 95 No valve chambers, NDM works by Pipe jacking /
Micro Tunneling 1500 L.M 1000 To 1800mm Dia. &2Nos Ground
Tanks 1M Gallons and 2Nos Booster Pump Station 2000 L/Sec 65
mts head. And all Temporary .and permanents reinstatement Roads
Works
PROJECT VALUE: 111 Millions Dhs.
AAW CONSULTING ENGINEERS (AAW). Dubai-U.A.E
Client: Dubai Electricity & Water Authority (DEWA) UAE
PROJECT: CW 035/05 Supply, Installation and Commissioning of Fibrocement Pipeline 900 -1200mm Dia., 60 KM Length. Class 40, 24&18 & Associated 150 No valve chambers, NDM works by Pipe jacking / Micro Tunneling 1150 L.M Works1200 mm Dia. and all the permanent reinstatement works for all Roads and paved area with interlock from AL Madam Roundabout to HATTA.
PROJECT VALUE: 114 Million Dhs.
Miscellaneous CFLCC Projects Various Locations -
Kuwait
Contract Number: W912ER-04-D-0001-0003.
Supply, Installation and Commissioning of D.I Pipeline 600 mm
Dia., 25 KM Length. & associated 50 No valve chambers, NDM
works by Pipe jacking / Micro Tunneling 580 L.M Works 1000mm
Dia. And all Temporary .and permanents reinstatement Roads Works
required for - Camp Udairy, Camp Virginia and Ali Alsalem AIR
Base...
PROJECT VALUE: 23 Millions (U.S.D
NLG Project Damietta Export Facilities for
Construction Jetty by Driving 130Nos of steel piles 1220mm dia.
&1520mm by hydro hammer, Precast and cast in-situ beams, slabs
and piles for Jetty Head, Landing Bridge, Fire Water Plat Form,
Breasting Dolphin and Mooring Dolphin Works, Buckling Fender,
Triple and double Quick Release Hooks 100 Ton, Safety rails,
Expansion joint, bearing, Catwalk and all Asphalt Roads, street
lighting, Water pipeline for domestics use & fire fighting.
PROJECT VALUE: 20 Million (U.S. Dollars
Damietta port project Extension of the grain quay no 13
at Damietta port with length 600 L.M & 14 ms deep. Driving sheet
piles, dredging works, crown beams, capping beams, rear beams,
substation, fresh water networks, asphalt road works, power and
potable water intake, fender & bollard works. And all Temporary
.and permanents reinstatement Roads Works
PROJECT VALUE: 115 Million (Egyptian Pound
Mussafah New Industrial City Contract No. 147/10.
roads Package works, Sewerage (gravity, force main and lifting
stations) and storm water networks NDM works by Pipe jacking /
Development & rehabilitation Demitta Sewerage
Networks, Force main and Pumps Station
PROJECT VALUE: 65 Millions (Egyptian Pound
Execution & Maintenance of Ground Tanks, Main
Pipeline 1200mm dia. from ALDAMAM to RIYADH city, NDM
works by Pipe jacking / Micro Tunneling 1650 L.M Works & all
associated works for permanent reinstatement for all type of paved
area ( Asphalt, concrete and Interlock
New Demitta City \[Transmission and distribution water
pipelines, Force Main, Gravity Sewer Network, NDM works by Pipe
jacking / Micro Tunneling 650 L.M Works & Pump Station\].
PROJECT VALUE: 60 Millions (Egyptian Pound
New Demitta Port \[roads Package works, Water
networks, Ground, elevated tanks, Booster pump station, gravity
sewerage and force main)
PROJECT VALUE: 40 Millions (Egyptian Pound ).
:
: