Eng. Adel Khalaf (PMP Certified), Senior Resident Engineer

Eng. Adel Khalaf (PMP Certified)

Senior Resident Engineer

Italconsult

Lieu
Émirats Arabes Unis - Dubaï
Éducation
Etudes secondaires ou équivalent,
Expérience
41 years, 7 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :41 years, 7 Mois

Senior Resident Engineer à Italconsult
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis novembre 1982
  • Je travaille ici depuis novembre 1982
Projects Manager
  • Je travaille ici depuis novembre 1982

Core Strategic Responsibilities:
• Act as Engineer's Representative.
• Coordinate with the Departments, Consultants and
Contractors.
• Liaise with other Authorities.
• Liaise with Department and approve Contractor's
submissions.
• Coordinate forward planning.
• Be fully conversant with the Contract Terms and Conditions.
• Implement the terms and conditions of Contract.
• Generally supervise, review, monitor and report on progress.
• Liaise with all parties for site safety.
• Convene and chair regular site meetings.
• Issue additional drawings etc.as required.
• Provide technical leadership to his team.
• Coordinate and monitor activities of his team.
• Ensure prompt exchange of correspondence and approvals.
• Ensure accuracy and completeness of records according to
ISO 9001.
• Maintain awareness of contracts financial status.
• Give final approval to Works and arrange Handover

Senior Resident Engineer à ITAL CONSULT
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis juillet 2014

Act as Engineer's Representative.
• Coordinate with the Departments, Consultants and Contractors.
• Liaise with other Authorities.
• Liaise with Department and approve Contractor's submissions.
• Coordinate forward planning.
• Be fully conversant with the Contract Terms and Conditions.
• Implement the terms and conditions of Contract.
• Generally supervise, review, monitor and report on progress.
• Liaise with all parties for site safety.
• Convene and chair regular site meetings.
• Issue additional drawings etc.as required.
• Provide technical leadership to his team.
• Coordinate and monitor activities of his team.
• Ensure prompt exchange of correspondence and approvals.
• Ensure accuracy and completeness of records according to ISO 9001.
• Maintain awareness of contracts financial status.
• Give final approval to Works and arrange Handover

à U.A.E
  • Émirats Arabes Unis
  • Je travaille ici depuis avril 2016

Client: Dubai Municipality (DM) UAE - Sewerage and irrigation
department..
PROJECT: DS198-Upgrading Of Subsidiary Sewage Pumping
Station G1 To G7. Sewerage Gravity pipeline, NDM works by Micro
Tunneling 14200 L.M Works From 900mm.Dia. To 2200mm Dia. And
all Temporary .and permanents reinstatement Roads Works And
construct New Pump station G 1775 L/S
PROJECT VALUE: 400 Millions Dhs.

Senior Resident Engineer à EWAN –Architectural & Engineering
  • Émirats Arabes Unis - Abu Dhabi
  • février 2013 à juin 2014

Client: The EWAN -Architectural & Engineering Consultancy. Abu Dhabi-U.A.E.
Client: The Executive Committee For The Presidential Palace Project.
PROJECT: PRESIDENTIAL PALACE ABU DHABI -UAE - (PPIS) Infrastructures & roads Package works. Storm water, sewerage( gravity, force main and lifting stations), irrigation, potable water, NDM works by Pipe jacking / Micro Tunneling 975 L.M Works 1200 mm To 2400 mmDia., soft and hard landscaping works street lighting, cctv and roads works.
PROJECT VALUE: 890 Millions Dhs

Senior Resident Engineer à EWAN –Engineering
  • Émirats Arabes Unis
  • février 2013 à juin 2014
Senior Resident Engineer à Jumira International
  • Émirats Arabes Unis - Dubaï
  • octobre 2010 à janvier 2013

Jumira International Consultant. Dubai-U.A.E
Client: Command Military Works (CMW) UAE
- Miscellaneous works at various location North Emirates (roads Package works, Storm water, sewerage (gravity, force main and lifting stations), irrigation, and potable water works, NDM works by Pipe jacking / Micro Tunneling 845 L.M Works900 mm Dia. TO 1800 mm Dia.. And all Temporary .and permanents reinstatement Roads Works

Senior Resident Engineer à AAW
  • Émirats Arabes Unis - Dubaï
  • novembre 2008 à septembre 2010

Client: Dubai Municipality (DM) UAE - Sewerage and irrigation
department.
PROJECT: DS-128 Irrigation main For ALAweer Farm.
GRP pipelines1800mm dia. to 500mmdia. With 35 KM Length,
associated 95 No valve chambers, NDM works by Pipe jacking /
Micro Tunneling 1500 L.M 1000 To 1800mm Dia. &2Nos Ground
Tanks 1M Gallons and 2Nos Booster Pump Station 2000 L/Sec 65
mts head. And all Temporary .and permanents reinstatement Roads
Works
PROJECT VALUE: 111 Millions Dhs.

Resident Engineer à AAW CONSULTING ENGINEERS (AAW)
  • Émirats Arabes Unis
  • août 2005 à septembre 2010
Senior Resident Engineer à AAW
  • Émirats Arabes Unis - Dubaï
  • août 2005 à octobre 2008

AAW CONSULTING ENGINEERS (AAW). Dubai-U.A.E
Client: Dubai Electricity & Water Authority (DEWA) UAE
PROJECT: CW 035/05 Supply, Installation and Commissioning of Fibrocement Pipeline 900 -1200mm Dia., 60 KM Length. Class 40, 24&18 & Associated 150 No valve chambers, NDM works by Pipe jacking / Micro Tunneling 1150 L.M Works1200 mm Dia. and all the permanent reinstatement works for all Roads and paved area with interlock from AL Madam Roundabout to HATTA.
PROJECT VALUE: 114 Million Dhs.

Project Manager à AICI/ Syska/ Archirodon LLC
  • juillet 2004 à juillet 2005
PROJECT à AICI/Syska/Archirodon LLC Kuwai
  • juillet 2004 à juillet 2005

Miscellaneous CFLCC Projects Various Locations -
Kuwait
Contract Number: W912ER-04-D-0001-0003.
Supply, Installation and Commissioning of D.I Pipeline 600 mm
Dia., 25 KM Length. & associated 50 No valve chambers, NDM
works by Pipe jacking / Micro Tunneling 580 L.M Works 1000mm
Dia. And all Temporary .and permanents reinstatement Roads Works
required for - Camp Udairy, Camp Virginia and Ali Alsalem AIR
Base...
PROJECT VALUE: 23 Millions (U.S.D

PROJECT à ARCHIRODON CONSTRUCTION (OVERSEAS) CO.S
  • Émirats Arabes Unis
  • août 2003 à juin 2004

NLG Project Damietta Export Facilities for
Construction Jetty by Driving 130Nos of steel piles 1220mm dia.
&1520mm by hydro hammer, Precast and cast in-situ beams, slabs
and piles for Jetty Head, Landing Bridge, Fire Water Plat Form,
Breasting Dolphin and Mooring Dolphin Works, Buckling Fender,
Triple and double Quick Release Hooks 100 Ton, Safety rails,
Expansion joint, bearing, Catwalk and all Asphalt Roads, street
lighting, Water pipeline for domestics use & fire fighting.
PROJECT VALUE: 20 Million (U.S. Dollars

Project Manager à Archirodon Construction (Overseas) Co.S
  • Émirats Arabes Unis
  • août 2003 à juin 2004
PROJECT à The Arab Contractors- North Delta Br
  • Egypte
  • juillet 2001 à juillet 2003

Damietta port project Extension of the grain quay no 13
at Damietta port with length 600 L.M & 14 ms deep. Driving sheet
piles, dredging works, crown beams, capping beams, rear beams,
substation, fresh water networks, asphalt road works, power and
potable water intake, fender & bollard works. And all Temporary
.and permanents reinstatement Roads Works
PROJECT VALUE: 115 Million (Egyptian Pound

Project Manager à The Arab Contractors- North Delta Br
  • Egypte
  • juillet 2001 à juillet 2003
PROJECT à Micro Tunneling 1200 L.M Works
  • Émirats Arabes Unis
  • décembre 1997 à juin 2001

Mussafah New Industrial City Contract No. 147/10.
roads Package works, Sewerage (gravity, force main and lifting
stations) and storm water networks NDM works by Pipe jacking /

Project Manager à The Arab Contractors - Abu
  • Émirats Arabes Unis
  • février 1997 à juin 2001
Project Manager à The Arab Contractors - North Delta Br
  • Egypte
  • octobre 1994 à janvier 1997
PROJECT à The Arab Contractors - North Delta Br
  • Émirats Arabes Unis
  • octobre 1994 à janvier 1997

Development & rehabilitation Demitta Sewerage
Networks, Force main and Pumps Station
PROJECT VALUE: 65 Millions (Egyptian Pound

Construction Manager à Water &
  • Émirats Arabes Unis
  • février 1991 à septembre 1994
PROJECT à Water & Sewerage Authority
  • Émirats Arabes Unis
  • février 1991 à septembre 1994

Execution & Maintenance of Ground Tanks, Main
Pipeline 1200mm dia. from ALDAMAM to RIYADH city, NDM
works by Pipe jacking / Micro Tunneling 1650 L.M Works & all
associated works for permanent reinstatement for all type of paved
area ( Asphalt, concrete and Interlock

Project Engineer à The Arab Contractors
  • Egypte
  • septembre 1988 à janvier 1991
PROJECT à The Arab Contractors
  • Egypte
  • septembre 1988 à janvier 1991

New Demitta City \[Transmission and distribution water
pipelines, Force Main, Gravity Sewer Network, NDM works by Pipe
jacking / Micro Tunneling 650 L.M Works & Pump Station\].
PROJECT VALUE: 60 Millions (Egyptian Pound

Junior Engineer à The Arab Contractors- TANTA
  • Egypte
  • novembre 1982 à août 1988
PROJECT à The Arab Contractors
  • Egypte
  • novembre 1982 à août 1988

New Demitta Port \[roads Package works, Water
networks, Ground, elevated tanks, Booster pump station, gravity
sewerage and force main)
PROJECT VALUE: 40 Millions (Egyptian Pound ).

Éducation

Etudes secondaires ou équivalent,
  • à Project Management Institute
  • mars 2010

:

Baccalauréat, Civil Engineering
  • à Suez Canal University - Faculty of Engineering
  • janvier 1999

:

Specialties & Skills

Project Management
CONTRACT MANAGEMENT
CUSTOMER RELATIONS
ENGINEERING
FINANCIAL
ISO 9000
LEADERSHIP
MEETING FACILITATION
MICROSOFT EXCHANGE
MICROSOFT WORKS

Langues

Arabe
Expert
Anglais
Expert