Ahmad  Badawy CCM PMP RMP, Project Manager, Construction, Quality, MEP, Utilities, Civil, Geotech,  Fit-Out

Ahmad Badawy CCM PMP RMP

Project Manager, Construction, Quality, MEP, Utilities, Civil, Geotech, Fit-Out

Parsons - Saudi Arabia

Lieu
Arabie Saoudite - Province de l'Est
Éducation
Baccalauréat, Mechanical Engineering - Power Section
Expérience
21 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :21 years, 11 Mois

Project Manager, Construction, Quality, MEP, Utilities, Civil, Geotech, Fit-Out à Parsons - Saudi Arabia
  • Arabie Saoudite - Dammam
  • octobre 2018 à décembre 2023

- Plan, organize and manage project activities, including schedules and funds, designs, plans, specifications, cost estimates and special technical studies or tests, and environmental reports.
- Complete administration of the Construction contracts, involving all relevant internal and external stakeholders and ensuring technical feasibility.
- Perform with the team constructability review during design phases, analyzes solicitations (RFQs & RFPs) and develop solicitation compliance strategy as well as preparation of compliance matrix for each solicitation response.
- Ensure Contractor compliance with task order schedules, plans, specifications, etc. Identifies actual or potential problems & recommends changes as necessary.
- Perform project quality management duties, preparing quality assurance plans, reviewing, approving and monitoring submittals and plans.
- Develop a detailed project plan to monitor and track progress and monthly payment.
- Manage changes to project scope, schedule and costs using appropriate verification techniques.
- Measure performance using appropriate project management tools and techniques.
- Managing project per FAR, FIDIC and other contractual principles
- Manage the relationship with the client and project interface with relevant stakeholders such as other packages Contractors, Royal Commission, Ministry of Defense and Interior, Saudi electricity Company SEC, Marafiq
- Plan and manage project testing and Commissioning T&C activities and groups in addition to project close out phase until handing over to End User
- Oversees establishment of the Construction Management Plan, Site Specific Health and Safety Plan, Quality Assurance/Quality Control Plan, and other documents as required.
- Assists the Estimating Leads for historical data and estimate database management with the accumulation, evaluation, and documentation of cost data retrieved from completed discrete design and/or construction contract.
- Provide inputs to the project procurement, budget, and cost control to ensure procurement of materials and disbursal of funds for the projects are in line End User requirements.
- Attending/chairing and minuting all Project Meetings relating to: Design approvals, Contractor’s progress, commercial, risk and any others with a bearing on the Project's success.
- Provide a detailed monthly report and interim updates on key topics as required, including but not limited to: Executive Summary, progress, key risks and Issues, payment Status and cash flow projections, claims narrations instructions status, Insurances/Bonds/Guarantees, RFI Status, Approvals/NOC Status, Shop drawing/submittal status, 3 months look ahead, design issues, site activity/progress photographs, health and safety reporting, appendices to include The Main Contractors monthly report and other relevant submissions

Scope of work
(Steel structural, Pre-cast, residential and industrial buildings, offices, building Architectural finishes, Landscape, in addition to MEP, Water, Electrical, Telecommunication and Sewer Networks, Asphalt Roads, Taxiway, Apron, Storm Drainage, Fence, Observation Towers, Lifting Stations, Water & Fire Tanks, Pumps, Geotechnical Investigation and Soil Improvement)

MEP, Utilities Projects Director à Al Mashariq for Contracting
  • Arabie Saoudite - Dammam
  • août 2016 à octobre 2018

1- Collaborate with engineers, architects etc. to determine the specifications of the project
2- Oversee and direct construction projects from conception to completion
3- Review the project in-depth to schedule deliverable and estimate costs
4- Coordinate and direct construction projects engineers and subcontractors
5- Overseeing project procurement, materials and equipment and track inventory
5- Meet contractual conditions of performance and control Project Budget
6- Prepare internal and external reports pertaining to job status on monthly basis
7- Plan ahead to prevent problems and resolve any emerging ones
8- Negotiate terms of agreements, draft contracts and obtain permits, manage and
mitigate risks
9- Planning and coordinating Division work and resources
10- Leading and directing Tender/Proposal process
11- Current/new awards Projects Budget Analysis and budget variance study
12- Track with PMO project cost and schedule on Monthly and weekly basis
13- Managing Risk of Projects
14- Managing Division/ projects Vendor assessment, bid evaluation, subcontractor selection and procurement activities
15- Overseeing Technical/Engineering works of in progress projects
16- Assisting/Guiding Division Project Managers
17- Managing Division business development to expand business market by targeting new potential clients.
18- Managing company Projects activities, such as, tendering, estimation, technical office,
Procurement and execution
19- Developing the division working strategy with MEP market requirements
20- Working with cost control and finance departments for ongoing project to achieve the targeted
probability
20- Managing and developing division resources with HR division.
21- Optimize division over heads and assets operation and maintenance rate
22- Planning ongoing and upcoming projects to achieve the division targeted profit and budget
23- Carrying needed business development activities to widen the division markets
24- Negotiate terms of agreements, draft contracts and obtain permits, manage and
Mitigate risks
25- Ensure QHSE requirements and the use of proper construction techniques

Construction Manager - Mechanical Section Head Combined Cycle Power Plant CCPP à Archirodon Overseas
  • Egypte - Le Caire
  • janvier 2016 à juillet 2016

Working as Mechanical Section head at West Domitta Power Plant, responsible for contract administration, projects management, planning, and control with through all project stages, engineering, construction, commissioning and handing over in addition to tendering, cost estimation for new tenders and procurement activates

MEP & Utilities Assistant Manager - Project Manager à Emaar Misr for Development
  • Egypte - Le Caire
  • mai 2015 à janvier 2016

Nature of Work:
Management the delivery of very high-end residential properties for Up-Town Cairo Compound from concept design to property handing over to Owner. The compound has buildings, villas, potable and sewer network, water pumping stations in addition to irrigation station and city clubs, swimming pools, kids area, electrical distribution networks, villages and roads lighting
• Implement comprehensive preventative maintenance program.
• Implement MEP project plans for real estate construction projects, ensuring timely completion and compliance with safety and quality standards.
• Coordinate with architects, consultants, and contractors to ensure seamless integration of MEP and utilities systems into the overall construction plan.
• Monitor and track project progress, identifying and resolving any bottlenecks or issues that may arise during execution.
• Oversee the design and layout of MEP systems and Utilities, ensuring they meet the required codes, regulations, and industry standards.
• Review MEP drawings, specifications, and technical submittals to ensure accuracy and compliance with project requirements.
• Facilitate effective coordination between the Contractors and utilities companies to avoid clashes and conflicts in system construction.
• Conduct regular meetings with project Contractors and Consultants to address issues, provide guidance, and ensure a smooth workflow throughout the construction process.
• Identify cost-saving opportunities without compromising the quality and functionality of MEP systems.
• Conduct regular inspections and audits of MEP work to identify defects, deviations, and potential improvements.
• Monitor vendor performance and maintain good working relationships to ensure timely delivery of materials and services.
• Ensure strict adherence to health and safety protocols during the installation of MEP systems.
• Introduce innovative solutions and technologies to improve the efficiency and performance of MEP systems in real estate projects.

Senior Project Engineer / Quality Assurance à US Army Corps of Engineers - Middle East District
  • Egypte - Le Caire
  • septembre 2009 à avril 2015

• Working as Project Engineer at US Army Corps of Engineers Middle East District with responsibility for reviewing contractor plans, cost breakdown proposals study, baselines, schedules updates and submittals, responding to RFIs issued by contractor plus participating in project changes plan surfaced during the project age, in addition to, acting as Senior QA engineer supervising, inspecting and monitoring of the Contractor quality control system of the of construction, commissioning and starting up, systems in assigned projects include but not limited to MEP and infrastructural works such as sewer, water and electrical distribution systems addition to special-use facilities of Military Airbases such as maintenance hangers, warehouses, water and sewage distribution systems, water pump house, sewage treatment plants (STP), lifting stations, fuel station, control tower, offices, sleeping and dining officers buildings and gas turbine power generators.

1- Analyzes plans and specifications for construction feasibility of mechanical phases and adequacy of installations and equipment.
2- Confers with Area, Resident and contractor personnel to coordinate mechanical engineering work.
3- Review Contractors plans such as, Accident Prevention Plan, Activity Hazard Analysis, Project Baseline, Area Use Plan, Demolishing and Upgrading Facility plan, Resident Management System Plan, Quality Control Plan.
4- Answering request of information issued by contractor, review submittal, shop drawings, technical data and samples of mechanical materials and equipment submitted by contractors.
5- Participate in contract change control plan through writing down basic change document (BCD) containing the change scope, estimated time and budget, carrying out the required market research for the independent Government estimate, preparing the pre-negotiation memorandum (POM) and attending the negotiation with Contractor, finally, sending the complete package to Contracting Officer for approval and issuance the change.
6- Participating in the 3- phase inspection process, (Preparatory - Initial - Final) Inspections.
7- Making recommendations on expediting and follow-up project progress.
8- Perform with Contractor QC Dept. QA/ QC joint inspection and Safety inspection.
9- Carrying out investigation tests, design analysis and cost estimates to overcome field problems.
10- Directing and supervising team / sup-contractor during construction phase.
11- Provide detailed inspection assistance in connection with installation of mechanical facilities. and equipment.
12- Review as-built drawings. Drafts correspondence as necessary.
13- Gives training and instruction on safe and efficient means of accomplishing the work to improve the standards of workmanship.
14- Strictly adhering for project quality standard and organization policy.
15- Preparation of daily QA reports on projects daily activates and issuing Safety or QC system. deficiencies as needed.
16- Participating in Contractor monthly evaluation, monthly payment and status report.
17- Attending client follow up meetings.
18- Assuring Environment, health & safety procedures and rules are respected per EM-385-1-1.

Some of The Main Projects Involved With:
1. Construction Division;
• Al Kattamia & Cairo West air base upgrade & construction.
• Abu Hammad air base construction

Project Manager à Veolia Water Systems
  • Egypte - Le Caire
  • janvier 2008 à septembre 2009

Managing water and wastewater treatments plants projects, chlorination systems and oil separation units for industrial application
 Assisting proposal team in cost estimation during bidding phase.
 Developing with other functional Dept. Project management plan which includes schedule and budget baselines, risk assessments, procurement plan and quality plans.
 Negotiate with general contractors and subcontractors to obtain profitable construction contracts Working closely with Procurement and Engineering Dept.
 Monitoring project change control plan procedures during any project phase.
 Preparation of weekly reports on projects highlighting critical issues.
 Attending client and consultant work follow up meetings.
 Managing testing and commissioning activities during commissioning phase.
 Issuing and following with the other Dept. projects payments and monitoring project cash flow

Main Projects:
- Wastewater treatment plant (WWTP) with Multinational Force & Observers - Sinai
- Oil separation tanks for Al Suez for oil processing.
- Dyna Sand filtration and chlorination plant.
- Chlorination plant for aircraft wastewater treatment in Cairo airport.
- Oil separation tanks in Cairo airport.
- Wastewater treatment plant (WWTP) in Sharm El Shiekh with crown plaza hotel.

Project Engineer à SNC-LAVALIN
  • Émirats Arabes Unis - Abu Dhabi
  • janvier 2006 à janvier 2008

- Working as a Field Mechanical Engineer responsible for all mechanical activities HVAC, Plumbing, Fire Protection, compressed air and mainly for the main process for district cooling plants chilled and cooling systems including piping and heavy equipment such as centrifugal chillers, pumps and cooling towers inspection and installation in SNC-LAVALIN UAE.

1- Reporting to the Residence Engineer, supervise of the mechanical aspect of the construction activities by:
2- Supervise the performance of sub-contractors to ensure the respect of work’s standards, specifications, schedule and budget.
3- Supervise and monitor the commissioning of main process and MEP plant utilities.
4- Supervise the specific site works in accordance with the project terms and obligations.
5- Provide all necessary information to ensure that the specific work is executed in accordance with drawings and specifications, including pre-operational testing.
6- Inspection of all works and equipment to ensure they are acceptable prior to calling the QC for final inspection.
7- To plan with the Resident Engineer the daily site needs and deliveries.
8- To monitor and review sub contractor site personnel, progress reports, resources and quantity surveys.
9- To coordinate with other site inspectors to resolve site execution problems.
10- Assuring that the environment, health & safety procedures and rules are respected.
Following and coordinating of the following
1- The installation of Heavy equipments.
2- Piping and process equipments installation, pump, ventilation, chiller, cooling tower, HVAC, fire fighting, Water supply and drainage systems
3- Testing and commissioning of pipes, valves and all rotating equipments in the plant.
4- Maintenance and operation of heavy equipments
5- welding inspection
6- Supervision on people
7- Piping fabrication and installation testing
Some of The Main Projects Involved With:
1- KHLIFA CITY district cooling plant with 22000 T.R cooling capacity.
2- DAR 10 RAHA BEACH cooling plant 50000 T.R cooling capacity
3- Mohammad Bin Zayed City cooling plant 10, 000 T.R cooling capacity.

Project Engineer à MECHANO TECHNICAL SERVICES
  • Émirats Arabes Unis
  • février 2004 à janvier 2006

1- My Job duties are all that concerned with the mechanical construction for central air conditioning and air compressed systems and (L.P.G) central gas system design and installation, maintenance, tendering costing and pricing, study Projects, prepare inquiries

• PROJECTS:
1-AL RAHA beach resort for PRIVATE DEPARTMENT.
2-AL FAHAD tower.
3-Abu Dhabi school.
4-AL ZAABE villa.
5-Maintenance work for L.P.G. system for many building.
6-Changing filling line for ABD EL RAHEEM EL HASHME.
7-PALESTAIN school.
8-Upgrading for cylinder system for 2 villa for SHIHK KHALIFA CIMMUNITY

Project Engineer à ARAB CONTRACTORS - OSMAN AHMAD OSMAN
  • Egypte
  • février 2002 à novembre 2004

( STEEL Workshop engineer for fabrication and site engineer for erection work)
• PROJECTS:
1-CAIRO waste water station in GABAL EL ASFAR.
(with DEGRAMONT company France)
2-Radial gates for canals at DAMANHOR & KAFR EL SHEKH.
(with DENIKOLA company Italy)
3-ASFALT plant.
(with SIM company Italy)
4-Overall works for ASFALT plant (WBAWO)
(drier-vibrator-elevator)

Éducation

Baccalauréat, Mechanical Engineering - Power Section
  • à AIN SHAMS UNIVERSITY
  • juillet 2002

• GRADUTION INFORMATION: University: AIN SHAMS UNIVERSITY. (FACULTY OF ENGINEERING). Certificate: B.Sc Mechanical Engineering (Power Section). General Grade: good "70%", Ranked 15th -Graduation Project: water distillation (good). Year Of Graduation: May 2001.

Specialties & Skills

Inspection
Installation
Commissioning
problem solving
Negotiations
team work
project management
stakeholders management
leadership
construction management

Langues

Arabe
Expert
Anglais
Expert

Adhésions

Project Management Institute
  • Certified Project Management Professional
  • January 2011
Construction Management Association of America (CMAA)
  • Certified Construction Mananger
  • February 2022

Formation et Diplômes

Certified Construction Manager (CCM) (Certificat)
Date de la formation:
February 2022
Risk Management Professional - PMI-RMP (Certificat)
Date de la formation:
March 2013
Valide jusqu'à:
March 2016
Project Management Professional - PMP (Certificat)
Date de la formation:
September 2011
Valide jusqu'à:
September 2015

Loisirs

  • Reading, Sport
    Complete a very tough project completion milestone in fast track project