Civil Engineer
Al ALi Engineering
مجموع سنوات الخبرة :14 years, 2 أشهر
Worked for AL Ali Engineering company in Doha Qatar from 14/10/2014 till now in projects :
1. Salwa Resort site (1/5/2017 till now) : Its Mega Project with Budget of 3.5 Billion QR, Working Hardscape & external works ( Kerbstone, Road Works, Paving, exposed aggregate concrete ), and also responsible for All playing courts (basketball, football, and tennis court).
2. Premeir Inn Hotel As section Engineer(14/10/2014 till 21/2/2016) with following responsibilities :
1. Arrange & follow Post tension slabs with both post tension sub contractor & concrete sub contractor.
2. Arrange with MEP departments in concrete work .
3. Follow finishing work (Block work, gypsum walls, false ceiling, painting & tile works).
3.Al Karana site ( 46 villa, 6 majles, 1 mosque) As project engineer (22/2/2016 till now) with following responsibilities :
4. Arrange all concrete work with all sub contractors ( MEP, formwork & steel work)
5. Following all finishing work & arrange with all sub contractors to avoid any discrepancy & re work .
Worked for Horizon company in Riyadh KSA from 1/12/2012 till 14/10/2014 with responsibilities of :
• Structural Shop drawing & details
• Time schedule
• Quantity surveying
• Site Engineer in project contain 58 Villa for both structural & finishing work .
Worked for Al-Qussie for contracts in Jizan since April, 2010 till 25/11/2012 date as civil engineer in refugee camp project with responsibilities of :
Shop drawing (design and structural detailing).
Site engineer (concrete, steel structure, water proofing \{membrane and PVC\}, block work, plastering, tile work and paint work).
General site finishing work (sub-base, asphalt, interlock tiling, concrete pavement, Holland block).