Mechanical Engineer (Infrastructure)
Alkifah Holding (KCC)
Total years of experience :7 years, 6 Months
• Working on infrastructure works, including duct banks, an underground tunnel, MV and HV cables, storm lines, sanitary and gray networks, potable lines, chilled water lines, firefighting network, evaporation ponds, piles, gas lines, retaining walls, and boundary walls.
• Coordinate with other project stakeholders and contractors, including Honeywell, Saudi Tabreed, SinoHydro, ITC, STC, MOT, SCECO, andCivil Defense, to plan the construction sequence and detect any potential construction clashes with other constructors.
• Coordinate and interface with Sec to issue the permits for work on site.
• Successfully reduced construction costs by 10% through value engineering, cost monitoring, and negotiation with suppliers, without compromising on quality or safety standards.
• Effectively managed and updated construction schedules based on project team input, trade contractor progress, and materials delivery, ensuring timely completion of the project.
• Utilized 3D infrastructure modeling to detect any potential clashes among different types of utilities and developed a responsibility matrix with other stakeholders in the early stages to avoid delays in the construction progress due to lack of information.
• Tracke opened interface activities with other contractors and updated the interface breakdown sheet every week, ensuring smooth communication and coordination among all parties involved.
• Order construction materials and rental equipment necessary to execute the work, ensuring timely delivery and availability of resources.
Misco Holdings, Al-Dammam
Client: Saudi Tabreed
EPC Contract: SNC Lavalin
Project Budget: 40M SAR
Responsible for installing mechanical and electrical systems (MEP)
Responsible for installing piping systems (child water and cooling water
system )
Planned and managed engineering projects and continuous improvement
programs to reduce labor and costs.
Reviewed progress controls for project quality assurance, health, and
safety.
Evaluated change order requests in response to out-of-scope work
activities and developing field conditions.
Responsible for installation of Chillers, Pumps, and Heat exchangers.
Erection of cooling towers from the beginning to the end.
Responsible for installing underground network piping systems.
Client: Saudi Aramco
Consultant: Turner Arabia
Project Budget: 300M USD
Responsible for installation of Mechanical Pipes (GRP, FRP, RTR,
HDPE UPVC, PVC, and CPVC).
Responsible for installation of Manholes and Catch Basins.
Responsible for Mechanical Clearance, Conducting Hydro and
Pneumatic tests for the project.
Ensure work is carried out in accordance with relevant Codes,
Standards, and Procedures.
Reviewing (underground drawing, above ground, Piping and
instrumentation diagram) for the storm, potable water, irrigation
the system, lift station, and pump station.
Responsible for line checking after the hydro test to complete the
post punch list prior to sign-off of the test packages before signing
the completion of piping / mechanical work.
Request all pipe and fittings as per ARAMCO piping material
specifications standard.
Identify problems and critical issues and develop resolutions.
Responsible for Mechanical Clearance, Conducting Hydro and
Pneumatic tests for the project
Evolution Engineering Services Co, Al-khobar
Client: Imam Abdulrahman Bin Faisal University (IAU)
Consultant: AFRAS Trading & Contracting Company
Project Budget: 400K SAR
Knowledge in HVAC and chiller systems
Working and Making reports NEBB.
Working to improve HVAC and chiller systems
Managed the daily workload of the technician team Working with the
maintenance Department
Industrial Hard Chrome Heat Treatment Facilities. All kinds of Steel Fabrication for Industrial Projects, Factories, and Buildings. Dynamic Balancing ISO 1940.