مشرف
kharafinational
Total years of experience :33 years, 0 Months
From Jun, 2003 To October, 2005 Dodsall
Name of project: (Damietta LNG Construction LLC)
Job Title: Forman piping.
Job Tasks: 1) Fabrication of big pipes (stain less steel)
2) Fabrication of big pipes (carbon steel)
3) Construction of all pipes (big and small pipes carbon and stain less steel) in the location.
Note: Having commissioning badge no. 01598 from Dodsall.
From June 2011 Until now In (KHARAFI NATIONAL
Name of project: (habshan 5.) IN UAE
Job Title: Supervisor (Piping & Hydro test & pre-comm.)
Job Tasks: 1) Finishing hydro test & pre-comm. For our project.
2) Construction of large and small bore with different levels.
3) Making connection lines of equipments ( static & dynamics)
From April 2007 May 2010 In (CCC international company)
Name of project: (Kharasania Plant) in Saudi Arabia (ARAMCO COMPANY)
Job Title: Supervisor (Piping & Hydro test & pre-comm.)
Job Tasks: 4) Finishing hydro test & pre-comm. For our project.
5) Construction of large and small bore with different levels.
6) Making connection lines of equipments ( static & dynamics)
7) Construction lines of fir fitting and lines services.
From August, 2006 To March 2007 In (company of uorya) in talpha (Mansoura-Egypt)
Name of project: (Factory of Talkha Yoria)
Job Title: Supervisor piping.
Job Tasks: 1) Finishing hydro test & pre-comm. For our project.
2) Fabrication and Construction lines for reactor of yoria.
3) Fabrication and Construction of steam tracing.
From April, 2006 To August, 2006 TECNICAS REUNIDAS GULF (T.R.G) ARAMCO YANBU SAUDI.
Name of project: ( DHT Complex Project at Yanbu Refinery)
Job Title: Supervisor piping.
Job Tasks: 1) Constructing lines steam tracing.
2) Constructing lines of oil.
3) Constructing lines of fire fitting.
4) Construction lines of compressors and pumps.
From October, 2005 To April, 2006 (DSD) FORMETALKO
Name of project: (Talkha Power Station)
Job Title: Forman piping.
Job Tasks: 1) Fabrication and Construction lines of hydraulic systems.
2) Fabrication and Construction pipes of hydraulic systems.
3) Construction of lines (pass ducts)
From Jan, 2001 To Jul, 2002 Shemi Mentobi
Name of project: (Elayen Elsokna Swiss Power Station)
Job Title: Forman piping.
Job Tasks: 1) Construction of lines of feed waters.
2) Construction the (p9) lines between boiler and turbine.
3) Construction piping system of oil cycle.
4) Fabrication and Construction lines of chemical washing.
From, October, 2000 To Jan, 2001 Italian Engelan
Name of project: (Flat Glasses Factory)
Job Title: Forman piping.
Job Tasks: 1) Construction of nitrogen lines.
2) Construction of hydrogen lines.
3) Construction of fire fitting lines (carbon and glphanice steel)
From June, 2000 To October, 2000 Petro-Jet
Name of project: (Gas Station of Rashid)
Job Title: Forman piping.
Job Tasks:
1) Fabrication and Construction (slack capture)
2) Construction reception lines from fields of oil.
From Jan, 1999 To May, 2000 Samsung
Name of project: (Sidi Kerir Petrochemical Company)
Job Title: Forman piping.
Job Tasks: 1) Connection pipes of nitrogen unite.
2) Connection lines of pipe-rake.
3) Connection lines of fire fitting.
From Jan, 1998 To Jan, 1999 Petrojet
Name of project: (Petrochemical Assembler -Alexandria)
Job Title: Forman piping.
Job Tasks: 1) connection pipes of nitrogen unite
2) Connection lines of pipe-rake.
3) Connection lines of fire fitting.
From Jan, 1997 To Jan, 1998 Petrojet
Name of project: (Gas Station El-obaid - Matrouh)
Job Title: Forman piping.
Job Tasks: 1) Connection straight lines in desert.
2) Connection the straight lines to the station.
From Jul, 1995 To Jan, 1997 Kahromika
Name of project: (Sugar Factory of Hamool)
Job Title: pipe fabricator.
Job Tasks: 1) Fabrication and Construction lines of boilers.
2) Fabrication and Construction lines in turbine.
From September, 1993 To May, 1995 Skodaexport
Name of project: (Talpha Power Station)
Job Title: pipe fabricator.
Job Tasks: 1) Connection lines in turbine.
2) Connection lines in boiler.
From Jul, 1991 To July, 1993 Kahromika
Name of project: (Sugar Factory of Belkas)
Job Title: pipe fabricator.
Job Tasks: 1) Connection lines of boilers.
2) Connection lines in turbine.
حصلت على درجات عاليه فى مجال البراده