Reliability Engineer
Saudi Aramco Shell Refining - Sasref
Total years of experience :12 years, 1 Months
Lead Reliability Engineer
Reliability Engineer in Ibn Zahr, one of Sabic affiliates, overviewing reliability KPIs qnd performance, carry deep data analysis and provide solutions and measures and sustain or improve reliability performance
Coordinator of Safet Management System and Operational Excellence coordinator. Ensure proper and adequate implementation of both programs are aligned with Shaybah NGL facility is aligned with its vision, mission and business plan and monitor performane, ensure continuous improvement measures are in place to identify gaps and develop plan to bridge the gaps.
assigned as Turn Around leader for first initial turn around for newly commissioned NGL plant
Worked as Reliability Engineer on Inlet & Gas Treat Area & Gas Compression Area.
Responsibilities:
1. Participating on establishing Reliability Unit to be complying with the company best practices including PM task list to be accordingly with the manufacturers' manuals, and utilizing PMO 2000 to optimize those PM task lists, develop monthly report sample and assigned as the Reliable Operation Committee (ROC) Secretary.
2. Lead the implementation of FRACAS in Shaybah NGL which included delivering educational presentations for Operation, Maintenance and Engineering.
3. Lead the Commissioning of Shaybah NGL Recovery Plant Department Compression Area which included seventeen gas compressors. The commissioning included: commissioning Lube Oil Systems, Seal Gas Systems, and main Compressor Skids and started the system successfully.
4. Commission Inlet & Gas Treat Area equipment which included, Circulation Pumps, Flare Knock-Out Drums Pumps, Hot Oil Circulation Pumps and perform Site Acceptance Test (SAT) for newly Commissioned Pumps.
Deployed as Project Engineer with Project Management Team
Responsibilities:
1. Lead Pre-Commissioning activities which included rotating equipment
Final Alignment, Energization, Lube Oil Flushing & Motors Solo-Run.
2. Assigned as a champion to close PMCC in Gas Compressors which
included, organizing the walk-through and closing all “Yes” punch items
and coordinating with all concerned parties and signing the final
certificate.
Acted as an Area Reliability Engineer on Utilities Plant & Gas Turbines
Starting Package (Power Plant).
Responsibilities:
1. Monitoring the plant rotating equipment which includes Boiler Feed
Water Pumps, Air Compressors, Cooling Water Pumps and Boilers'
Blowers and fin-fans. Attend machines' failure and trips for
investigation and develop scope of work of repairing.
2. Review and modify the PM task list of existing equipment to be
accordingly with the manufacturer recommendations and manuals.
3. Review the vibrations & temperatures trends of On-Line protected
equipment on a daily basis and follow-up with vibrations technicians for
any deficiencies and the cause of vibrations as a part of PdM Program
and participate on preparing the reliability monthly report.
4. Assigned as QA on Power Generation Gas Turbine's Starting Package
Overhaul, Develop Scope of work for all equipment and needed spare
parts, insure all of activities to be implemented accordingly and
develop a post report.
Supervise the operation and maintenance of buildings and sites, insure all of the work to be done in terms of safety, give permission for the work of contractors in the operated in areas.