Total Years of Experience: 16 Years, 11 Months
October 2013
To Present
Transmission Engineer
at HATIF LIBYA Company
Location :
Libya - Tripoli
operation and maintenance
February 2012
To October 2013
Planning And Design For Fiber Optic Network
at Aljeel Aljadeed For Technology
Location :
Libya - Tripoli
Employer: Aljeel Aljadeed For Technology
Position1: Monitoring For Transmission System Engineer.
Position2: Planning And Design For Fiber Optic Network
Position3: fiber optic Engineer.
Date of Employment: Feb. 2011
Project: Aljeel Aljadeed For Technology
Duties and Responsibilities:
fiber optic Engineer.
(NGN) Next-Generation Network Access
(TBN) Tripoli Business Network.
Monitoring For Transmission System .
CCNA1 Network Fundamentals. 6weeks
CCNA2. Routing Protocols and Concepts 6 weeks .
CCNA3. LAN Switching and Wireless 6 weeks
CCNA4 Accessing the WAN 6 weeks
Planning And Design For Fiber Optic Network
Autocad 2D+3D
Position1: Monitoring For Transmission System Engineer.
Position2: Planning And Design For Fiber Optic Network
Position3: fiber optic Engineer.
Date of Employment: Feb. 2011
Project: Aljeel Aljadeed For Technology
Duties and Responsibilities:
fiber optic Engineer.
(NGN) Next-Generation Network Access
(TBN) Tripoli Business Network.
Monitoring For Transmission System .
CCNA1 Network Fundamentals. 6weeks
CCNA2. Routing Protocols and Concepts 6 weeks .
CCNA3. LAN Switching and Wireless 6 weeks
CCNA4 Accessing the WAN 6 weeks
Planning And Design For Fiber Optic Network
Autocad 2D+3D
May 2009
To February 2012
SCADA Engineer
at Al-Nahr Company ANC
Location :
Libya - Misrata
Employer: Al-Nahr Company (ANC)
Position: SCADA Engineer
Date of Employment: Jan. 2009 - 2011
Project: The Great Man-Made River Project of Libya
Al-Gardabiya/Assdada Link - Phase III
Duties and Responsibilities:
Process Control System.
Fiber Optic Communication System and Instrumentation.
Management Control System.
SCADA Engineer.
Position: SCADA Engineer
Date of Employment: Jan. 2009 - 2011
Project: The Great Man-Made River Project of Libya
Al-Gardabiya/Assdada Link - Phase III
Duties and Responsibilities:
Process Control System.
Fiber Optic Communication System and Instrumentation.
Management Control System.
SCADA Engineer.
March 2008
To April 2009
Supervisor Engineer.
at GMRA Great Man_Made River Authority
Location :
Libya - Tripoli
Employer: (GMRA ) Great Man_Made River Authority ((Training with VINCI))
Position: Supervisor Engineer.
Date of Employment: Feb. 2008
Duties and Responsibilities:
Pipeline Simulation System, Coyne et Beellier - Sirt, 2007.
Nokia Siemens Network Herentals (OTN)- Belgium, 2008.
eSD Alcatel University (PABX), Colombes-France 2008.
Siemens-Centre de Formation Industrie (PCS-7). Paris - France, 2008.
Uninterruptible power supply (UPS), Ineo E&S/Coris-Sirt, 2008.
Theoretical & Parctical on AGAS Fiber Optic System, Ineo E&S/Coris-Sirt , 2008.
SCADA Actemium-Sirt, 2008.
eSD Alcatel University (PABX), Ineo-Sirt 2008.
Insrumentation by Institute of Regulation and Automation ( IRA)
Position: Supervisor Engineer.
Date of Employment: Feb. 2008
Duties and Responsibilities:
Pipeline Simulation System, Coyne et Beellier - Sirt, 2007.
Nokia Siemens Network Herentals (OTN)- Belgium, 2008.
eSD Alcatel University (PABX), Colombes-France 2008.
Siemens-Centre de Formation Industrie (PCS-7). Paris - France, 2008.
Uninterruptible power supply (UPS), Ineo E&S/Coris-Sirt, 2008.
Theoretical & Parctical on AGAS Fiber Optic System, Ineo E&S/Coris-Sirt , 2008.
SCADA Actemium-Sirt, 2008.
eSD Alcatel University (PABX), Ineo-Sirt 2008.
Insrumentation by Institute of Regulation and Automation ( IRA)
April 2007
To March 2008
Communication Engineer
at VINCI Construction-libya
Location :
Libya - Misrata
200Km of fiber optic cable.
Siemens (OTN )network system.
(PABX), .
Shelter with Solar System Power Supply
UPS/Charger 230v, 48&24v Power Supply System.
Optical Splicing with Fujikura 50s
Optical measurement with Acterna MTS800 reflectometer
Curve analysis with fiber cable softwer
Attenuation measurement with power-meters
Siemens (OTN )network system.
(PABX), .
Shelter with Solar System Power Supply
UPS/Charger 230v, 48&24v Power Supply System.
Optical Splicing with Fujikura 50s
Optical measurement with Acterna MTS800 reflectometer
Curve analysis with fiber cable softwer
Attenuation measurement with power-meters
Share on Facebook
Share on Twitter
Share Via Email