أحمد مرسى, I&C Maintenance Engineering

أحمد مرسى

I&C Maintenance Engineering

Dubai Electricity and Water Authority

البلد
الإمارات العربية المتحدة - دبي
التعليم
بكالوريوس, Electronic & Communication Engineering
الخبرات
17 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :17 years, 11 أشهر

I&C Maintenance Engineering في Dubai Electricity and Water Authority
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ يناير 2014

Review I&C Project Work and Commissioning Procedures, Schedules, Method Statements and Project Documentation and Making Appropriate Recommendations During Plant Commissioning Phase for ALSTOM Steam Turbine and its Control
System ALSPA P320 TGC V2+.

• Identify Unforeseen, Foreseen, Repeated Problems and Common Mode Failure (CMF)
Study for the Plant Main and Subsystems Using Troubleshooting Skills and Structured Methodology. Submitting Solution Proposals (Modifications, Equipment Change, etc.), Cost and Plan to the Higher Management Level for Execution Approval.

I&C Commissioning Engineer في Upper Egypt Electricity Production Company (UEEPC)
  • مصر - القاهرة
  • مارس 2009 إلى ديسمبر 2013

Construction and Commissioning for ALSTOM 270 MW Steam Turbines Control System ALSPA P320 TGC V2+ and Steam Turbine’s Auxiliaries as following:

1- ALSTOM (ALSPA P320) Turbine Generator Control System (TGC) V2+ System Setup and Configuration, Interfacing Between the TGC System and the Overall
DCS and Other Control Systems.

2- Hydraulic System for Turbine Control (DEHC). (HP Turbine Combined Main Valves, IP Turbine Combined Valves and LP Stop, Control Valves).

3- Turbine Supervisory Instruments (TSI) Included (Bearing Vibration with Bently Nevada 3500 Module, Speed Measurements, ABS Expansion, Differential Bently Nevada Vibration Monitoring System Setup and Commissioning.

4- Lubrication Oil System and Jacking Oil System.

5- Steam Seal System for the Steam Turbine.

6- Drain System for the Steam Turbine.

7- Condenser Evacuation System (Vacuum System for the Main Condenser).

8- Water Box Evacuation System (Priming Water Box).

9- Circulating Water System including Chlorine Analyzer.

10- HP Bypass System and LP Bypass System.

11- Tube Cleaning System for the Main Condenser.

12- Debris Filter System for the Main Condenser.

Operator Steam Turbine في Upper Egypt Electricity Production Company (UEEPC)
  • مصر - القاهرة
  • يوليو 2006 إلى فبراير 2009

Troubleshooting Corrective Maintenance with ANSALDO 312MW Steam Turbine and All Auxiliaries Systems in the Power Plant: Field Supervision over the Execution and Participate the Preparation of Maintenance Programs.

الخلفية التعليمية

بكالوريوس, Electronic & Communication Engineering
  • في Assuit University Faculty of Engineering
  • يونيو 2005

June 2005 Bachelor of Electronics and Communication Engineering. Faculty of Engineering Electrical Department, Electronics & Communications Section.

Specialties & Skills

Computer Maintenance
System Maintenance
Gas Turbines
Steam Turbines
Computer Maintenance

اللغات

العربية
متمرّس
الانجليزية
متوسط

العضويات

Upper Egypt Electricity Production Company
  • Instruments and control Engineer
  • July 2006
Dubai Electricity and Water Authority
  • I&C Maintenance Engineer
  • January 2014

التدريب و الشهادات

ALSTOM Power System Company GmbH, Mannheim, Germany. (الشهادة)
تاريخ الدورة:
March 2010
صالحة لغاية:
March 2010
ALSTOM Power System Company GmbH, Mannheim, Germany. (الشهادة)
تاريخ الدورة:
January 2009
صالحة لغاية:
June 2011
Alstom Power Automation and Control Company, Massy, France (الشهادة)
تاريخ الدورة:
August 2010
صالحة لغاية:
September 2010
ALSTOM Power System Company Belfort, France. (الشهادة)
تاريخ الدورة:
March 2010
صالحة لغاية:
April 2010