site manager
Intecsa industrial
Total years of experience :20 years, 5 Months
Manage, Supervise and coordinate all oil&gas piping activities ( onshore &offshore )
•Ensure Project execution methodology achieves safe, efficient implementation and use appropriate "best practices" to drive project.
•Coordinate contractor oversight activities during the execution phase of the project.
•Manage, oversee the Construction for different facilities :
•(Turbines -compressors - pumps - separators - stabilizers - tanks and slug catchers) and all interconnecting piping for above facilities.
•Manage, coordinate Inspection and oversee all piping & pipelines installation on Brownfield (on process )
•Manage pipes and pipelines activities on Greenfield (new construction )
•Manage, plan and supervise ( Hot Tapping & Tie Ins )
•Applying different codes and specs. (API - ASME -AWS -and ASTM).
•Manage and coordinate pre commissioning & commissioning with client operation.
Task and Duties:
•Overall management direction for project planning, scheduling, equipment, material and human resources and budget tracking for all segments of construction projects
•Directly supervise multiple superintendents and oversee the performance of the various trades in the construction crews
• Coordinates the review and approval of contractors execution phase procedures,
• (Site mobilization, safety and safety training, QA/QC, site materials management).
• Ensure and participate in quality assurance verification activities and provide required technical input to field non-conformance reports (NCR's).
• Physically verify that facilities are constructed in accordance with the job specification prior to turnover.
• Assist construction superintendent with coordination of project construction activities with operations and maintenance.
• Develop progress and resolve construction technical queries.
• Ensure timely development of commissioning and startup procedures.
•Ensure staff are effectively trained and are aware of client specifications,
and that contractors are in compliance so as to ensure quality of construction and commissioning activities.
• Ensure that all work is carried out in accordance with the scope of the contract and that any variances are fully documented and reported.
• Monitor the execution of the contractor construction schedule and measure progress against construction activities, providing regular reports and updates as required.
• Follow up planning of construction activities and resolve any problems.
• Ensure smooth handover from construction to commissioning, in line with company objectives.
• Manage the technical interfaces with other projects in the area in liaison with client construction manager.
Project: GUPCO/BP REHABILITATION PROJECT
Owner GUPCO/BP OIL&GAS
Contractor: PETROLEUM MARINE SERVICES CO. (PMS)
TASKS & DUTIES
•Manage, develop and support the construction process at both a Project and Corporate level in a safe, structured and cost effective manner.
•Ensure that all Project/Company HSE goals are achieved and where possible exceeded.
•Ensure that all construction personnel at both Project and Corporate level are aware of / implement safe working practices / procedures and are provided with a safe working environment.
•Take an active role with hiring and developing field superintendents and foreman while monitoring performance and is involved with the selection, development and training of junior field supervisory staff
•Implement detailed day to day plans for crew activities in accordance with the project schedule
•Lead the planning of initial project site mobilization and directs others for project closeout
•Coordinate contractor oversight activities during the execution phase of the project.
•Construct different facilities :
•(Turbines -compressor- pumps - separator - stabilizers - tanks and slug catchers) and all interconnecting piping for above facilities.
Contractor: PETROJET
Vendor : EXTERRAN (US Company) - MARALDI (ITALIAN Company)
Duties :
•Manage, oversee all construction activities for liquefied natural gas plant ( LNG )
•Manage, supervise and coordinate all piping activities.
•Manage, oversee the construction activities for different facilities (turbines, expander, separators, slug catchers, and stabilizers - fire water Tanks-propane spheres) and all interconnecting piping for above facilities.
•Inspect and supervise pipeline installation
•Applying different codes and specs. ( API - ASME -AWS -and ASTM )
•Attends and contributes to all required meeting.
•Contributes progress and issues to weekly and monthly project reports.
•Coordinates with Pre-commissioning and Commissioning supervision to ensure completed work is handed over in agreed sequence.
•Monitors subcontractor and vendor performance and contributes to project evaluation of these in project close-out report.
•Performs regular performance reviews and assessment of all subordinates during project. Gives feedback as appropriate.
•Ensuring that the construction areas are constructed to international quality standards and agreed budget, schedule, and construction sequence.
Tasks :
•Manage, oversee all fabrications for the structures and plate work.
•Inspection, quality assurance & expediting.
•Projects Nigeria Cement CO. Obajana.
•Caribbean Cement CO.
•Florida crushed stone project USA.
•Manage and oversee the Inspection in china for holism project equipment and structure.
•Follow up and coordinate all activities.
•Fabrication of the following equipments:
•Preheater cyclone, cooler, kiln hood casing, feed pipe, mill housing, stack, access doors, bucket elevator, conveyor belt, expansion joints.
•Assembly and preassembly of fabricated equipments.
•All steel structures of the buildings and facilities.
Projects: Obajana Cement Company
Egyptian Fertilization Company
Vendor: (UHDE German Company)
Duties:
•Manage, oversee all fabrications for the structures and plate work.
•Follow up and coordinate all mobilization activities.
•Fabrication of the following equipments:
•Preheater cyclone, cooler, kiln hood casing, feed pipe, mill housing, stack, access doors, bucket elevator, conveyor belt, expansion joints, feed tubes and ducts.
•Assembly and preassembly of fabricated equipments.
•All steel structures of the buildings and facilities.
Contractor: PETROJET
Vendor: GE OIL&GAS
Duties:
•Oversee and responsible for the planning, scheduling and resource coordination of the following construction activities:
•Construction of 4 compressor units, 3 phase separator,
•Interconnecting piping (different types of materials) for gas recycle.
•Erection of fourth turbo compression unit for raw gas.
•Erection of gas cooler 2 units.
•Oil cooler.
•Process skid.
•Fuel gas skid.
•Interconnecting piping for all above units.
•Oversee and manage slug catcher Fab; installation & erection 4 fingers diameter 36
Inch and length 93 meter with its headers 45 inch diameter &balance line 4 inch dia.
•Liquid skid and interconnecting piping.
•Third flare &blow down piping.
•Underground piping.
•Erection of separator.
•Early production lines with trap.
•Land portion 26 inch dia. To the trap.
•Applying AGIP specs. and different codes (API- ASME - AWS - ASTM
Schedule the project in logical steps and budget time required to meet deadlines.
•Determine labor requirements and dispatch workers to construction sites.
•Interpret and explain plans and contract terms to administrative staff, workers, and clients, representing the owner or developer.
•Study job specifications to determine appropriate construction methods.
•Select, contract, and oversee workers who complete specific pieces of the project, such as painting or plumbing.
•Requisition supplies and materials to complete construction projects.
•Prepare and submit budget estimates and progress and cost tracking reports.
•Develop and implement quality control programs.
•Take actions to deal with the results of delays, bad weather, or emergencies at construction site.
•Plan, organize, and direct activities concerned with the construction and maintenance of structures, facilities, and systems.
•Investigate damage, accidents, or delays at construction sites, to ensure that proper procedures are being carried out.
Oversee, Follow up & Coordinate Erection The Following:
•Gas piping, above ground piping network.
•Hot Water Piping, Air System and Gas holder.
•Compressor house and interconnecting piping.
•Under Ground Piping Net Work 2000 Tons.
•Steel structure for pipe rack.
•Steel bridges.
•As built drawing.
•Hydraulic test for above mentioned pipes.
Owner : ARAMCO
Projects: Install east west sales gas pipeline project
Increase east west pipelines capacity project
WASIT Gas plant pipelines project
TASKS& DUTIES:
•Ensure that all construction personnel at both Project and Corporate level are aware of / implement safe working practices / procedures and are provided with a safe working environment.
•Manage, develop and support the construction process at both a Project and Corporate level in a safe, structured and cost effective manner.
•Manage, oversee all activities starting from R.O.W. pipe lowering, Tie Ins, hydro test, pre commissioning and commissioning.
•Lead the planning of initial project site mobilization and direct others for project closeout.
•Manage, supervise pipelines installation (Ethan, propane, sales gas).
•Manage Supervise and coordinate all piping activities.
•Manage, supervise drag reducing agent skids inside all pump stations from Abqaiq to Yanbu.
•Manage, oversee upgrade existing surge relieve skids.
•Manage construction for new surge relieve skids-pressure reducing stations at Yanbu crude oil terminal.
PETROJET
Vendor : GE OIL&GAS
TASKS&DUTIES
•Manage, develop and support the construction process at both a Project and Corporate level in a safe, structured and cost effective manner.
•Accountable for the delivery of construction services / personnel across projects / company ensuring high standards are maintained and continuously improved.
•Ensure that all Project/Company HSE goals are achieved and where possible exceeded.
•Ensure that all construction personnel at both Project and Corporate level are aware of / implement safe working practices / procedures and are provided with a safe working environment.
•Deliver a high standard construction capability at both Project and Corporate levels,
•Ensuring a consistent and efficient approach is implemented at all times.
•Implementation of a continuous improvement philosophy across the construction function, delivering best practices at all times.
•Management and support of all construction personnel for the following facilities:
•Power generator 3 units (GE PIGNONE )
•Diesel generator 2 units.
•Turbo compressor for raw gas 4 units ( GE PIGNONE )
•Low temperature separator 6 units(3 PHASE SEPARATOR )
•All interconnecting pipes between new and existing facilities.
•Denise pipe line 32 inch diameter.
•Oversee and coordinate with operation all hot tapping activities ( TDW )
•Oversee all fire fighting systems for the erected facilities.
•Underground pipes for open & closed drain system and skids
•Oversee and manage utility air lines, instruments air lines, utility nitrogen, wash water and utility water lines for all installed facilities and make tie INS. With existing facilities inside the plant.
•Oversee and manage all blow down pipes different diameters and make hot taps with the main header line 26 inch, 32inch & 36 inch.
•Manage and oversee all hydro test pack for all installed pipes.
•Manage and coordinate pr commissioning and commissioning with operation staff.
Make decisions, around construction methods, schedule, quality and safety
•Day to day plans for crew activities in accordance with the project schedule
•Follow up Fab. & erection of the following:
•Steel structure of combustion turbine generator 1700 tons.
•Steel structure of steam turbine generator.
•Steel structure of gantry crane 120 tons.
•Structure of pump house crane 20 tons.
•Steel piles (steel casing) around 1000 Casing.
Project : several projects (power stations, oil & gas)
Duties :
•Supervise a group of engineers, supervisors and foreman during execution phase of the project.
•Day to day site supervision to maintain the progress according to baseline schedule and give feedback.
•Allocate the required manpower.
•Reduce the wastage of material and increase manpower productivity.
•Perform and is involved with the selection, development and training of junior field supervisory staff.
Best regards
Design of water treatment plant “desalination station of sea water “