PROJECT/STRUCTURAL ENGINEER
RELK&P Consulting Office. مكتب رفيق الخورى وشركاه للاستشارات الهندسيه
Total years of experience :11 years, 8 Months
Responsibilities& Duties:
o Handover all activities, Items .
o Attending weekly minutes of meeting (MOM), Prepare meeting comments .
o doing nonconformance report (NCR) & Site Instructions (SI) &site correspondence (SC) .
o Monitoring safety Measures at site (PPE) .
o Monitoring, Approving & Inspecting all structures / Architecture items with Contractors.
o Preparing Variation order (VO)& Revising Project Progress.
o Revising Quantity surveying for all items in the project .
o Revising invoices .
o Designing and redesigning the structural elements.
o Dealing with Suppliers and approved the materials for approving.
o Doing the inspections at site.
o Recovering absents of my partners.
o Monitoring the quality standards for all items at site.
o Following the time schedule plan & Recover any delay.
o Revising shop drawing.
o Directing & Monitoring and controlling daily site activities performance.
o Monitoring compaction, slump test & R.C concrete compressive strength test.
o Hand over process to the end user.
ACHIEVEMENTS: (Done by me)
Backfilling : Backfill 91600 m³
Reinforced concrete : 40000 m³ (shuttering, Steel fixing & Casting )
Block work : Built 150000 m² ( Solid & Insulated)
Plastering : Plastering 800000 m² (Internal& External) walls& ceiling
porceline : Installing 150000 m²
Wood doors : Installing 2016
Paints: Painting 800000 m²
Aluminum windows : Installing 4304 pcs
Ceiling Gypsum Board : Installing 12240 m²
Interlock: Installing 20520 m²
Side walk : Installing 8640 m²
Metal handrail: Installing 6480 L.M
Cat ladders: Installing 144 pcs
Metal doors: Installing 144 pcs
Water tanks: Installing 144 pcs
Septic tanks: Installing 144 pcs
Marble stairs : Installing 6336 L.M
Water & Thermal proofing : Installing 32400 m²
Foam concrete : 50000 m²
Rolling doors : 144 pcs
Sanitary fittings : Installing 1000 pcs Path Tub .
Installing 1000 pcs Water Closet .
Installing 1000 pcs Wash Basin .
Manhols, Gulley traps & Clean out : Installing whole set / Each villa.
TECHNICAL /PROJECT ENGINEER In ADVANCE VISION COMPANY (AVC) in Riyadh, Saudi Arabia, GOODIES HOTEL 4, 000 mtr sq. (5 floors with tow basement) and (Cold store steel project (3, 600mtr sq. (1 floor steel frame). (200million Saudi Riyal)
Responsibilities& Duties:
• Design and detailing construction designs.
• Doing all structural shop drawings.
• Coordinates the resolution of construction problems.
• Following up on all the construction activities in the various sites and ensuring that work is done properly and in a timely manner.
• Considering construction costs, government regulations,
• Potential environmental hazards and other factors in planning stages and risk analysis.
(Roads /interlock / Curbstone /Drainage and water lines /Concrete courts / Stamped concrete pavement / Housing compound 20 Residential Building ( in Building Engineering Company in Egypt Badr Russian University.