Section Head Planning Engineer
Hassan Allam construction
مجموع سنوات الخبرة :40 years, 5 أشهر
Responsibilities and Key Achievements:
• Leading the project team to develop an effective project plan.
• Supporting the project planning team in creating project baseline.
• Creating project periodic tracking reports, and dash boards.
• Analyzing the project performance, highlighting the project area of concern.
• Communicating effectively with project stakeholders to keep project on track.
• Leading the planning team to achieve the department targets.
• Preparing extension of time claims and delay analysis. Projects: New admin capital infrastructure projects:
• Main sewage Pipeline 3400 mm, total length 6.5 KM, 43 Manholes in New capital admin.
• Sewage pipelines with 2500-2250-2000 mm, total length 10 KM, and 144 Manholes.
• Irrigation pipelines 1500 mm, total length 16.5 KM, and valve chambers.
• Row water Pipeline, Intake, Pumping Station, and Water Purification Plant for New Admin Capital Title: Senior Planning from: Jul- 2018- Dec 2021. Responsibilities and Key Achievements:
• Creating and maintaining the project detailed baseline with required resources loading.
• Preparing project reports weekly, Bi-Weekly, dash boards, and monthly report.
• Performing project updates including project KPI, S-curve, and resources histogram.
• Preparing revised and recovery schedules.
• Managing subcontractors, and suppliers micro schedules. Projects:
• New October Water Pipeline 1500-1200-800 mm and Pumping stations.
• Infrastructure Networks for 3500 Acres in new October include.
• Responsibilities and Key Achievements:
• Leading the project team to develop an effective project plan.
• Supporting the project planning team in creating project baseline.
• Creating project periodic tracking reports, and dashboards.
• Analyzing the project performance, highlighting the project area of concern.
• Communicating effectively with project stakeholders to keep project on track.
• Leading the planning team to achieve the department targets.
• Preparing extension of time claims and delay analysis.
• Achieving an effective power BI Dashboard for reporting generated from Primavera P6 directly.
• Projects: New admin capital infrastructure projects:
• Main sewage Pipeline 3400 mm, total length 6.5 KM, 43 Manholes in New Capital Admin.
• Sewage pipelines with 2500-2250-2000 mm, total length 10 KM, and 144 Manholes.
• Irrigation pipelines 1500 mm, total length 16.5 KM, and valve chambers.
• Row water Pipeline, Intake, Pumping Station, and Water Purification Plant for New Admin Capital Title: Senior Planning from: Jul/2018 to Dec/2021.
• Responsibilities and Key Achievements:
• Creating and maintaining the project detailed baseline with required resources loading.
• Preparing project reports weekly, Bi-Weekly, dash boards, and monthly report.
• Performing project updates including project KPI, S-curve, and resources histogram.
• Preparing revised and recovery schedules.
• Managing subcontractors, and suppliers micro schedules.
• Projects:
• New October Water Pipeline 1500-1200-800 mm and Pumping stations.
• Infrastructure Networks for 3500 Acres in new October include.
Responsibilities and Key Achievements:
• Creating and maintaining the projects detailed baseline with required resource loading.
• Preparing project reports weekly, Bi-Weekly, dashboards, and monthly reports.
• Performing project updates including project KPI, S-curve, and resources histogram.
• Preparing revised and recovery schedules.
• Managing subcontractors, and suppliers’ micro schedules.
Projects:
• New October Water Pipeline 1500-1200-800 mm and Pumping stations.
• Infrastructure Networks for 3500 Acres in new October include.
Responsibilities:
• Shop drawings review.
• Steel weight calculations, and quantity surveying.
• Tracking the steel fabrication in the workshop.
• Tracking site erection and construction.
• Liaising with clients on a regular basis.
• Preparing status reports.
Responsibilities and Key Achievements:
• Creating the project’s baseline schedule.
• Managing Project cash flow.
• Responsible for project performance reports and earned values analysis.
Projects:
• Marassi north coast project scope of work townhouses and villas MEP system.
• CFC mall food court extension MEP systems.
• El-Omaid - Military Hotel in new Alamein city MEP systems.
• Swan lacks the north coast Lagoon’s construction.
• Responsibilities and Key Achievements:
• Creating the projects baseline schedule.
• Managing Project cash flow.
• Responsible for project performance reports and earned values analysis.
• Projects:
• Marassi north coast project scope of work town houses and villas MEP system.
• CFC mall food court extension MEP systems.
• El-Omaid - Military Hotel in new Alamein city MEP systems.
• Swan lack the north coast Lagoons construction.
Responsibilities and Key Achievements:
• Creating project baseline including S- S-curve, resources histogram, and cash flow.
• Preparing Project reports and performance analysis.
• schedule updates.
• Coordinating between project sub- contractors.
• Responsibilities and Key Achievements:
• Creating project baseline including S- curve, resources histogram, and cash flow.
• Preparing Project reports, and performance analysis.
• schedule updates.
• Coordinating between project sub- contractors.
Responsibilities:
• Working on the operation of coil tubing, and pumping petroleum service.
• Maintenance planning of the equipment.
• Responsibilities:
• Working on the operation of coil tubing, pumping petroleum service.
• Maintenance planning of the equipment.
• Responsibilities:
• Shop drawings review.
• Steel weight calculations, and quantity surveying.
• Tracking the steel fabrication in the workshop.
• Tracking site erection and construction.
• Liaising with clients on a regular basis.
• Preparing status reports.
Responsibilities:
• Tenders study.
• Pumps and motors selection.
• Preparing technical offers and quotations.
• Responsibilities:
• Tenders study.
• Pumps and motors selection.
• Preparing technical offers and quotations.
A Dual MBA Degree from Cardiff Metropolitan and AAST in Project Management
لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.