Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

ahmed raslan

Mechanical Engineering

OQ

Location:
Oman - Sohar
Education:
Bachelor's degree, mechanical engineering
Experience:
22 years, 9 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  22 Years, 9 Months   

July 2016 To Present

Mechanical Engineering

I found this job using Bayt.com

at OQ
Location : Oman - Sohar
Central Support Service Team Leader
Lead a group of company employees and contractors provide support service to the maintenance such as Heavy lifting - Scaffolding - Civil- Insulation - Shifting - Painting
February 2015 To July 2016

Construction Coordinator

at GE
Location : Egypt - Hurghada
 Direct, manage and lead T/A’s, supervisors, specialists, and sub-contractors during construction and commissioning process.
 Work closely together with the Field Service Team Leader and Field Service Manager.
 Comply and insure that every member of the team complies with all safety policies, practices and procedures.
 Supervise the construction, pre-commissioning, commissioning and startup of Gas turbine LM6000.
 Liaise between the client and the EPC contractor the construction works.
 Follow up the construction, commissioning of the BOP equipment.
 Follow up the construction of the water treatment plant cap. 60m3/h
 Follow up and supervise the construction of raw water, Demi water, and fuel tanks Capacity up to 3000 M3
 Supervise the construction, commissioning, and startup of Gas compressor (Valerus) 4X24mmscfd
 Follow up the fabrication and erection of pipe rack
 Follow up the fabrication of above ground and underground piping
 Coordinate and follow up the turnover documents including NDT, Logs, and nonconformance reports
March 2008 To January 2015

Mechanical Engineer

at GASCO
Location : United Arab Emirates - Ar Ruways
Position: Area Mechanical Engineer (Oct. 2013 - DEC. 2014)
 To ensure that all the plant pipelines, rotating and static equipment
are maintained, improved and/or replaced for optimum plant availability
 To conduct root cause analysis of equipment failures and non-scheduled
shutdowns and recommend problem resolutions.
 To ensure effective utilization of the Maximo system in managing
Maintenance and Breakdown activities.
 To compile/provide input for preparation of division/department Capital, Operating and 5 Years Plan budgets, and monitor/control expenditure.
 To participate in Risk Assessment exercises.
 To enforce the implementation of Gasco Health, Safety and Environment Management System (HSE-MS) and also promote awareness of its use among all division and department personnel.
Position: Commissioning Engineer (Nov. 2012 - Oct. 2013)
 Commissioning engineer for mechanical equipment (rotating and static) for new NGL train-4 construction (CAP. 48000mt/d)
 Lead a group of mechanical technician and supervisor to carry out MC walk downs and raise the punch list.
 Attend final inspection and box up of static equipment such as vessels-tanks-columns-heat exchanger.
 Attend mechanical run test for rotating equipment such as fin fan coolers- FD blowers-pumps-compressors and join reliability team to measure the vibration/temp for NDE/DE for motor and equipment.
 Follow up EPC Contractor’s work activities and interface coordination with the activities of third Parties.
 Coordinate EPC Contractor’s activities with Company Operations.
 Ensure construction work carried out in accordance with company rules, regulations, standards and permit to work procedures.


Position: Central Workshop Engineer (Mar. 2008 - Nov. 2012)
 Mechanical Coordinator for major Maintenance and Project activities including LPG tank refurbishment, sulfur pit refurbishment, jetty refurbishment, loading arms removal and install back after overhauling, Mol. Sieve replacement for C2/C3/C4 treaters, Furnace re-tubing for convection and radiation section, etc
July 2002 To March 2008

Mechanical Engineer

at Belayim Petroleum Company PETROBEL
Location : Egypt
• Belayim Petroleum Company PETROBEL,

* Date of employment: 1-Jul 2002 to 08-Mar 2008.

* Job title: Workshop Engineer

* Job responsibilities:
o Facilitate troubleshooting occurs in rotary equipments such as diesel generator and engines, gas generators, air compressors, gas compressors, all type of pumps, heavy equipments, turbo expanders.
o Study tenders' technical and commercial offers and prepare comparison sheet and issue the relevant memo for approvals.
o Follow up contracts' provisions.
o Support creating new contracts special condition and scope of work.
o Negotiate venders in their commercial offers to gain the maximum discount.
o Prepare tender documents.

o Follow up & supervise the maintenance works for more than 60 offshore structures.
o Follow up the inspection and maintenance rational programs (I.M.R) for the offshore structures.
o Follow up for sea line repairs.
o Follow up boat landing repairs and replacement.
o Follow up riser repair and replacement.
o Prepare tender documents.
o Study tenders' technical and commercial offers and prepare comparison sheet and issue the relevant memo for approvals.
o Follow up and study final reports of I.M.R activities.
o Plant maintenance of in-service equipment such as pipelines, vessels, Tanks, heat exchangers, furnaces, etc
o Pipe fabrication and welding.
o Steel structure fabrication and maintenance.
o Spare parts fabrications and machining for in-service equipment.
o Maintaining, repairing, and testing of all types of valves.
o Off shore maintenance and modification activities for platforms Structures
o Boat landing replacement
o Splash zone coating
o Risers inspection and replacement
o Sea lines repair.
o Excellent reporting for the maintained equipment in the plants.


• International crane factory (ICF),
.

This manufacture firm concerns with the fabrication and maintenance of all kinds of overhead cranes (i.e. gantry cranes, single and double girder cranes) . The fabrication includes welding and erection of the steel structure. The company also provides the full installation of cranes at sites.
June 2001 To June 2002

Workshop Engineer

at CIF
Location : Egypt - Alexandria
* Date of employment: June 2001 to June 2002

* Job title: Workshop Engineer

* Job responsibilities: o Follow up the steel work fabrication of crane structure
o Insure the availability of material in warehouse
o Apply quality control in all production stages of produced cranes
o Support in continues improvement of overhead crane production
o Follow up the latest technologies related to overhead cranes

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
June 2001

Bachelor's degree, mechanical engineering

at Alexandria university faculty of engineering
Location : Egypt - Alexandria
Grade: 74.5 out of 100

Specialties & Skills

COMPRESSORS

CONTRACTS

ENGINEER

FABRICATION

GENERATORS

INSPECTION

MAINTENANCE

OVERHEAD CRANES

PLANT MAINTENANCE

MIG welding

Maintenance Engineering

TIG welding

System Maintenance

Languages

Do you speak more than one language?
For some jobs, fluency in one or more foreign languages is a plus, so add your language skills to get better results.

English

Expert

German

Beginner

Training and Certifications

o Liquid Penetrant Test (PT) level II. ( Certificate )

Issued in: May 2003 Valid Until: - May 2006

o Magnetic Particle Test (MT) level II. ( Certificate )

Issued in: June 2003 Valid Until: - June 2006

Loading
Loading...
Loading...