أحمد سعد, Manger of corrugated pipes and polyolfins compounds sector

أحمد سعد

Manger of corrugated pipes and polyolfins compounds sector

Misr Elhegaz Group

البلد
مصر
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
12 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :12 years, 2 أشهر

Manger of corrugated pipes and polyolfins compounds sector في Misr Elhegaz Group
  • مصر
  • أشغل هذه الوظيفة منذ أكتوبر 2014

Main duties and responsibilities:-
▪Meetings with the customer for handling their product problems.
▪Supervise the processing and implementation of quality.
▪Supervise maintenance activities for machines.
▪Ordering Spare Parts .
▪Studying technical quotations for new machines.
▪Responsible for installation of new machines with their accessories.
▪Responsible for any job with Germans and Italians.
▪Help in the OSH activities.

Maintenance engineer في Misr Elhegaz Group
  • مصر
  • نوفمبر 2012 إلى سبتمبر 2014

Responsible for maintenance of production lines from (Leistritz, Battenfeld, Krauss Maffei, Henschel Zepplin, Drossbach and Weber) companies.

Main duties & responsibilties:-
▪Supervise maintenance plan and malfunctions repair.
▪Repairing pneumatic circuits, hydraulic circuits, gearboxes, pumps, blowers, screw compressors and conveyors, gantry cranes ....... etc.
▪Studying technical quotations for new machines.
▪Order Spare Parts.
▪Responsible for any job with Germans and Italians.

Trainee في The Ministry of Electricity and Energy
  • مصر - القاهرة
  • يوليو 2011 إلى يوليو 2011

Gas turbine:-
-Axial compressor with guided vanes.
-combustion.
-Axial turbine.
-Heat exchange for combined cycle.
-Boilers and feeding pumps.
-Auxiliaries and fire protection system.

Trainee في Trio Akmy Group
  • مصر
  • يوليو 2010 إلى أغسطس 2010

Fire fighting:-
-Pipe line for water
-valves, sprinklers, fire detectors and smoke detectors.
-Co2 protection and FM200 protection.
-Pumps(jockey, electric, diesel pump)installation.

Trainee في Trio Akmy Group
  • مصر
  • يونيو 2009 إلى أكتوبر 2009

HVAC works:-
-Duct construction.
-Pipe line for chilled water.
-Chillers and pumps installation.

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في Faculty of Engineering
  • يوليو 2012

Specialties & Skills

Solidworks
AutoCAD
Solidworks
AutoCAD
Microsoft Office
Fire Fighting
CATIA V5

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الالمانية
متمرّس