مجموع سنوات الخبرة :20 years, 2 أشهر

Project Engineer / Technical Construction support (oil & Gas Site): في Archirodon Construction overseas
  • الإمارات العربية المتحدة - أبو ظبي
  • أشغل هذه الوظيفة منذ فبراير 2017

• Study drawing and prepare MTO & RFQ for material.
• Prepare TQ for Drawings & specification Conflicts.
• Construction of building including excavation, steel fixing, casting, finishing (Turnkey)

Planning and Project Control Engineer (oil & Gas Site):- في Archirodon construction overseas
  • الإمارات العربية المتحدة - أبو ظبي
  • نوفمبر 2015 إلى فبراير 2017

• Preparation of Planning Package (including WBS, schedule, Histogram and S-curve)
• Daily, weekly and monthly report and presentation.
• Schedule Weekly update
• Coordinates between in-house engineering team and Client engineer team.
• Coordinates between specialized supplier (Cathodic protection) and site team
• Attending MS & RA meeting with client and incorporating agreed comments.
• Prepare LOP
• Quantity survey for construction purpose
• Monthly Invoice
• Preparing of claims analysis for Main office planning team.

Project Engineer (oil & Gas Site): في Archirodon Construction overseas
  • الإمارات العربية المتحدة - أبو ظبي
  • أغسطس 2016 إلى فبراير 2017

• Coordinates and respond all communication with Client and Consultant.
• Coordinates material and equipment for site team
• Attend material supplier meeting and inspection with client.
• Preparation of Schedule
• Daily, weekly and monthly report and presentation.
• Schedule Weekly update
• Coordinates between in-house engineering team and Client engineer team.
• Attending MS & RA meeting with client and incorporating agreed comments.
• Quantity survey for construction purpose
• Monthly Invoice
• Punch list and project closing report.

Project Engineer (oil & Gas Site):- في Archirodon Construction Overseas
  • الإمارات العربية المتحدة - أبو ظبي
  • أغسطس 2016 إلى فبراير 2017

• Coordinates and respond all communication with Client and Consultant.
• Coordinates material and equipment for site team
• Attend material supplier meeting and inspection with client.
• Preparation of Schedule
• Daily, weekly and monthly report and presentation.
• Schedule Weekly update
• Coordinates between in-house engineering team and Client engineer team.
• Attending MS & RA meeting with client and incorporating agreed comments.
• Quantity survey for construction purpose
• Monthly Invoice
• Punch list and project closing report.

Planning Engineer (oil & Gas Site):- في Archirodon Construction overseas
  • الإمارات العربية المتحدة - أبو ظبي
  • يناير 2015 إلى فبراير 2017

• Preparation of schedule for new scope of work and link it to original scope
• Preparation of Planning Package
• Daily, weekly and monthly report
• Weekly update of 2 schedule
• Monthly Invoice

Marine Engineer في archirodon
  • الإمارات العربية المتحدة - أبو ظبي
  • مايو 2013 إلى ديسمبر 2014

• Camp construction including preparation of layout, utilities & building, issuing BOQ, site mobilization & construction phases and prepare of internal construction schedule and updating on daily bases.
• Construction of Revetment of length 1KM including armour rock
• Accropode installation works ( approx. 8000 accropode)
• Quay Wall construction works including QW foundation and Installation of pre-cast QW blocks
(2311 Block of weight up to 90 ton) and installation of QW accessories.
• Arrangement of 3 crane barge and supply barges for equipment and material transport
• Sea water intake construction
• Rain Drainage system for island including ditch, manholes and RC pipe with length 7 KM
• Making daily/weekly progress report and drawing for all above mentioned job.

Civil Engineer في combined group contracting (cgc)
  • الكويت - حولي
  • مارس 2011 إلى مايو 2013

CGC is a main contractor and our work is plan, organize and supervise the below mentioned work for a trough:-
• Excavation of trough to Pile Platform Level.
• Piling works.
• Base Slab excavation, carpenter, steel works and casting.
• Wall form works (Peri system), steel works and casting.
• Bridges work above the trough.

Site Engineer في archirodon
  • الإمارات العربية المتحدة - أبو ظبي
  • يونيو 2007 إلى ديسمبر 2010

Project 1: Sheikh Zayed Bridge
A) Civil Site Engineer:-
• Supervising in house & subcontractor teams and handover to QC and Consultant.
• Steel Reinforcement site engineer for cross girder and box section deck.
• Concrete Repair and finishing works (Tiles, Paint, Aluminum Guard rail & pole pile foundations etc.).
• Bridge Bearing Installation and grouting.
• Gantry Sign installations including piling

Project 2: Khalifa Port and Industrial Zone (KPIZ) Project
B) Technical Office and Planning Engineer
• Primavera Updates and scheduling.
• Preparing daily, weekly and monthly reports.
• Preparing a week ahead tasks tables and Project expected key dates.
• Delay analysis report.
• Revising invoices and Quantities done on site.

C) Civil Site Engineer:- Jan 08 - Nov 09
• Mobilization, infrastructure services and camp construction including preparing layouts, BOQ, supervising subcontractors and in-house teams, prepare primavera schedule and progress reports (Camp capacity 2500 person).
• Fire fighting works in above mention camp including preparing shop drawing, discussing with governmental concerning departments for approvals, preparing contract package and comparison statement for subcontractor, supervising construction phase and the handover to consultant and governmental authorities .
• Sewage Treatment Plant Construction (800 m3 + 600 m3 capacity)
• 11 KV cable laying with length 1.5 km including construction of transformer room
• Bridge Electric work and light system.
• Bridge finishes work.

GSM Engineer في ericsson
  • مصر - القاهرة
  • يوليو 2006 إلى فبراير 2007

Etisalat Mobile network launching

A) GSM Site Engineer:-
• Construction of 25 rooftop, 11 Greenfield & 1 hub site from excavation till handing over to RFI team

Site Engineer في GNCRB General Nile company for roads and bridges
  • مصر - القاهرة
  • نوفمبر 2004 إلى يوليو 2006

Project: Wali Bridg
A) Civil Site Engineer:-
• Piles and Foundations construction.
• Columns and Frames construction.
• pre-stressed girders installation
• Deck slabs construction.
• Time schedule, update, and liaison with the consultant.
• Technical office in site, monthy reports & issuing monthly invoices.

Design Engineer في NECB (Nile Engineering Concultant Beareau)
  • مصر - القاهرة
  • ديسمبر 2003 إلى نوفمبر 2004

A) Civil Design Engineer:-
• Modeling of structure building on SAP2000, Design and issuing CAD drawing

الخلفية التعليمية

بكالوريوس, Civil Engineer
  • في Ain Shams Univeristy
  • يونيو 2004

Bacherlor's degree in Civil Engineer from Ain Shams University Diploma in project management from AUC

Specialties & Skills

Microsoft Office
Primavera
Primavera P3
Autocad
Microsoft Office
SAP Designing software
Microsoft Project

اللغات

الانجليزية
متوسط
العربية
متمرّس
الفرنسية
مبتدئ

العضويات

Egyptian syndicate for Engineers
  • Member
  • May 2004
Kuwait Society of Engineers
  • Member
  • September 2011