Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Ahmed Fathy, Electrical manager

Ahmed Fathy

Electrical manager·ECOBAT

Egypt

Bachelor's degree, Electrical power and machine

Work experience

Total years of experience: 23 years, 8 months

Electrical manager

January 2016 - Present

ECOBAT

Cairo, Egypt

January 2016 - Present

Scope of work:

The electrical scope of work in the 2 production lines (gypsum board and powder) was done in-house without any outsourcing contractors, so my job description is divided in 2 parts as the following

1- Construction scope

 Responsible and managing the electrical staff for issuing the basic and detail design and prepare the technical specs and technical evaluation for the suppliers. For all the electrical materials such as MV switchgears, transformers, LV switchgears, UPS, cables, automation system, cable tray and conduits and lighting fixtures
 Responsible and managing the electrical staff for the construction work of the following
• MV cable underground cable installation (72 KM of MV cables) under supervision of EETC
• MV switchgear installation and commissioning supervision with switchgear supplier
• Distribution transformers installation and commissioning
• LV switchgear installation and commissioning
• Installation of cable trays and cable pulling (70 KM of power, instrumentation and control cables)
• PLC interface and signal test and supervise the programming issue with the automation system supplier
• Installation and commissioning of lighting system
• Perform the cold run test and sequence test for the 2 lines equipment

Company industry:
Construction & Building
Job role:
Engineering

Senior electrical engineer

July 2014 - January 2016

Reliance Heavy industries RHI

Cairo, Egypt

July 2014 - January 2016

Scope of work:

 Tender Documents Preparation, Invitation and instructions to bidders, Setting the criteria and procedures for evaluation of suppliers and contractors
 Tenders evaluation and negotiations including detailed analysis of bids received, guarantee and performance testing conditions evaluation, study of vendors and sub-vendors and sub-contractor's list to ensure quality of deliverables.
 Projects technical specification preparation
 Electrical design review for basic and details engineering for all electrical and instrumentations items such as single line diagram, power demand calculation, consumer list, sensor list, cable list, instruments flow sheet, earthing and lightning calculations, electrical panels details engineering, …..etc.
 Purchase documents review for all electrical equipment such as cables, motors, switchgears, variable frequency drives, transformers, diesel generators, …etc.
 Factor Acceptance Test (FAT) for MV switchgears, LV switchgears, Power and distribution transformers, MV motors and VFD panels with different suppliers (ABB China, Siemens China, Schnider China and Siemens Germany)
 Site supervision for all electrical installation activities such as cable tray, cable pulling, switchgears, transformers…etc.
 Prepare the commissioning schedule and follow up the commissioning activities
 Prepare the site activities progress report and revise the contractor invoices according to the work progress.

Clients and projects

 El Arish Cement Factory (GOE) line 3&4
 Wadi El Nile Cement Factory new coal mill
 Sinai Cement Factory new coal mills
 South Valley cement Factory new coal mill
 Helwan new coal mill

Company industry:
Business Consultancy Services
Job role:
Electrical Engineering

Lead Electrical commissioning engineer

January 2013 - July 2014

Orascom construction and industries

Iraq

January 2013 - July 2014

From Jan 2013 till Now
Company: Orascom construction and industries In Iraq (OCI)
Job title: Lead Electrical commissioning engineer
Project: Baiji Power plant (6x160MW) Iraq

Scope of work:
➢ Assist the construction manager in meeting project requirements and perform all the technical duties in efficient manner
➢ Ensure that all systems are completed and handed over softly in the planned time
➢ Management responsibility for the commissioning engineers and technicians
➢ Provide and agree all the commissioning deliverables
➢ Ensure safe execution of all commissioning scope
➢ Prepare all the test equipment required
➢ Prepare the commissioning procedures
➢ Liaison and manage vendors and associated interface
➢ Prepare the electrical commissioning plan for the plant
➢ Prepare the daily report to the site commissioning manager
➢ Prepare the turn over package to the client
➢ Testing and start-up for the main and auxiliary transformer

Company industry:
Construction & Building
Job role:
Engineering

Senior Electrical commissioning engineer

January 2010 - December 2012

Orascom construction and industries

Oran, Algeria

January 2010 - December 2012

From January 2010 till December 2012
Company: Orascom construction and industries (OCI)
Job title: Senior Electrical commissioning engineer
Project: Sorfert fertilizer complex ammonia/urea (Algeria)

Scope of work:
➢ Coordinate and follow up with the construction team to finalize the installation activities and handed over to the commissioning for all plant systems
➢ Testing of all type of cables LV, MV, HV and control cables
➢ Testing and start-up of power and distribution transformer up to 30KVA
➢ Testing and start-up of the switchgear (LV-MV)
➢ Coordination between GIS specialist and construction team
➢ Testing and start-up variable frequency drives
➢ Testing and commissioning for light current system siren, intercom and telephone system for the plant
➢ Perform Signal test and loop check for all the consumers and instruments
➢ Testing and start-up of the UPS system
➢ Prepare the turn over package to the client

Company industry:
Construction & Building
Job role:
Engineering

Senior Electrical inspection engineer

May 2007 - January 2010

Bureau Veritas Egypt

Cairo, Egypt

May 2007 - January 2010

Cables (LV, MV cables up to 30KV) inspection FAT test as 3rd party according to IEC60502-2

 Check the electrical resistance of the conductor
 Partial discharge test
 Power frequency test voltage
 Sample test including conductor examination and dimension, hot set test and voltage test and voltage test
 Tan δ test and impulse test

Clients and projects

 Petrofac company (Khalda Gas Plant)
 New Doha airport
 Aramco petroleum company
 Degremont (Elgabal el Asfar)
 Orascom Construction Industries (Sorfert project algeria)
 Saint gobain glass factory



MV Switchgear inspection FAT test as 3rd party according to IEC62271-200

 Visual check for the component according to the design documents
 Di-electric test on auxiliary and control voltage
 Power frequency withstand voltage test
 Mechanical operation test by verifying the switching devices, interlocking and withdrawable parts 5 times
 Contact resistance test for CB
 Perform CT and VT testing
 Function test for switchgear according to the wiring diagram

Clients and projects

 Odebrecht company (Doraleh container terminal project)
 Orascom Construction Industries (Sorfert project Algeria)
 Degremont (Elgabal el Asfar project)


HV air Circuit breaker inspection FAT test as 3rd party

 Visual check for the component according to the design documents
 Five times closing and tripping at rated, 110% and 85% of rated voltage
 Check close and tripping time
 Contact resistance measuring
 Check SF6 gas pressure values at normal, alarm and trip functions
 Power frequency test

Clients and projects

 Iberdrola company (Kuraymat project)


Electrical installation, start up and commissioning as 3rd party

 Check the installation and testing of the all electrical systems

Clients and projects

 Bell Egypt factory
 IBIS hotel (Muscat, Oman)
 Movinpic Jeddah (Saudi Arabia)
 SEEI Company : ( El Zeina Factory at 10th of Ramadan)
 Schlumberger (Western Geco facility )
 Cepsa petroleum company (Administration building)
 Coca-Cola company (Administration building)
 Multinational force &observers camps sinai (MFO)
 Palm hills project (6th of October)

Company industry:
Business Consultancy Services
Job role:
Engineering

Electrical inspection engineer

May 2007 - January 2010

Bureau Veritas Egypt (BV Egypt)

Cairo, Egypt

May 2007 - January 2010

Scope of work:

Cables (LV, MV cables up to 30KV) inspection FAT test as 3rd party according to IEC60502-2

 Check the electrical resistance of the conductor
 Partial discharge test
 Power frequency test voltage
 Sample test including conductor examination and dimension, hot set test and voltage test and voltage test
 Tan δ test and impulse test

Clients and projects

 Petrofac company (Khalda Gas Plant)
 New Doha airport
 Aramco petroleum company
 Degremont (Elgabal el Asfar)
 Orascom Construction Industries (Sorfert project algeria)
 Saint gobain glass factory



MV Switchgear inspection FAT test as 3rd party according to IEC62271-200

 Visual check for the component according to the design documents
 Di-electric test on auxiliary and control voltage
 Power frequency withstand voltage test
 Mechanical operation test by verifying the switching devices, interlocking and withdrawable parts 5 times
 Contact resistance test for CB
 Perform CT and VT testing
 Function test for switchgear according to the wiring diagram

Clients and projects

 Odebrecht company (Doraleh container terminal project)
 Orascom Construction Industries (Sorfert project Algeria)
 Degremont (Elgabal el Asfar project)


HV air Circuit breaker inspection FAT test as 3rd party

 Visual check for the component according to the design documents
 Five times closing and tripping at rated, 110% and 85% of rated voltage
 Check close and tripping time
 Contact resistance measuring
 Check SF6 gas pressure values at normal, alarm and trip functions
 Power frequency test

Clients and projects

 Iberdrola company (Kuraymat project)


Electrical installation, start up and commissioning as 3rd party

 Check the installation and testing of the all electrical systems

Clients and projects

 Bell Egypt factory
 IBIS hotel (Muscat, Oman)
 Movinpic Jeddah (Saudi Arabia)
 SEEI Company : ( El Zeina Factory at 10th of Ramadan)
 Schlumberger (Western Geco facility )
 Cepsa petroleum company (Administration building)
 Coca-Cola company (Administration building)
 Multinational force &observers camps sinai (MFO)
 Palm hills project (6th of October)

Company industry:
General Engineering Consultancy
Job role:
Engineering

Electrical design, start-up & commissioning engineer

October 2002 - May 2007

Asec Automation

Egypt

October 2002 - May 2007

From October 2002 till May 2007
• Company: Asec Automation (ASA)
• Division: Technical department
• Job title: Electrical design, start-up & commissioning engineer

Scope of work:
Low voltage switchgear, marshalling and PLC panels design

➢ Prepare the load list for the low voltage switchgears
➢ Prepare the signal list according to the flow sheet and the interface local panels
➢ Prepare the technical purchasing order for the required material
➢ Preparing the single line diagram and control diagram

FAT (Factory acceptance) test for panels
➢ Visual check for the panel dimension, materials, rating of CB and labels identification.
➢ Perform the DC insulation test for the panels
➢ Function check for the panel according to the wiring diagram
➢ Prepare the as manufacturing documentations

Testing, Commissioning and start up
➢ Testing for (LV, MV) Cables by continuity check, insulation test and HI-POT testing for the MV cables
➢ Performing the signal test and loop check for all consumers, instruments and local panels
➢ Testing the distribution transformers (2500 KVA, 8 MVA & 10 MVA) by performing the visual check, turns ratio, vector group, no load test, winding resistance, Meggering test and function check for all interface signals from the transformer instruments
➢ Testing the LV & MV switchgear by performing Visual check, wiring check, bus bar torqueing, mechanical check for movable parts, check all mechanical interlock, check the interchangeability, check the CT ratio and direction, Check VT ratio and polarity and check the protection relays
➢ Testing (LV, MV) motors by performing insulation check, signal test at test position and cold run for the motors
➢ Testing and start up for LV variable frequency drives and soft starter

Clients and projects
➢ Cement mill 2 upgrading (Lafarge cement factory, Amman, Jordan)
➢ Cement mill upgrading (Lafarge cement factory, rashadeyah, Jordan)
➢ Crusher upgrading (Lafarge cement factory, rashadeyah, Jordan)
➢ New cement silo (Sinai white cement factory)
➢ Russian compressor upgrading (Assuit cement factory)
➢ Cement mill 7 & 8 upgrading (Assuit cement factory)
➢ Water pump station line 1 upgrading (Assuit cement factory)
➢ Kiln increase capacity line 3 (Assuit cement factory)
➢ Line 1 upgrading (Ammreyah cement factory)

Company industry:
General Engineering Consultancy
Job role:
Other

Education

Faculty of engineering helwan university

May 2001

May 2001

Bachelor's degree, Electrical power and machine

Egypt

GPA (percentage): 72%

GPA (percentage): 72%

Skills

Electrical Safety
Expert
Electrical Safety
Expert
Electrical Testing
Expert
Electrical Testing
Expert
Electrical Controls
Expert
Electrical Controls
Expert
Electrical
Expert
Electrical
Expert
AutoCAD
Expert
AutoCAD
Expert
APQP
Expert
APQP
Expert
BUYING/PROCUREMENT
Expert
BUYING/PROCUREMENT
Expert
CLIENTS
Expert
CLIENTS
Expert
ELECTRICAL DESIGN
Intermediate
ELECTRICAL DESIGN
Intermediate
ENGINEER
Expert
ENGINEER
Expert
HI-POT
Expert
HI-POT
Expert
INCREASE
Expert
INCREASE
Expert
KILN
Expert
KILN
Expert
TESTING
TESTING
WIRING
Expert
WIRING
Expert
Electrical Safety
Expert
Electrical Safety
Expert
Electrical Testing
Expert
Electrical Testing
Expert
Electrical Controls
Expert
Electrical Controls
Expert
Electrical
Expert
Electrical
Expert
AutoCAD
Expert
AutoCAD
Expert

Languages

Arabic

Expert

English

Expert