Ahmed Abd El Rehim, Quantity Control Manager

Ahmed Abd El Rehim

Quantity Control Manager

Hassan Allam Construction

البلد
مصر
التعليم
بكالوريوس, Civil Engineering
الخبرات
23 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :23 years, 0 أشهر

Quantity Control Manager في Hassan Allam Construction
  • مصر
  • أشغل هذه الوظيفة منذ سبتمبر 2016
Quality Control Manager في Dar for Trading & Construction (DETAC)
  • مصر - السويس
  • نوفمبر 2015 إلى سبتمبر 2016

Al Sewedy cement factory 2nd phase construction
OK mill
Reject Building foundation and pedestals
Filter building
Stack foundation
Fan foundation
Packing & loading plant
Electric sub-station for cement silos and packing plant
Bucket elevator
Two cement Silos (Slip-form) (post-tension cables)
Clinker Silo (Slip-form) (post-tension cables)
Cement mill feed belt conveyor
Entire project concrete quantity 33, 500 m3 & steel reinforcement 3, 500 Ton.

Project Manager في The Egyptian Company for Contracting & Trading (ECCT)
  • مصر - القاهرة
  • أكتوبر 2013 إلى نوفمبر 2015

Construction of:
1. Disaster recovery room at AICT Dekhala Terminal.
2. Repair paved area at AICT Alexandria Terminal (1500 m2).
3. Orphanage owned by Misr Al Khair and Heliopolies friends at new Cairo third district (building 1200 m2 foot print) and related infra-structure.

Senior Projects Engineer في Amiral Technical Management Services (ATMS)
  • مصر
  • مارس 2010 إلى سبتمبر 2013

Extension of Container terminal North Bulk terminal 64, 120 m2
Construction of 64, 120 m2 rigid pavement.

Extension of Container terminal (Area A) 82, 100 m2
Construction of 82, 100 m2 rigid pavement (10 cm. thickness pre-cast concrete pavers). The scope included excavation 126, 000 m3, filter layer (oversized gravel mixed with sand 0.3 meter thickness), base-coarse (un-bound base 1 meter thickness), Reinforced concrete (Sub-station building, Sanitation building, Leaking pit, foundations for four 45 meter height lighting masts, low voltage manholes, medium voltage manholes, fire-fighting under-ground
hydrants manholes, concrete duct banks, Ø300 mm concrete storm drainage slot-drains, cast-in-situ concrete curbs), four 45 meter height lighting masts, data cables, low voltage cables, medium voltage cables, lighting panels, fire-fighting line with under-ground fire hydrants, four containerized sub-stations, eight reefers racks steel structure, Potable water line, Ø400 mm PVC sewage pipes, Ø500 mm PVC sewage pipes, Ø800 mm R.C sewage pipes, SCADA.

Tasks:
Contract Administration
- Conduct weekly progress meetings with the contractor;
- Manage, review, recommend and execute variation orders (VO);
- Review Interim Payment Certificates / verification of quantities;
- Prepare monthly progress report;

Construction management and Supervision
- Review baseline project planning schedule;
- Review and approve technical submittals per specifications;
- Approval of performed welding, grinding/cleanings, paint systems;
- Perform routine daily site inspections and issue inspection reports;
- Document non conforming work, re-inspect and resolve;
- Review and respond to contractor’s RFI’s;
- Make preliminary and final inspection prior to TOC;
- Conduct final walk through and TO with Client;

Drafts works and As Built Review
- Prepare additional/clarifying CAD drawings where required;
- Review and approve contractor’s submitted as built;

Civil Manager Deputy في Alexandria International Container Terminals (AICT)
  • مصر - الإسكندرية
  • يونيو 2009 إلى مارس 2010

- Quay wall inspection at ALX terminal.
- Quay wall inspection at DKH terminal.
- Barethmatic survey at ALX terminal.
- Barethmatic survey at DKH terminal.
- Repair of container terminal stacking yard at DKH terminal 15, 000 m2.

Senior Projects Engineer في Amiral Technical Management Services (ATMS)
  • مصر
  • يناير 2002 إلى يونيو 2009

1. Earth-works

Asphalt wearing layer at terminals road
Construction of 92, 000 m2 of flexible pavement.

Truck parking area
Construction of 24, 300 m2 of flexible pavement with all involved infra-strucrure.

RO-RO
Construction of 19, 300 m2 of flexible pavement with all involved infra-strucrure.

Extension of the Container Terminal
Construction of 55, 000 m2 of rigid pavement with all involved infra-strucrure.

TCIA (Temporary Custom inspection area)
Construction of 14, 500 m2 with all involved infra-strucrure.

PCIA (Permanent custom inspection area)
Construction of 20, 000 m2 of rigid pavement with all involved infra-strucrure.

Livestock Pavement
Construction of 25, 000 m2 of rigid pavement.

Extension North Container Terminal
Construction of 41, 400 m2 of rigid pavement. The scope included excavation, filter layer, base-coarse (un-bound base 1 meter thickness), concrete (foundations for three 45 meter height lighting masts, Sewage manholes, sewage pump pit, potable-water manholes, IT manholes, low voltage manholes, fire-fighting manholes, concrete duct banks, Ø300 mm concrete storm drainage, pre-cast concrete curbs), three 45 meter height lighting masts, low voltage cables,
lighting panel, PVC sewage line Ø200 length 500 meter, fire-fighting line with under-ground fire hydrants, pre-cast concrete pavers 10 cm thickness.

Dredging and shore protection works for the Liquid terminal
Removal of existing shore protection, removal of existing filter cloth, dry excavation, dredging according to profile (1, 500, 000 m3), Geotextile, pitch-stone and construction of a gravel road.

Infra-structure for the Liquid terminal
All involved infra-strucrure.

2. Steel structures
3. Reinforced concrete structures
4. Pre-fabricated buildings
5. Infra-structure and various utilities
(1)Fire fighting network
(2)Potable water network
(3)Electricity network
(4)Drainage network
(5)Telephone and data cables network

Quality Assurance Engineer في Hamza associates
  • مصر - الإسكندرية
  • أبريل 2001 إلى أكتوبر 2001

1) San-Stefano complex - package TP1 foundation & ground engineering work.

Responsibilities:
- Soil tests relevant to soil inspection.
- Repair of piles and barrettes heads.
- Injection of the diaphragm wall.
- Injection of piles and barrettes.
- Injection of anchors.
- Dewatering system using deep wells and piezometers.
- Water proofing system for raft foundation and sides of diaphragm wall using two layers of
Polyurethane base EPDM membrane (CCW525H& CCW525V, EPDM, Flashing EPDM,
Geotextile and Cartonal).
- Concrete batch plants mixing and casting.
- Concrete batch plant inspection.
- Review all tests and reports.
- Encapsulating of anchors.
- Encapsulating of block out.
- Construction of 2 meter thickness reinforced concrete raft foundation (27, 010 m2).

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Arab Academy For Science and Technology & Maritime Transport
  • يناير 2001

B.Sc in civil engineering

Specialties & Skills

Quality Inspection
Engineering Management
Infrastructure Projects
Construction Management
Construction & Property
AutoCAD
Microsoft Outlook
Microsoft word
Windows
Microsoft Excel
Infra-structure engineer
Construction Management
Engineering Management
Senior Projects engineer
Construction
Inspection
Asphalt
Senior Projects Engineer
Resident Engineer

اللغات

العربية
متمرّس
الانجليزية
متمرّس

التدريب و الشهادات

Mastering Project Management (تدريب)
معهد التدريب:
SETTEC
تاريخ الدورة:
September 2005
Cost Control of Engineering Projects (تدريب)
معهد التدريب:
The American University In Cairo
تاريخ الدورة:
December 2008
Flexible Pavement (تدريب)
معهد التدريب:
Gulf Technical and Safety Training Centre
تاريخ الدورة:
November 2008
Advanced course in AutoCAD (تدريب)
معهد التدريب:
Material Handling Consultants - Netherlands
تاريخ الدورة:
September 2006