Ahmed Gamal El Din Yassin, Senior Materials and Quantity Surveyor Engineer

Ahmed Gamal El Din Yassin

Senior Materials and Quantity Surveyor Engineer

Siemens AG

Location
Egypt - Cairo
Education
Bachelor's degree, mechanical engineering
Experience
12 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :12 years, 8 Months

Senior Materials and Quantity Surveyor Engineer at Siemens AG
  • Egypt - Cairo
  • My current job since May 2016

Bop Piping, Mechanical, HRSG, I & C, Steam turbine and gas turbine material Specialist (inspections and quantity surveyor)
Duties :
• Read site instructions and contract carefully to apply it correctly.
• Apply HSSE instructions for safe and best work.
• Make plan for materials receiving especially for big cargo (Lifting plan).
• Make Inspections for the materials before offloading to be sure from good transportation.
(If any problem takes photos and mention it on delivery note).
• Store materials as its conditions and category (Open air, under shaded area, AC room or Hazardous area).
• Prepare Materials Safety Data Sheet (MSDS) and keep it with hazard materials.
• Make full Inspection for materials according to Qualitative and Quantitative.
(If any Overage, Shortage or Damage prepares OS & D report).
• Use Siemens system (SMT) and android app for entry all data for work.
• Use Excel and its functions for helping me to save data and working time.
• Make materials transfer report and materials issue to site according to priority and requested by site construction team.
• Supervise Partner and sub-contractors work.
• Working for (Electrical, Instrumentations, Mechanical, HSSE, Piping, Steel structures and Commissioning) materials.
• Prepare Special tools and temporary import materials what we need to return back to Germany.
(Repacking and finish export papers)
• Make walk down and audit then prepare report for comments to start for solving.
• Attend daily and weekly meeting with managers.

materials engineer at GS E&C
  • Egypt - Cairo
  • August 2014 to May 2016

• Make planning of loading and unloading materials to save time.
• Make planning and layout for material A-Down and made more free space to receive more materials.
• Make preview for all received material with GAFI.
• Inspection for material by using drawings and certificates.
• Make OSD with attached photos for damaged materials.
• Make material receiving report (MRR).
• Control all sub-contractors like Orascom, Petrojet, ENPPI, Hassan Allam son’s, Siac, and more ………..
• In charge of all work crews and individuals on site.
• In charge of all work crews and individuals on site.
• Monitoring day-to day progress of the work.
• Managing and directs the Site Regulations.
• Programs according to demonstrated needs.
•Ensuring and supervising the given work assignment execution as per schedule
•Control material and make Preparation of materials what construction engineer want to install at site.
• Arrange implementation in site according to agreed time scales.
• Responsible about critical pipe and pipe support materials.
• Make material requisition as priority at site.
• Inspection for material by using drawings and certificates make MTR, MRR.
• Control warehouse and material by using excel sheet and functions (v lookup,
pivot table, If, sum, …) .
• Make planning of material as priority.
• use GTS with GPS for scan pcs barcode

materials engineer & construction engineer at initec energia (MEGA)
  • Egypt
  • June 2013 to August 2014

Duties of Material Engineer (Manager):
• In charge of all work crews and individuals on site.
• Monitoring day-to day progress of the work.
• Managing and directs the Site Regulations.
• Programs according to demonstrated needs.
•Ensuring and supervising the given work assignment execution as per schedule
•Control material and make Preparation of materials what construction engineer want to install at site.
• Arrange implementation in site according to agreed time scales.
•Responsible about module (I, II, III) material (pipe, fitting, instrument, pipe support and steel structure, skids) simple and combined materials large and small.
• Responsible about critical pipe and pipe support materials.
• Make material requisition as priority at site.
• Responsible about contract 112, 118, 109, 106 materials.
• Inspection for material by using drawings and certificates make MTR, MRR.
• Control warehouse and material by using excel sheet and functions (v lookup,
pivot table, If, sum, …) .
• Make planning of material as priority.

Duties of Construction Engineer:
• In charge of all work crews and individuals on site.
• Monitoring day-to day progress of the work.
• Managing and directs the Site Regulations.
• Programs according to demonstrated needs.
•Ensuring and supervising the given work assignment execution as schedule.
• Manage sandblast and work shop.
• Make fabrication of material and install it at site.
•Decrease time of installation and fabrication to increase productivity and money as schedule
• Use drawings and P&I Diagram.
• Make permit of work.
• Close all punch list.

Technical offfice engineer at GE (MEGA)
  • Egypt
  • September 2011 to June 2013

• In charge of all work crews and individuals on site.
• Monitoring day-to day progress of the work.
• Managing and directs the Site Regulations.
• Programs according to demonstrated needs.
•Ensuring and supervising the given work assignment execution as per schedule
•Control material and make Preparation of what construction engineer want to do in site.

Education

Bachelor's degree, mechanical engineering
  • at shoubra engineering faculty
  • May 2011

Specialties & Skills

General Construction
Oil and Gas
Material engineering
Mechanical Engineering
Manufacturing
power point
autocad D
solid works
work under pressure
microsoft office
internet searching

Languages

Arabic
Expert
English
Intermediate
Korean
Beginner
Korean
Beginner

Training and Certifications

training at company (Training)
Training Institute:
cairo petroleum pipe line campany
Date Attended:
August 2010
Duration:
120 hours
AUTO CAD 2D (Certificate)
Date Attended:
January 2012
ICDL (Certificate)
Date Attended:
January 2011
training at company (Training)
Training Institute:
toshiba elaraby
Date Attended:
July 2008
Duration:
120 hours
NDT (RT) from ASNT (Certificate)
Date Attended:
January 2012
training at company (Training)
Training Institute:
petrojet
Date Attended:
August 2010
Duration:
120 hours
training at company (Training)
Training Institute:
cairo oil refining co
Date Attended:
July 2009
Duration:
120 hours

Hobbies

  • الرسم
  • القراءة
  • القرآن الكريم
  • الرياضة
  • الانترنت والكمبيوتر