Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Ahmed Hamed  Askar, Quality Control Manager

Ahmed Hamed Askar

Quality Control Manager·Acc ( Arabian Construction Company )

Egypt

Bachelor's degree, Civil Engineering

Work experience

Total years of experience: 20 years, 5 months

Quality Control Manager

November 2019 - Present

Acc ( Arabian Construction Company )

Cairo, Egypt

November 2019 - Present

Company industry:
Construction & Building
Job role:
Engineering

Quality control manager

August 2014 - October 2019

Shuttering Construction

Cairo, Egypt

August 2014 - October 2019

A quality control manager at Shuttering Construction ( shutteringcontruction.com.eg ) at the project (Avaris residential compound) which is owned by United project management ( UPM ), the project is located in New Cairo, I'm responsible in both civil and architecture works of insuring
the utmost quality of the work done by matching the shop drawing & specifications of the job and completing any missing item needed by the job, passing through the internal infrastructure of each building and the main external infrastructure connecting all buildings, beside that I manage submitting Inspection requests to the consultants and dealing with any sudden situations and call for a meeting if necessary, this position ensured my experience in executing several items and gave me a wide extension to my quality control knowledge .
Recently, and from the 15th of February 2019 i was assigned to be the technical office manager beside my original quality duties, my agreement was based on the fact that the project has come to an end and the remaining works will not distract me from proceeding the technical office obligations.

Company industry:
Construction & Building
Job role:
Quality Control

Project Manager

February 2010 - August 2014

Softec Contracting & Soil Technology

Cairo, Egypt

February 2010 - August 2014

This company was a combination of ordinary construction projects and soil related projects, I started with constructing a five floors building in Misr El gededa for both administrative and residential use, it was going to be a new headquarter for our company, we started with the curtain piles then a 4.5 meters deep excavation followed by a 40cm-thick plain concrete. The foundation consisted of separate pads with various column dimensions.My team consisted of 4 engineers for each division in the project, the whole team including workers and overseers was about 75 workmen. Some other projects I managed was piles, micro-piles, soil-nailing and anchor systems Project accordingly depending on the circumstances of the project, where a deep excavation project needs a deep pile design with a beam and struts, and so for side slops we use a special anchor system and it can be a soft sand excavation that needs soil nailing on the excavation sides. Similarly, a project can involve a leaning building which needs micro-piles to stop the lean.

Company industry:
Construction & Building
Job role:
Management

Senior Quality Control Engineer

January 2006 - February 2010

Nile Engineering & Consulting Bureau

Cairo, Egypt

January 2006 - February 2010

As the office was responsible of part of the project, they needed to control the quality of the work. My duties involved insuring the utmost quality of execution for the inner roads, tarmacs, runways and aircraft parking bays. Work done consisted of stages, where the sub-contractor ( Nile for roads and bridges ) makes a finished stage QC check request. I ensured the correct dimensions and levels of the finished stage took place, and tested random specimen of the sides (if it was concrete) to verify the quality of mixture.

Company industry:
Construction & Building
Job role:
Quality Control

Education

جامعه 6 اكتوبر

July 2004

July 2004

Bachelor's degree, Civil Engineering

Egypt

B.sc. in Civil Engineering, June 2004, October 6 University (Good) • GRE test ( AMIDEAST Cairo) • Geo-technical studies, Soil mechanics & Foundations ( Cairo university) Affiliation & Societies - Member of the Syndicate of Engineering, Egypt. Previous jobs & training - South Dahshour Bridge Project by Arab contractors. ( Site engineer) ( Training) - Wali Bridge Project by Arab Contractors. ( Site engineer) ( Training) - (Academic institution for Heart surgery) Project by Arab Contractors. ( Site engineer)

Skills

AUTO BODY
Beginner
AUTO BODY
Beginner
AUTOCAD
Expert
AUTOCAD
Expert
ENGINEER
Expert
ENGINEER
Expert
EXCEL
Expert
EXCEL
Expert
FINISHING
Beginner
FINISHING
Beginner
MAINTENANCE
Beginner
MAINTENANCE
Beginner
MICROSOFT WORD
Expert
MICROSOFT WORD
Expert
POWERPOINT
Expert
POWERPOINT
Expert
RESTORATION
Beginner
RESTORATION
Beginner
SOIL MECHANICS
Beginner
SOIL MECHANICS
Beginner
هندسه مدنيه و الالكترونيات
Expert
هندسه مدنيه و الالكترونيات
Expert

Languages

Arabic

Beginner

English

Expert

German

Intermediate

Memberships

of the Syndicate of Engineering, Egypt

Member

نقابه المهندسين

29/01711

September 2004

Training and Certifications

Training
Site engineering
Arab contractors
Jan 2003

Hobbies and interests

Computer Programming