احسن فواد, Manager - Project Implementation Department - Transmission

احسن فواد

Manager - Project Implementation Department - Transmission

K-Electric Limited (formerly Karachi Electric Supply Company)

البلد
باكستان - كراتشي
التعليم
بكالوريوس, Electronics Engineering
الخبرات
17 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :17 years, 2 أشهر

Manager - Project Implementation Department - Transmission في K-Electric Limited (formerly Karachi Electric Supply Company)
  • باكستان - كراتشي
  • أشغل هذه الوظيفة منذ يوليو 2013

Reporting to:
Dy. General Manager

Responsible for:
➢ Participate in Kick Off meeting for the Technical and Safety of the project.
➢ Review scope of the contract during bid evaluation process.
➢ Coordinate & participate in handover process from Tendering to Construction, reviewing Construction & Commissioning scope, schedule, including risks and opportunities.
➢ Organize, drive, and participate in the review and approval of the constructability strategy performed during all phases of project execution.
➢ Coordinate with the assigned Site Manager, the Site activities startup and preparation process, ensuring that site execution plan is in place including forecast planning for the upcoming week.
➢ Review and Report Contractor Performance in monthly project review and present status, development, and progress of the project to Management.
➢ Review of project technical documents specifically related to the primary and secondary electrical schemes, fire protection, small power/lighting and HVAC systems for the grid station.
➢ Monitor and report on daily basis the construction execution, cost and man loading forecast and planning.
➢ Develop and implement mitigation plans in conjunction with the Site Manager and Construction team leads.
➢ Evaluate and Prepare response to the Contractor's claims related to variation works, extension of time, etc. in discussion with Business Finance and Legal Affair teams.
➢ Monitor the Project EHS & QMS statistics & coordinate with the Contractor's project team to address & resolve the identified shortcomings.
➢ KPI Planning & progress reporting (internal/external) for ongoing project(s).
➢ Coordination with internal (civil, transmission, telecom, SCADA, etc.) for on-time completion of projects.
➢ Stakeholder management & conflict resolution between stakeholders during project execution.
➢ Development & delivery of training sessions on technical and safety topics.
➢ Improvement of technical provision, specific works datasheets for electrical/fire/etc. related equipment.
➢ Development of Standard Operating Procedures in-line with HSE/technical requirements & best practices.

Executive Engineer (IC SG EA) في Siemens Pakistan Engineering Co. Ltd.
  • باكستان - كراتشي
  • أبريل 2007 إلى يوليو 2013

Working at Siemens Pakistan Engineering Co. Ltd. since the last 5+ years, in the following goups;
- Project Management / Order Management for Control and Protection Projects.
- Design of 500/220/132kV Control and Protection Panels as per NTDC/WAPDA specifications.
- Design of Fault Monitoring System for Shalamar, Loralai Grid Stations.
- Commissioning of 132kV Grid Station's Control and Protection Panel at G-13, Islamabad.
- Part of Siemens AG's RTU team for CCEDDP Package D Project in Colombo Srilanka,
- Design, Parameterization and Commissioning of RTU & Adaptation works in KESC LDC SCADA Project.
- Commissioning of Fault Monitoring and Sequential Recording System at Ludewala 220kV Grid Station.
- Parameterization, installation. testing and commissioning for Siprotec relays and bay control units.
- Installation, testing and commissioning for SICAM RTU Systems.

الخلفية التعليمية

بكالوريوس, Electronics Engineering
  • في Sir Syed University of Engineering and Technology
  • ديسمبر 2006

-Recieved grade based scholarships throughout the course. -Worked on Bomb Disposal Robot for Final Year Project.

Specialties & Skills

Project Management
Project Execution
Fire Safety
MS Word/Exel/Power Point
MS Project
SICAM 230 & Tool Box
SICAM PQS & Analyzer
ELCAD 7.3.2
DIGSI 4.84
AutoCAD 2007

اللغات

الانجليزية
متمرّس
الأوردو
متمرّس
العربية
مبتدئ

العضويات

Pakistan Engineering Council
  • Registered Engineer
  • December 2008

التدريب و الشهادات

Post Graduate Certified PMP (الشهادة)
تاريخ الدورة:
May 2012
صالحة لغاية:
November 2012
SICAM PAS Associate (Course work) (الشهادة)
تاريخ الدورة:
June 2010
صالحة لغاية:
June 2010