Aidos Abdizhalelov, Lead Process Engineer

Aidos Abdizhalelov

Lead Process Engineer

UzLITI Engineering JV LLC

Location
Kazakhstan - Almaty
Education
Master's degree, Urban and Regional Development
Experience
15 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :15 years, 4 Months

Lead Process Engineer at UzLITI Engineering JV LLC
  • Uzbekistan - Tashkent
  • My current job since April 2021

1. Development of detail design documentation such as design basis, heat and mass balance, utility flow diagram, process flow diagram, process datasheet for process equipment, line list, equipment list, fluid list, effluent list, utility summary, P&ID, Cause & Effect Matrix;
2. Working with international standards such as API, ASME, NFPA, UL.
3. Checking and commenting Vendors’ documentation;
4. Filling up input data in instrument datasheets for pressure transmitters/gauges, temperature transmitters/gauges, level indicators, control valves, ESD valves, On-Off Valves;
5. Checking hydraulic calculation;
6. Participation in 3D Model review meetings, HAZOP/SIL sessions.

Project Management Consultant: Chief Process Engineer at Kaz Project Operating LLP
  • Kazakhstan - Almaty
  • March 2019 to July 2020

1. Checking of drawings of process and mechanical part, heating, hot water supply in accordance with Kazakhstani technical norm references as SNiP RK, SN, ST RK, SP RK, MSN and international standards as ASME, MSS SP, ASTM, API 5L, API 6D and detection of mismatches;
2. Piping systems, pressure ratings and applications;
3. Work jointly with civil, mechanical, electrical, instrumentation, SCADA and telecommunication engineers in PMT as well as with staff of design institutes and representatives of manufacturing plants to reveal more detail information in each unique activity.
4. Checking heat and hydraulic calculations, pipe wall thickness calculation.
5. Supporting Planning department with data associated with duration, required resources, and sequence of construction activities;
6. Analysis of plan and actual variance;
7. Calculation of earned value and forecast of project estimate at completion;
8. Calculation of SPI (schedule performance index) and CPI (cost performance index) and making proper recommendation;
9. Checking S-curve, manpower histogram, resource loaded schedules.

Planning & Reporting Chief Specialist at Gazprom Neft Badra B.V.
  • Iraq - Baghdad
  • October 2012 to July 2016

1. Checking, commenting and approval of Construction PMS (Progress Measurement System) and Pre-commissioning, Commissioning and Start-up PMS;
2. Checking, commenting and approval of procedures related to planning and reporting (WBS, PMS, CTR, PTR, TDR, Manpower histogram, Equipment histogram, Equipment List, etc.);
3. Checking the Schedule Level 1-4 (relationships of activities, their logics, appropriate sequence, lag)
4. Checking Contractor’s updated schedule;
5. Analysis and monitoring of schedules;
6. Analysis of labor capacity and equipment output.
7. Analysis of dynamics of construction,
8. Using Earned Value Management System.
9. Developing baseline CPM schedules in accordance with company work procedures, coordinating input from all contractors.
10. Progressing and rescheduling activities in the schedule for review and approval.
11. Highlighting potential risks/opportunities and generating mitigation strategies to ensure project success
12. Resource loading schedules and developing baseline progress curves, as well as Early and Late Date curves, based on EVM principles.
13. Updating actual progress using EVM principles and adhering to established Rules of Credit.
14. Forecasting progress to project completion.
15. Performing variance analysis, and assists with forecasting.
16. Gathering relevant data from every available source, assessing its quality, and applying it to the schedule.
17. Development of mini-schedules for separate project facility/object at site.
18. Planning and conducting both quantitative and qualitative risk analysis sessions.
19. Working closely with and supporting the Cost Control function, and other departments in the company.

Process Engineer at KazStroyService OGCC JSC
  • Kazakhstan - Almaty
  • November 2011 to September 2012

1. Checking of drawings of process part, heating, hot water supply in accordance with technical norm references as SniP RK 3.05-01-2010, SniP RK 3.05-09-2002, ONTP 51-1-85, MSN 4.03-01-2003, MSN 4.02-02-2004 and international standards as ASME B16.9, ASME B16.5, ASME B16.47, ASME B31.3, ASME B31.8, MSS SP-75, MSS SP-97, ASTM, API 5L, API 6D and detection of mismatches;
2. Execution of material requisition;
3. Development of procedures of CS-2, CS-7 and KUMS process pipelines hydrotesting, drying and filling with nitrogen;
4. Flange, Valve, Fitting & Bend selection;
5. Development of procedures of CS-2, CS-7 and KUMS site acceptance tests of equipment (boiler house, heat point and fire extinguishing pump station);
6. Piping systems, pressure ratings and applications;
7. Work jointly with process engineers of design institutes and representatives of manufacturing plants;
8. Stress calculation and buckling analysis of underground pipeline;
9. Calculation of cryogenic nitrogen mass, required for trial run of compressor.

Assistant Manager at KazStroyService OGCC JSC
  • Kazakhstan - Almaty
  • April 2010 to November 2011

1. Checking and tracking of reports from sites;
2. Writing a business letters to the customers, subcontractors and vendors;
3. Accompaniment technical meetings by translation (eng.- rus., rus-eng.);
4. Drawing up of minutes of meeting;
5. Compilation and selection of package of documents for pipe spool hydrotesting performance in Chinarevo AGTU-CGTU and Kozhasai GPU (“As built” drawing execution, entering of number of welding joint and welder mark, distances between joints and supports into isometric drawing with actuality; job cards and test packs handling; check list filling as per isometrics; selection of welding reports, results on dye penetrant examination, X-ray radiography, PWHT, hardness test).

Construction-and-Assembling Operations Manager at KazStroyService OGCC JSC
  • Kazakhstan - Almaty
  • October 2009 to April 2010

1. Object overseeing by various issues (production, juridical, administrative);
2. Participation in commissioning and start-up of multiphase pump stations of “Bornemann pumps” (Obernkirchen, Germany) company at the Nuraly oil field.
3. Work with “Exterran” company (Houston, Texas, USA) during erection, assembly of low pressure and high pressure compressor units at Akshabulak oil-and-gas field.

Civil Works Supervisor at Branch of Caspian Gas Corporation JSC
  • Kazakhstan - Beyneu
  • September 2008 to September 2009

1. Building control (earth, foundation and erection works);
2. Inspection of constructing object;
3. Check-up of general journal of works, concrete works journal, weld history sheet and journal of field supervision;
4. Signing of acts of inaccessible works and acceptance acts for responsible builds, executed in construction;
5. Sending of regulations to contractor organizations in case of infraction of construction rules and procedures;
6. Work with standardized documents SniP RK 1.03-06-2002, SniP RK 1.03-05-2001, SniP RK 2.02-05-2002, Oil and gas industry safety rules and regulations of RK;
7. Static and dynamic test runs of ceiling travelling cranes by PB 10-382-00 “Procedure for Design and Safe Operation of Cargo Cranes“.

Process Engineer at KazStroyService OGCC JSC
  • Kazakhstan - Oral
  • July 2006 to August 2008

1. correction of pipeline linear part;
2. sight and checking of process, construction, external water supply and sewerage drawings on accordance to standardized documents (SniP 2.05.06-85*, SniP 3.05-09-2002, SniP RK 4.01-02-2001, SniP 2.11.03-93, SniP II-89-80*, PUE RK and etc.) and revelation of mistakes;
3. sight of planning sheets on separate sort of work (works order) of subcontractor organizations on accordance to standards;
4. execution of spreadsheets by specifications of grades TH, NVK, OV;
5. drawing of pig launcher DN 300;
6. drawing of «AS BUILT» designs of oil pipeline linear part as per index of coordinates and joints high points and ground above oil pipeline axis elevation;
7. checking of material requisitions (processing facilities, constructional materials);
8. drawing of welding joints isometric schemes (according to process drawings);
9. earth works (earthfill, digging) calculation by layout and actual geodetic survey;
10. work with technical requirements on crossing constructing oil pipeline with different communications (rivers, highways, rail way, aboveground and underground gas pipelines, electric power line, high voltage line, etc.);
11. design of water-conduit wells from reinforced-concrete hollow circles.

Document Control Engineer at Aelita KRIJV JSC
  • Kazakhstan - Balqash
  • November 2005 to July 2006

1. filling of QF quality forms for concreting operations, pipe laying, installation and erection of equipments;
2. drawing of «AS BUILT» designs (elevations of foundations, drain pipe high points and volume capacities; actual distances);
3. work with process and construction drawings;
4. work with project cost control procedure (detailed layout of the contract price: rating of works by detail design, procurement and construction of object);
5. preparation of as-built documentation (measured drawings, schemes from land-surveying);
6. filling of daily report for construction (Daily site log book);
7. materials take off by drawings and specifications;
8. work with surveying instrument.

Education

Master's degree, Urban and Regional Development
  • at Cardiff University
  • April 2018

I graduated from Cardiff University in December 2017 having been awarded Master of Science degree in Urban and Regional Development. My master thesis topic was “Smart Cities through the lens of Social Sustainability”, where I had chosen Birmingham and Bristol in the UK as case studies. Mainly I researched the impact of Smart Cities Initiatives on social acute problems such as fuel poverty, child poverty, housing and social justice. As a primary data I conducted semi-structured interviews, whereas as a secondary data I utilised smart city policies, social policies and statistical data. During writing this dissertation, I got acquainted with social policy, economic policy and importance of finding balance between them, from which nation’s or cities vicious or virtuous circle of development depends on.

Bachelor's degree, Engineering, Construction and Operation of Oil & Gas Pipelines and Oil & Gas Storages
  • at Kazakh National Technical University named after K.I.Satbayev
  • June 2005

Engineering discipline

Specialties & Skills

Project Planning
Project Management
Mechanical Engineering
Process Engineering
ENGINEERING
GRAPHIC DESIGN
LAYOUT DESIGN
MATERIALS MANAGEMENT
MICROSOFT WORKS
PROJECT MANAGEMENT
SPREADSHEETS

Languages

English
Expert
French
Intermediate
Russian
Expert

Training and Certifications

Quantity Surveying Certification by ACAC (Certificate)
Date Attended:
August 2014
Project Management Practice (Certificate)
Date Attended:
June 2019
Valid Until:
June 2019

Hobbies

  • Reading
  • Cycling