Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Ajith  Anandan Nair, Lead Mechanical Engineer

Ajith Anandan Nair

Lead Mechanical Engineer·Petrofac Emirates LLC

United Arab Emirates

Diploma, Mechanical Engineering

Work experience

Total years of experience: 15 years, 0 months

Lead Mechanical Engineer

December 2015 - August 2018

Petrofac Emirates LLC

Abu Dhabi, United Arab Emirates

December 2015 - August 2018

Reviewing, coordinating and monitoring all activities related to the construction, renovation or modification of mechanical installations
Ensuring the mechanical installations’ compliance to the applicable norms and legislations performed by the site contractor;
Controlling, monitoring and reviewing - by means of key performance indicators - the execution of preventive and corrective
Studying mechanical installations and preparing improvement plans including energy reduction proposals;
Responsible for the project construction activities supervision and ensure site execution to be within timeline, quality and safety performance.
Safeguards compliance with ADNOC HSE procedures
Smooth site execution for the assigned projects and construction completion as planned.
Coordinates between various interfaces during site execution.
Ensures that site activities are carried out in full compliance of ADNOC quality requirement
Ensures that site activity progress is reported in timely manner including all issues and areas of concern
Establishes close liaison with Sub contractor for smooth progress and proper utilization of available resources
Assures close follow up of construction progress (safety, schedule, milestones, and quality).
Ensures compliance with the respective project quality plans (PQP)

Review and approval of procedures, Method Statement, and documentation as per client specifications / Projects specification / as per code requirements.
Maintaining preservation log and Monitoring preservation activities of equipment before and after installation.
Conducting preservation walk down with Sub contractor and Client
wise inspection
Reviewing the sub system markup and the test limit of packages.
Coordinating with QC team for the line walk, Punch close out, testing and reinstatement of lines
Coordinating with Vendor representative to complete the carry over works and pre commissioning activities.
Participating in Mechanical completion walk down for piping and equipment as per the sub system mark up
Planning and Monitoring of A-ITR close out in PETRO PCS
coordinating with Flange management team to complete the flange tightening as per Flange management procedure and coordinating with pre-commissioning team to complete sensitive leak test.
Familiar with material like CS, SS, DSS, CRA, Titanium, 825-Alloy, Cu-Ni, GRE, GRP

Company industry:
Oil & Gas
Job role:
Oil and Gas

Mechanical Engineer

July 2012 - October 2015

Larsen & Toubro E l e ctr o m ech L L C

Muscat, Oman

July 2012 - October 2015

Reviewing, coordinating and monitoring all activities related to the construction, renovation or modification of mechanical installations
Ensuring the mechanical installations’ compliance to the applicable norms and legislations performed by the site contractor;
Controlling, monitoring and reviewing - by means of key performance indicators - the execution of preventive and corrective
Studying mechanical installations and preparing improvement plans including energy reduction proposals;
Responsible for the project construction activities supervision and ensure site execution to be within timeline, quality and safety performance.
Safeguards compliance with PDO HSE procedures
Smooth site execution for the assigned projects and construction completion as planned.
Coordinates between various interfaces during site execution.
Ensures that site activities are carried out in full compliance of PDO quality requirement
Ensures that site activity progress is reported in timely manner including all issues and areas of concern
Establishes close liaison with Sub contractor for smooth progress and proper utilization of available resources
Assures close follow up of construction progress (safety, schedule, milestones, and quality).
Ensures compliance with the respective project quality plans (PQP)
Review and approval of procedures, Method Statement, and documentation as per client specifications / Projects specification / as per code requirements.
Maintaining preservation log and Monitoring preservation activities of equipment before and after installation.
Active participation as Q captain for Flawless Project Delivery (FPD)
Conducting preservation walk down with Sub contractor and Client
wise inspection
Reviewing the sub system markup and the test limit of packages.
Coordinating with QC team for the line walk, Punch close out, testing and reinstatement of lines
Coordinating with Vendor representative to complete the carry over works and pre commissioning activities.
Participating in Mechanical completion walk down for piping and equipment as per the sub system mark up
Planning and Monitoring of A-ITR close out in PETRO PCS

Company industry:
Oil & Gas
Job role:
Mechanical Engineering

Mechanical Supervisor

December 2008 - May 2012

AL-HASSAN ENGINEERING CO. SAOG

Muscat, Oman

December 2008 - May 2012

Verification of Foundation Prior to Erection of Equipment.
Verify incoming material in liaison with material controller/store Keeper.
Erection of static and rotating equipment as per the GA drawing and lifting plan
Preparation of preservation matrix and log for static, rotating and packaged equipment and maintaining the preservation as per vendor requirements.
Installation of Air cooled heat exchanger structure, tube bundle, fan blade and pulley
Carry out alignment of air cooled heat exchanger Blade alignment(Blade angle and tip clearance), pulley alignment and belt tensioning.
Carry out alignment activity such as base alignment, pre-alignment, flange parallelism and final alignment of rotating equipment.
Inspection of Structural steel fabrication and erection. Alignment of steel columns and bolt torqueing of structural members.
Installation of Electric Overhead Cranes and Hand Operated Overhead cranes and conducting load test.
Carry out internals installation like schoepentoetor, demister, mist mat, catalysts, mellapack, Chimney Trays, Valve tray BDH trays & Pall Rings, Swirl deck etc and box up of static equipments
Maintaining latest revisions of all reference standards, documents, drawings, and specifications required for installation and inspections.
Coordinating with QC team to complete the inspection activitiesVerify, ensure and update calibration status of inspection test equipment.
Attending construction and MC punch list and coordinating with QC and Commissioning team for the close out

Company industry:
Oil & Gas
Job role:
Engineering

Mechanical Insulator

October 2006 - December 2007

NASSER’S AL-HAJRI CORPORATION

Jubail, Saudi Arabia

October 2006 - December 2007

Verify incoming material inspection in liaison with material controller/store
Keeper.
Verification of Foundation release and Foundation inspection Prior to Erection of Equipment.
Carry out stage wise inspection of static equipment such as erection
Alignment inspection, internal installation, final inspection and box
Preparation of preservation matrix and log for static, rotating and packaged equipment and maintaining the preservation as per vendor requirements
Inspection of Air cooled heat exchangers (tube bundle installation & inspection, fan blade angle & tip clearance, pulley alignment & belt tensioning inspection.
Carry out stage wise inspection activities of rotating equipment such as erection, soft foot verification, pre alignment inspection, Flange parallelism checking and final inspection.
Inspection of Structural steel fabrication and erection. Alignment inspection of steel columns and witnessing bolt torqueing of structural members.
Preparation of punch list with client and submitting final construction dossier.
Installation and alignment inspection of Electric Overhead Cranes and Hand
Operated Overhead cranes.
Witnessing and co coordinating for the load test of EOT crane, Monorail, chain pulley block and travelling trolleys.
Participate in quality audit and take appropriate corrective and preventive actions for closing out the findings.
Maintaining latest revisions of all reference standards, documents, drawings, and specifications required for inspections.
Verify, ensure and update calibration status of inspection test equipment.
Preparation of final dossier for static/Rotating and packages.
Review of Hydro test Packages, line checking and Punch listing. Witnessing
Hydro testing and pneumatic testing.

Company industry:
Oil & Gas
Job role:
Quality Control

Mechanical Inspector

April 2002 - May 2006

NEO STRUCTO CONSTRUCTION LTD

Surat, India

April 2002 - May 2006

Carry out inspection of incoming materials like Plates, Pipes. Fittings etc. and review of corresponding documents for its compliance.
Ensure the valid calibration status of monitoring & measuring devices like
Welding Machines, Baking & Holding ovens, Quivers etc.
Control of welding consumables handling at site as per Company specification, Manufacturer’s recommendations and approved procedure.
Coordinate with site execution team for the day-to-day activities and ensure its compliance against the approved documents / drawings.
Inspection of stage wise fabrication activities and related variables such as Fit-up preparation, Pre-heat / Inter pass temperature, weld parameters, Final weld visual inspection, post heating, PWHT etc. as per approved WPS.
Perform dimensional & alignment inspection for vessels and structure as per approved Drawing and ITP.
Witness of NDT activities such as, PMI, Liquid Penetrant and Magnetic
Particle Testing.
Coordinate with client representative / TPIA and conduct inspections for stage-wise activities.
Facing the Internal & External Quality Audits as Auditee

Company industry:
Mechanical Engineering
Job role:
Quality Control

Education

Technical Education Board

November 2001

November 2001

Diploma, Mechanical Engineering

India

GPA (percentage): 72%

GPA (percentage): 72%

Technical Education Board

November 2001

November 2001

Diploma, Mechanical Engineering

India

GPA (percentage): 72%

GPA (percentage): 72%

Skills

GRE
Expert
GRE
Expert
Structural
Expert
Structural
Expert
Piping
Expert
Piping
Expert
Equipments
Expert
Equipments
Expert
Static /Rotating Equipment and Piping
Expert
Static /Rotating Equipment and Piping
Expert

Languages

English
Expert

Hobbies

  • Reading