Civil and Structural Engineer
Rahal Al Emarate Engineering Consultan
Total years of experience :29 years, 6 Months
Development of Structural design as per architectural or Plant layout. Approval of design from Government authorities and site supervision and preparation of RFI to Government inspectors, to ensure work was done as per design and specification.
Project details:-
•Preparation of as built drawing by laser scan survey (HDS) of expansion work in Refinery for preparation of RFI and obtaining Completion certificate from Hamariah Free Zone authorities for Gulf Petrochem FZC in Hamariah Free zone.
•Preparation of As built drawing for new Tanker filling station on Port and connecting supply lines with Plant after site survey and preparation of RFI for obtaining completion certificate from Government authorities for Sharjah National Lube Oil Co. L.L.C.
•Design of 2 projects G+3 Buildings, 6 projects for G+1 Villas and 5 project for Industrial Shelters of 20 x 60m
Dec’11-Apr17 with ERSAI Caspian Contracting LLC (Saipem), Kazakhstan as Civil Works and Structural Discipline Lead;
Responsibilities-
•Review and approve civil and Steel structural drawings. Issue detailed shop drawing
•Prepare scope of MOC related to Civil and structures.
•Perform site visit of existing plant for relocation/desolation activities, DAR, RFI, MOC.
•Prepare /Reply Technical queries and site queries
•Attend RFI and prepare red mark up drawings /site photos and close out.
•Obtaining permit to work PTW from HSE department
•Coordinate with Operation Team ( Operation advisor/ engineer /Manager
•Update tracking list of DAR/RFI/MOC/Installation/drawings.
•Rerouting of civil foundation /structures if clashes with Piping.
•Raise DCN for major relocation/reroutings.
•Review model by Navis works
•Provide Technical support to management on civil and structural issues.
Project details:-
•108m Extension of Main Fabrication Shelter (132 m x 70 m) with 4 bridge crane of 50 ton and 4 crane 32 ton, for TCO project. Responsible for Civil and Structural design drawing and MTO (2017)
•Agip KCO Kashaghan Project - Pipe Rack Fabrication (Supporting construction for fabrication and clarification on structural issues).
•TCO Gas Future Growth Project - Module Fabrication for Gas Treatment Plant (Supporting construction for fabrication and clarification on structural issues).
•Fabrication Unmanned Well Head Management and Production Module for Kashagan Oil Field Experimental Program Cluster (EPC 2&3) (Supporting Engineering Manager during bidding phase, constructability review and fabrication) involved in MC team and completed Mechanical completion and load out manual. (2016)
•Hull and LQ fabrication Transportation and Lifting analyses and keel block layout of Hull Blocks, followed by Mechanical Completion of Marine system, HVAC System, Services and Life Saving System, Undocking plan for KFELS B Class Jack UP Drilling Rig. For Kaz Munai Gas (First JUDR of Kazakhstan)
Jack Up Drilling Rig (Supporting
Development of Structural design as per architectural or Plant layout. Approval of design from Government authorities and site supervision and preparation of RFI to Government inspectors, to ensure work was done as per design and specification.
Project details:-
•High rise building (2 Basement Parking+G+4P+21 typ.)
•G+3P +12 typ+Pent House
•Hotel Project G+3P+10Typ +Swimming pool and cafe at roof, Sharjah Co-operative (G+1 Steel Portal Frame Roof), Khorfakkan, Various Villas (G+1) in Sharjah, Labour accommodation shade with mezzanine floor Foundation design for Shredder machine, Mosque and Factory Shed 35 m span for Trofina Foods in Hamariah free Zone, Post Tensioned Beam for 30 m span and Slab for 10m span in Sharjah School Project.
•Designing foundation and shelters for Bitumen plant expansion of Gulf Petrochem in Hamariah Free zone, Dynamic analyses of heavy machines foundation.
•Civil Engineering consultancy for Refinery plant expansion of Arya Petroleum International FZC in Hamariah Free zone
Administrative and Technical head of a Subdivision Responsible for construction of Chandil Dam Left Main Canal in 18 Km length including design and construction of all crossing with road, rail and drainage. Development of Structural design Floating of tender and Technical Bid Evaluation of Offers received from Contractor. Project management including contract management. Supervision of contractor works and releasing contractor payment as per work progress. Approval of design change and variation order due to this change. Ensure the quality of work done as per design and specification.
Project details:-
Subernrekha River Basin Multipurpose Project Jamshedpur
•Construction of Cut and Cover Tunnel for Left Main Canal off taking from Chandil Dam Reservoir
•Design of Aqua Duct and fall for Chandil Left Main Canal, Disign of Branch Canaal from Chandil
Left Canal.
• Design of Spillway for Shuru Reservoir project W. Singhbhum and many more Cross Drainage works for Canal System DLR bridge on Subernrekha River Near Ghaatshila,
•Road over bridge in Koderma on Hazaribagh -Ranchi Rail project, Skew Box bridges on Arrah - Sasaram Rail Project, Sub structure For Various Road Bridges length 40 m to 220m for Bihar State Bridge Construction Corporation and Rural Engineering Organisation Jharkhand
•Construction of Cut and Cover Tunnel for Left Main Canal off taking from Chandil Dam Reservoir;
Technical in Water Ways Circle Chaibasa.
Responsibilities-
Technical approval of all design drawing and estimated quantity, Specification and TBE of tenders . Monitoring progress of all projects in the jurisdiction of this Circle.
Project details:-
This Circle is administrating all Irrigation Project in West Singhbhum District. It includes Sonua Reservoir Project, Jharjhara Reservoir Project, Nakti Reservoir Project, Torlo Reservoir Project and Shuru Reservoir Project
Responsibilities-
Preparation of design drawing and estimated quantity and specification. Supervision of work to ensure the work done as per design and specification. Measurement of work done and checking of contractor bill submitted for payment.
Project details:-
•Sonua Reservoir Project : Sonua Left Main Canal from Km. 0.0 to Km. 18.8 including construction of Road and drainage crossing structure and canal earth work.
Project: -Hajipur Town protection from Flood of Gandak River
- Jan’99 with Water Resources Department, Government of Bihar State (India), Land and Water Management Division
•Basic Design and Detail Engineering
•FEED (Front End Engineering Design)
•Modular Design. Expert in Seismic Analyses and Design
•Expert in PDS Framework and Microstation.
• Sound exposure of IS, BS, EC-2, EC-3, ACI -318, AISC, API, MODU 2013, ASCE-7, UBC2000 and IBC.
•Skilled in usage of sophisticated structural analyses programmes like SACS, ETABS, SAP2000, STAAD Pro, PROKON, Revit Structure and Tekla
•Expertise in design of foundation for process module and heavy machines isolated and mat footing. Versed in site survey of existing plant, knowledge of laser scanning, site survey of existing underground line cable and updating in plant layout.
•Expert in preparation of method statement for installation of process module in plant, preparing lifting calculation, design and drawing keeping in mind HSE first.
Career Timeline
Water Resources Dept. Govt.ofBihar State, Flood and Drainage Div
. in
. (
. (