Project Experience:
•Implementing Risk Based Inspection of Facility Integrity Management System at Jabung Compressor Station
Client: PT Transportasi Gas Indonesia, Indonesia
Responsible for:
•Lead implementation of Risk Based Inspection
•Supervise inspector on RBI implementation on high risk asset
•Review inspection data including UT thickness and radiography
•Update risk calculation and risk matrix
•Recommend risk mitigation
•Prepare technical report
•Presentation to Client’s management
October 2014 - April 2015 PT Tiga Ombak, Jakarta - Indonesia
Organization type: Preservation contractor/Cortec VpCI distributor
FEED review
•Prepare corrosion control document and detail corrosion engineering for topsides, jacket, subsea pipelines and CALM Buoy
•Corrosion rate calculation and material selection (sour service) for topsides facilities
•Corrosion inhibitor dosage
•Selection of coating & fireproofing
•Design cathodic protection system
•Selection of internal corrosion monitoring
•Chemical cleaning specification
•Provide material and corrosion input to other disciplines: Mechanical, Piping, Pipeline, Process, Electrical, Instrument, Civil/Structure
•Presentation to Client (NIOC Iran)
PT Transworld Solution, Jakarta
Organization type: Corrosion vendor/contractor
Jakarta - Indonesia
Organization type: Cathodic protection vendor/contractor
Theses title: Study of IrO2/TiO2 and RuO2/TiO2 Coating on Titanium Substrate for the Anodes in Impressed Current