Sazali Yusof, PROJECT MANAGER

Sazali Yusof

PROJECT MANAGER

Armada TPCE Oil & Gas Engineering Consultant

Location
Malaysia
Education
Bachelor's degree, BEng(Hons) Electrical & Electronic Engineering
Experience
26 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :26 years, 4 Months

PROJECT MANAGER at Armada TPCE Oil & Gas Engineering Consultant
  • Malaysia
  • My current job since January 2017
SENIOR PROJECT ENGINEER at Armada TPCE Oil & Gas Engineering Consultant
  • Malaysia
  • January 2016 to December 2016

Work Description
Armada TPCE was appointed by PETRONAS Carigali Terengganu to provide Engineering Services to support CAPEX/OPEX Facility Improvement Project (FIP) Brownfield, for 2+1 years. The works cover offshore and onshore facilities for PETRONAS Peninsular Malaysia Operations.

Job Responsibilities
Reports to Project Manager in project management and execution of:
• Translating client requirements into practical terms, evaluate, prioritising and organising project tasks into the required timeline.
• Determines project responsibilities by identifying project phases and elements; assigning multi-discipline engineers personnel to phases and elements.
• Determines project schedule by studying project plan and specifications; calculating time requirements; sequencing project elements.
• Maintains project schedule by monitoring project progress; coordinating activities; resolving problems.
• Prepares project status reports by collecting, analyzing, and summarizing information and trends; recommending actions.

SENIOR PROJECT ENGINEER / COMPANY SITE REPRESENTATIVES at PETRONAS CARIGALI
  • Malaysia
  • January 2014 to December 2015

Project Name : Facility Improvement Project (FIP) CAPEX and OPEX (Brownfield Work)

Work Description
• To execute company CAPEX and OPEX (Brownfield) work requested by Operation or internal Group Technical Services upon recommendation and approval from Company Technical Review Committee/Board.
• To coordinate/interface with respective discipline Engineer, Procurement, Contract, Construction, Commissioning, Installation and Operation department to ensure complete work pack are in-order prior issuing ITB to selected vendor’s/contractor’s.
• To develop project scope of work and requirements with input from discipline Engineer’s.
• To participate during Technical and Commercial Bidding Review/Evaluation.
• To ensure project activities in a healthy, safe and environmentally friendly manner and to be compliant with HSE Management System.
• To ensure project activities meet company’s QAQC, specification and relevant requirement.
• To interface day to day with appointed Contractor, meetings and review daily/weekly report issued by Contractor.

Job Responsibilities
Reports to Project Manager, act as a Company Project Engineer/Site Representative for the overall engineering, construction and fabrication, testing and commissioning, installation works (EPCIC) inclusive of Structural, Piping, Mechanical, E&I etc. for dedicated project.

PROJECT ENGINEER / COORDINATOR at LEIGHTON Offshore
  • United Arab Emirates - Sharjah
  • December 2011 to December 2013

Project Name : IRAQ SEALINE PROJECT - IRAQ Crude Oil Export Facility Reconstruction Project (COEFRP)
Cost of Project : USD 68.2 Million
Client : IRAQ South Oil Company (SOC)
Funded by Japan International Cooperation Agency (JICA)

Work Description
The project is to develop IRAQ Crude Oil Export Facility Reconstruction Project (COEFRP). The Project aim is to establish the reliability of the existing pipeline system infrastructure among main terminals of onshore Fao Oil Storage Terminal (FOT), offshore Al Basrah Oil Terminal (ABOT) and offshore Khor Al Amaya Terminal (KAAT). To achieve this aim the existing infrastructure required new facilities. The new pipeline and facilities include:
• 48 " pipeline,
• two valve station platforms (VS-1 at BOT and VS-2 at KAAT) and
• SPM loading terminal. SPM is installed to maintain existing export volumes during condition check of existing pipelines.
The 48” pipeline route is from the onshore (FOT) to Valve Station platform (VS-1) and branched to the existing BOT Loading Platform-B and the new SPM loading terminal. From VS1 the new 48” pipeline is branched to another new Valve Station platform VS-2 to be installed at KAAT area so as to interconnect the existing BOT loading platform to the KAAT.

Job Responsibilities
Reports to Project Manager, act as a Company Project Engineer/Coordinator for the overall construction and fabrication, testing and commissioning, installation works inclusive of Structural, Mechanical, E&I, Load-Out activities based at Sharjah Fabrication Yard for:

• VALVE STATION PLATFORM 1
• Valve Station Platform 2
• Connecting bridge VS1 to BOT Living Quarters
• Connecting bridge support VS1 to BOT Living Quarters
• Connecting bridge VS2 to KAAT
• 48” Riser & clamps for BOT
• 2 x J Tubes for BOT
• J Tubes for KAAT
• Valve skid for KAAT
• Valve skid for BOT

Project Engineer at MMHE-TPGM JV
  • Turkmenistan
  • October 2006 to November 2011

Project Name : TURKMENISTAN BLOCKS 1 GAS DEVELOPMENT PROJECT, Republic of Turkmenistan - EPCIC of Magtymguly Collector Riser Platform (MCR-A)
- EPCIC of Magtymguly Drilling Platform (MDP-A)
Client : Petronas Carigali Turkménistan Sdn Bhd (PCTSB)

Work Description
The project is to develop Block 1, Caspian Sea located between 30-100km offshore of Turkmenistan and in 30-100m water depth. PCTSB has engaged MMHE/Technip JV to perform Engineering, Procurement, Construction, Installation & Commissioning (EPCIC) in two (2) phases for Block 1 field development. Gas Full Field Development Phase 1A Gas (MDP-A & MCR-A) to achieve gas sales of 250 MMscfd by end March 2010. Gas Full Field Development Phase 1B Gas (OWEZ) to achieve 500 MMscfd by end September 2010. MCR-A is a collector riser type platform. The jacket is a 4-legged fixed GBS foundation structure with section skirt arrangement. The MDP-A is a drilling platform connected by a bridge to MCR-A.

Job Responsibilities
Reports to Senior Resident Manager, responsible for:

a) Magtymguly Drilling Platform (MDP-A)
- As a Project Coordinator (KL Base) for Engineering & Procurement deliverables to site (Turkmenistan).
- Follow-up on Engineering & Procurement status are accordance to project planning, schedule and client specification.

b) Magtymguly Collector Riser (MCR-A) - Fabrication works (12000 MT)
- As a Project Coordinator for Engineering, Procurement, Construction, Installation & Commissioning for the MCR-A deliverables. (Based in Kiyanly, Turkmenistan)
- Follow-up on Engineering, Procurement, Construction, Installation & Commissioning for the MCR-A status are accordance to project planning, schedule and client specification.
- Full time involved as a Project Coordinator for the construction & fabrication works for the MCR-A inclusive of Structural, Mechanical, E&I, HVAC, Architecture & Load-Out activities based at MMHE Pasir Gudang, Johor and Kiyanly, Turkmenistan.
- Involved from project bidding, evaluation, planning, scheduling, and resource management and coordinating with other technical discipline to ensure timing, quality and safe completion of project in accordance with specifications.
- Assist Huck-Up and Commissioning team coordinating and execute the works.

Project Engineer at Peremba-Intec-Sudan Pile Consortium
  • Sudan
  • January 2006 to September 2006

Project Name : MELUT BASIN OIL DEVELOPMENT PROJECT - EPCC of Bashayer 2 Marine Terminal Facilities, Republic of Sudan
Cost of Project : USD 232 Million
Client : Petrodar Operating Company Ltd (PDOC)

Work Description
The project involved the EPCC of Marine Terminal Facilities (Marine Tankage Terminal including process facilities and Single Point Mooring) located in Port of Sudan on the Red Sea Coast. The Terminal designed for 2, 000, 000 BPD shipping rate with 300, 000 DWT tanker mooring capacity and 4, 500, 000 bbl ultimate crude oil storage capacities. The facility consists of crude inlet system & storage, crude export & metering system, open drain & effluent water system, closed drain & relief system, hot oil system, instrument and utility air system, fire protection system, potable & utility water system, wax processing system, crude fuel & diesel fuel system, power generation & distribution system, plant control system including SCADA, plant emergency shutdown system, cathodic protection system, heat tracing system, CALM system, subsea pipeline & onshore pipeline.

Job Responsibilities
Reports to Lead Mechanical Engineer & Project Manager/Director, responsible for mechanical department project planning, scheduling, execution, encompassing resource management, control & coordinating with other technical discipline to ensure timing, quality and safe completion of project in accordance with specifications & within cost for the :
a) Crude export metering system
b) Hot oil system
c) Instrument & utility air system
d) Fire protection system
e) Potable & utility water system
f) Wax processing system
g) Crude fuel & diesel fuel system
h) Power generation & distribution system

Project Engineer at MMC Oil & Gas Engineering
  • Malaysia
  • August 2000 to December 2005

Work Description

a) To assist Project Manager in project management and execution.
b) To assist Project Manager in preparing bid proposal, scheduling and project planning.
c) To coordinate, prepare & review project reports, ITB, IFC, AFC and documentations consistency with client requirements i.e. PTS and other international standards & specifications.
d) To coordinate, implement, execute and oversee the progress of the project & final project acceptance undertaken as a client representative. (onshore/offshore).
e) To present, conduct meeting & liaise with clients to ensure proper coordination and communication with appointed contractor. (onshore/offshore).
f) To coordinate and attend local & oversea project FAT (Factory Acceptance Test) with client -i.e. Italy (valve), Germany (pumps), UK (pumps), Turkey (transformer, gen-set)
g) To attend site visit with client and relevant discipline engineer in order to ensure the progress of the project undertaken meet client requirements and specifications.
h) To assist, develop and oversee client to evaluate the ITB technical & commercial proposal.

Client

a) PETRONAS Carigali Sdn. Bhd. (PCSB)
b) PETRONAS Gas Berhad (PGB)
c) PETRONAS Penapisan (Terengganu) Sdn. Bhd.
d) BASF Petronas Chemical Sdn. Bhd. (Gebeng)

Project Engineer at Puncak Niaga (M) Sdn Bhd
  • Malaysia
  • January 1998 to July 2000

Work Description

Involved in design, built, operate and maintain water supply system and facilities with a total produce capacity of 950 MLD treated water. Constructing 4 units of reservoirs, installation 120 km of water pipeline distribution and 1 unit of Booster pumping Station. Seconded to consultant, SMHB to coordinate, supervised & monitored the site installation, testing, commissioning and maintenance of M&E works for the:
a) Raw water intake works & pumping station
b) Raw water & treated water pumping mains.
c) Water treatment plant including treated water pumping plant & sludge treatment facility, mechanical & electrical, SCADA/instrumentation/telemetry works. Chemical plant including fluoride, polyelectrolyte, lime & alum preparation equipment & control room. Building services including firefighting system, telephone services & electrical system.
d) To coordinate and involve for the plant SCADA, telemetry, MCC, LCP, SP, IP, starter board and switchboard inspection, testing, installation and sequence process testing at factory and site.
e) To verify and involve in electrical panel energizing, performance test, setting and procurement of spare parts tool for M&E equipment at site.
f) To review and clarify works done by M&E contractor at site accordingly to the requirements of the contract and specifications.

Education

Bachelor's degree, BEng(Hons) Electrical & Electronic Engineering
  • at University of Portsmouth
  • May 1997
Diploma, Diploma In Electrical & Electronic Engineering
  • at University Technology of Malaysia
  • May 1995

Specialties & Skills

Project Management
General Construction
Engineering
Metal Fabrication
Project Coordination
MS Word

Languages

English
Expert
Malay
Native Speaker
Russian
Beginner
Tagalog
Beginner

Memberships

The Institution of Electrical Engineers (IEEE) United Kingdom
  • Graduate Associates Member
  • January 1995
Board of Engineers Malaysia
  • Graduate Members
  • January 1998
Institution of Engineer (IEM) Malaysia
  • Graduate Members
  • January 2002

Training and Certifications

Permit To Work System – Certificate of Competency - PETRONAS (Certificate)
Date Attended:
February 2013
Valid Until:
January 9999
Basic First Aider Certificate - Emirates Technical & Safety Development Center, Abu Dhabi, UAE (Certificate)
Date Attended:
August 2012
Valid Until:
January 9999
Hydrogen Sulphide Awareness Onshore (H2S) (Training)
Training Institute:
Terengganu Safety Training Centre, (TSTC), MALAYSIA
Date Attended:
August 2013
Duration:
8 hours