Project Engineer
Tafawuq Facility Management
Total years of experience :11 years, 2 Months
o Inspection of ADM, ADDC, ADCD approved drawings and comparing to Base Built layout
o Prepare the construction work programs as per the guidelines provided and executing work as per drawings ( Structural, Architectural and Electrical)
o Maintained and monitored on-demand work order control systems.
o Upheld health safety and government regulations in all work operations.
o Conducted regular maintenance checks on facility buildings and outbuildings
o Assisted in overhaul of electrical and plumbing equipment.
o Coordinated budget management with Facility Operations department.
o Maintaining and monitoring of MEP supervisor and workers
o Assisted in overhaul of electrical and plumbing equipment.
o Conduct Monthly wise on-job training to supervisor and workers
o Direct and coordinate manufacturing, construction, installation, maintenance, support, documentation, and testing activities to ensure compliance with specifications, codes, and customer requirements.
o Inspect completed installations and observe operations, to ensure conformance to design and equipment specifications and compliance with operational and safety standards.
o Supervise and train project team members as necessary.
o Confer with engineers, customers, and others to discuss existing or potential engineering projects and products.
o Ensure a safe work environment for all project employees, contractors and visitors.
o Perform site inspections as per HS&E manual schedule.
o Communicate any significant issues or concerns with the HS&E Manager for direction
o Communicate and assist workers to insure that all safety expectations are met.
Assessment of the area, Risk and Hazard involved,Safety Audits conducted
involvement with Pressure, harmful effects of gases in and of oil field shores. health and safety drills with personal protective equipments
2008-2012 - Bachelor of Engineering (Electronics and Electricals Engineering), Birla Institute of Technology, Ranchi with cumulative GPA of 6.4 till 7th semester Projects Completed: Project 1: Heart Rate Meter Controlling Using Microcontroller Abstract: Heart rate was measured with the help of blood flow and LED with the help of Microcontroller will decide the heart rate. Project 2: Wireless Power Transmission Table-top Demonstrator Abstract: With the help of inductive coupling we have transmitted power using copper rods and have successfully transmitted power without any wires and powered low voltage bulbs. Project 3: Wave Energy Harnesser and Power stabilization Abstract An electro - mechanical project in which we created our own unique design and using buoys on tides harnessing electricity and stabilizing the electricity using the stabilization circuitry.
2006-2008 - Integrated Engineering in Birla Institute of Technology, Ranchi