Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Alexandr Gerassimenko, Instrument / control engineer

Alexandr Gerassimenko

Instrument / control engineer·ENI Iraq b.v.

United Arab Emirates

Bachelor's degree, Control system engineer

Work experience

Total years of experience: 22 years, 0 months

Instrument / control engineer

June 2014 - Present

ENI Iraq b.v.

Dubai, United Arab Emirates

June 2014 - Present

Includes 4 Gas Turbines, including 2 working on the dual fuel as black start generators, and Balance of Plant equipment: diesel oil, fuel gas, de mineralized water potable water, cooling systems. ICSS that comprise of: DSC, F&G, GT control system, ENCS (electrical network control system), HV EMS (electrical management system.)

Company industry:
Oil & Gas
Job role:
Engineering

Chief Instrument Engineer

October 2012 - Present

GazPromNeft-Badra b.v.

Dubai, United Arab Emirates

October 2012 - Present

KEY RESPONSIBILITIES:
• Preparation of scope of work and all relevant documentation for tendering.
• Revision of all instrumentation documents issued by the Engineering Services Contractors (e.g. technical reports, specifications, procedures, drawings, concession requests, technical requests etc).
• Issue of all kind of engineering deliverables, i.e. cable block diagrams; interface block diagrams; principal electrical schematics; loop diagrams; plotplans, layouts; equipment, products and material specifications; philosophies; cable schedules; mounting drawings; hook-up drawings; material take-off; cable and conduit routing diagrams and schedules etc.
• Assessment of the compliance of instrument design documentation with International, local and company standards, QA/QC and HSE requirements.
• Interface with other project disciplines to ensure smooth, reliable and timely flow of data/information.
• Liaising with clients/contractors to ensure all milestones are met, and SDRS/JDL is done in full capacity.
• Selection of the equipment (sensors, panels, PLCs, junction boxes etc) and hardware.
• Commissioning Punchlist downgrading.
• Organization and direct participation in Technical Committee for the project final handover.
PARTICIPATION IN PROJECTS:
11. EPC Contract for Infrastructure Project in Republic of Iraq, with Iraqi Elite, India-UAE,
Includes 25 buildings equipped with F&G, PAGA, HSSD and utilities: Diesel fuel system, potable water, cooling water, drainage system, oily water systems equipped with field instrumentation wired to central PLC, interfaces with DCS and F&G workstations.
10. EPC Contract for Oil Gathering System in Republic of Iraq, with CPP, China
includes 17 production wells, equipped with smartwell control system, ESD, SCADA, HIPPS, self-contained electro-hydraulic Block Valves, Multiphase flowmeters. 3 manifolds, 3 trunklines, Fiber optical cables, chemical injection packages, Leak detection system based on negative wave detection, integration with Central Process Facility SCADA.
9. EPC Contract for 165 km of 24” oil export pipeline in Republic of Iraq, with CPP, China
includes Oil trunklines, 7 off Block Valve Stations, Fiber optical cables, tie-in points in existing Iraqi Strategic Pipeline, new designed Badra Tank Farm, Leak detection system based on negative wave detection, solar panel based power distribution system, integration with Central Process Facility SCADA.
8. FEED for Water Intake System from Tigris River in Republic of Iraq, with PunjLloyd, India-UAE
includes Water Intake Facility, equipped with potable water storage tanks, water treatment system, diesel fuel facility, accommodations etc. Also water 65 km pipeline with 1 intermediate Block Valve station.

Company industry:
Oil & Gas
Job role:
Engineering

Chief Instrument Engineer

October 2012 - April 2014

GazPromNeft-Badra b.v

United Arab Emirates

October 2012 - April 2014

10.2012 - Present
GazPromNeft-Badra b.v., Dubai, UAE
Position: Chief Instrument Engineer

Job role:
Engineering

Senior E&I engineer

April 2011 - September 2012

Kellogg Brown and Root international inc.

Kazakhstan

April 2011 - September 2012

7. Contract Kashagan Trunkline and Flow Lines - EPC 2, 3, 4, & FFD-PI with Saipem SpA, Italy
includes Oil and Gas trunklines, Power and Fiber optical cables, Methanol/Chemicals umbilicals between Onshore Process Facility and Offshore production island: 200 km subsea installation, and 25 km underground onshore. Associated subsystems: cathodic protection, SCADA system (Invensys), telecomm system, ESD system, overhead power line 10kV, low voltage power distribution, HVAC for AGI shelters, heat tracing.

Company industry:
Oil & Gas
Job role:
Engineering

Instrument&Electrical engineer

September 2007 - April 2011

Agip KCO North Caspian Operation Company b.v

September 2007 - April 2011

09.2007 - 04.2011
Agip KCO North Caspian Operation Company b.v., Atyrau, KZ
Position: Instrument&Electrical engineer
Department: EP Clusters and Pipelines

Job role:
Other

Instrument&Electrical engineer

September 2007 - April 2011

Agip KCO North Caspian Operation Company b.v.

Kazakhstan

September 2007 - April 2011

6. Pig Trap Skids Procurement, Fabrication and Assembly Contract with KCOI LLP, KZ, Aktau
Project value is 30 Million USD, EPF contract for the detailed engineering and fabrication of 8 pipeline pig trap skids and associated piping and structure. Responsibilities included actins as part of AKCO engineering team in the management of the contract during the execution phase followed up by acceptance of the ready skids and sailing away to D-island.
5. Service Contract, Hydrate management predictive software system (Island A to Complex Island D) with SPT Group, Norway
Project Engineering on the supply of state of the art pipeline hydrate management software and associated hardware. Responsibilities included direct daily management of the contractor, attending weekly project progress meetings, timely approvals of the engineering and suppliers’ deliverables as well as arrangement of shipment of hardware in RoK from Norway, negotiations of proposals and issuance of variation orders.
4. Cutting and oily water treatment facility belonging to Agip KCO. Modification of existing control systems for:
• Diesel Fuel Storage and Distribution system (40 signals, stand alone PLC).
• Fire Water/Foam Systems (vendor package, based on in-house design).
• Recovered Oil & Water System (50 signals).
• Settlement and equalization system (circa 100 signals, DCS, HMI).
• Oily water treatment system (70 signals).
• Open and close drainage systems (vendor packages, based on in-house design)
3. Bautino marine Base belonging to Agip KCO including:
• Updating of potable water system (increasing capacity of existing potable water facility with a second skid.)
• FEED and Basic Design for salt water Desalination plan (reverse Osmosis technology)
• Reconstruction of Data/telecom system for Bautino Base (single mode fiber optic cabling, CISCO LAN switches and routers, patch panels, UPS, SCS)
• Fire fighting/suppression central monitoring station (wireless system)

2. Koshanai Waste Management Facility (Agip KCO), FEED, Basic and detailed design of control system, fire/gas detection system, telecom system, CCTV system, Access control system:
• Diesel fuel system, potable water system, Technical water system, Fire water system, Treated effluent water, etc. (circa 2000 signals, DCS based on Profibus communication network)
• Fire&Gas detection system/Fire suppression system (15 building, including 2 equipped with foam extinguishing system and 1 with gas suppression system )
• Access control system (4 buildings), CCTV system (15 cameras)

Company industry:
Oil & Gas
Job role:
Electrical Engineering

Instrument engineer

June 2004 - August 2007

Engineering company "MunayGas"

June 2004 - August 2007

06.2004 - 08.2007
Engineering company "MunayGas", Astana, KZ
Position: Instrument engineer

Job role:
Engineering

Instrument engineer

June 2004 - August 2007

Engineering company «MunayGas»

Kazakhstan

June 2004 - August 2007

1. KazTransOil oil pumping stations’ Integrated Control and Safety System (MunayGas)
including: ESD, F&G, DCS systems for the following stations: HOPS Chulak-Kurgan, OPS Suzak, OPS Zhuan-Tobe, HOPS Karakoin, HOPS Uzen’, HOPS Atyrau, HOPS Shymkent, HOPS Boloshoy Chagan, OPS Sakharnii, OPS Ekibastuz).
• Developing system of automation for oil heater G9PO2-V and PTB-10, belonging to JSC «KazTransOil»
• FEED for gaspipeline Kazakhstan-China (DCS system).

Company industry:
Oil & Gas
Job role:
Engineering

Education

, Karaganda State Technical University

June 2004

June 2004

Bachelor's degree, Control system engineer

Kazakhstan

Karaganda State Technical University

January 2004

January 2004

Bachelor's degree, Control system engineer

2004 - 1999, Karaganda State Technical University 5 years full-time study. Diploma, Control system engineer KEY RESPONSIBILITIES: • Preparation of scope of work and all relevant documentation for tendering. • Revision of all instrumentation documents issued by the Engineering Services Contractors (e.g. technical reports, specifications, procedures, drawings, concession requests, technical requests etc) • Issue of all kind of engineering deliverables, i.e. cable block diagrams; interface block diagrams; principal electrical schematics; loop diagrams; plotplans, layouts; equipment, products and material specifications; philosophies; cable schedules; mounting drawings; hook-up drawings; material take-off; cable and conduit routing diagrams and schedules etc. • Assessment of the compliance of instrument design documentation with International, local and company standards, QA/QC and HSE requirements. • Interface with other project disciplines to ensure smooth, reliable and timely flow of data/information. • Liaising with clients/contractors to ensure all milestones are met, and SDRS/JDL is done in full capacity. • Selection of the equipment (sensors, panels, PLCs, junction boxes etc) and hardware. • Commissioning Punchlist downgrading. • Organization and direct participation in Technical Committee for the project final handover. PARTICIPATION IN PROJECTS: 11. EPC Contract for Infrastructure Project in Republic of Iraq, with Iraqi Elite, India-UAE,

Doctorate, Republic of Iraq

Includes 25 buildings equipped with F&G, PAGA, HSSD and utilities: Diesel fuel system, potable water, cooling water, drainage system, oily water systems equipped with field instrumentation wired to central PLC, interfaces with DCS and F&G workstations. 10. EPC Contract for Oil Gathering System in Republic of Iraq, with CPP, China includes 17 production wells, equipped with smartwell control system, ESD, SCADA, HIPPS, self-contained electro-hydraulic Block Valves, Multiphase flowmeters. 3 manifolds, 3 trunklines, Fiber optical cables, chemical injection packages, Leak detection system based on negative wave detection, integration with Central Process Facility SCADA. 9. EPC Contract for 165 km of 24" oil export pipeline in Republic of Iraq, with CPP, China includes Oil trunklines, 7 off Block Valve Stations, Fiber optical cables, tie-in points in existing Iraqi Strategic Pipeline, new designed Badra Tank Farm, Leak detection system based on negative wave detection, solar panel based power distribution system, integration with Central Process Facility SCADA. 8. FEED for Water Intake System from Tigris River in Republic of Iraq, with PunjLloyd, India-UAE includes Water Intake Facility, equipped with potable water storage tanks, water treatment system, diesel fuel facility, accommodations etc. Also water 65 km pipeline with 1 intermediate Block Valve station. 7. Contract Kashagan Trunkline and Flow Lines - EPC 2, 3, 4, & FFD-PI with Saipem SpA, Italy includes Oil and Gas trunklines, Power and Fiber optical cables, Methanol/Chemicals umbilicals between Onshore Process Facility and Offshore production island: 200 km subsea installation, and 25 km underground onshore. Associated subsystems: cathodic protection, SCADA system (Invensys), telecomm system, ESD system, overhead power line 10kV, low voltage power distribution, HVAC for AGI shelters, heat tracing. 6. Pig Trap Skids Procurement, Fabrication and Assembly Contract with KCOI LLP, KZ, Aktau Project value is 30 Million USD, EPF contract for the detailed engineering and fabrication of 8 pipeline pig trap skids and associated piping and structure. Responsibilities included actins as part of AKCO engineering team in the management of the contract during the execution phase followed up by acceptance of the ready skids and sailing away to D-island. 5. Service Contract, Hydrate management predictive software system (Island A to Complex Island D) with SPT Group, Norway Project Engineering on the supply of state of the art pipeline hydrate management software and associated hardware. Responsibilities included direct daily management of the contractor, attending weekly project progress meetings, timely approvals of the engineering and suppliers' deliverables as well as arrangement of shipment of hardware in RoK from Norway, negotiations of proposals and issuance of variation orders. 4. Cutting and oily water treatment facility belonging to Agip KCO. Modification of existing control systems for: • Diesel Fuel Storage and Distribution system (40 signals, stand alone PLC) • Fire Water/Foam Systems (vendor package, based on in-house design) • Recovered Oil & Water System (50 signals) • Settlement and equalization system (circa 100 signals, DCS, HMI) • Oily water treatment system (70 signals) • Open and close drainage systems (vendor packages, based on in-house design) 3. Bautino marine Base belonging to Agip KCO including: • Updating of potable water system (increasing capacity of existing potable water facility with a second skid.) • FEED and Basic Design for salt water Desalination plan (reverse Osmosis technology) • Reconstruction of Data/telecom system for Bautino Base (single mode fiber optic cabling, CISCO LAN switches and routers, patch panels, UPS, SCS) • Fire fighting/suppression central monitoring station (wireless system) 2. Koshanai Waste Management Facility (Agip KCO), FEED, Basic and detailed design of control system, fire/gas detection system, telecom system, CCTV system, Access control system: • Diesel fuel system, potable water system, Technical water system, Fire water system, Treated effluent water, etc. (circa 2000 signals, DCS based on Profibus communication network) • Fire&Gas detection system/Fire suppression system (15 building, including 2 equipped with foam extinguishing system and 1 with gas suppression system) • Access control system (4 buildings), CCTV system (15 cameras) 1. KazTransOil oil pumping stations' Integrated Control and Safety System (MunayGas) including: ESD, F&G, DCS systems for the following stations: HOPS Chulak-Kurgan, OPS Suzak, OPS Zhuan-Tobe, HOPS Karakoin, HOPS Uzen', HOPS Atyrau, HOPS Shymkent, HOPS Boloshoy Chagan, OPS Sakharnii, OPS Ekibastuz) • Developing system of automation for oil heater G9PO2-V and PTB 10, belonging to JSC "KazTransOil" • FEED for gaspipeline Kazakhstan-China (DCS system)

Skills

ABB
Beginner
ABB
Beginner
ACCESS
Beginner
ACCESS
Beginner
ANSYS
Beginner
ANSYS
Beginner
AUTOCAD
Beginner
AUTOCAD
Beginner
AUTOLISP
Beginner
AUTOLISP
Beginner
AVAYA
Beginner
AVAYA
Beginner
CCTV
Beginner
CCTV
Beginner
ENGINEER
Expert
ENGINEER
Expert
EPC
Expert
EPC
Expert
WATER SUPPLY
Intermediate
WATER SUPPLY
Intermediate

Languages

English
Expert
German
Expert
Russian
Expert