على abdul ghani, project construction manager

على abdul ghani

project construction manager

PROTECHINIC

البلد
العراق
التعليم
بكالوريوس, BSC in civil engineering
الخبرات
44 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :44 years, 3 أشهر

project construction manager في PROTECHINIC
  • العراق - البصرة
  • أشغل هذه الوظيفة منذ يناير 2019

planning construction activities, control subcontractors, management planning , assessing drawings, implementation of cost cashflow plan, preparing reports

Technical Director في Golden Axe for trading &contracting
  • العراق - البصرة
  • سبتمبر 2014 إلى أكتوبر 2018

implementation of all planning for execution, procurement, human resource, logistic and risks .leading execution teams .management of financial affairs, project management,

director في ENGINEER ALI ABDUL RAZZAK bureau
  • العراق - بغداد
  • ديسمبر 1979 إلى أغسطس 2016

1992-1994 - As a main contractor: - Building two houses in Baghdad.
2000-2004 - As a main contractor construction of two 4- stories buildings
- Demolishing 3 - story building.

2004-2006 - As Subcontractor for KBR American company - Rehabilitation for 5 building in the Baghdad Military
academy.

2006-2008 - Rehabilitation of five water treatment plants in Baghdad
&three sewerage pumpstation in Baghdad

U 2009 - implement of primary assessment for the big Rusafa water
U For Degrmont company.
U Treatment project
2010 :RESIDENT ENGINEER for JWJ consultant UK, project sport town in BASRAH-IRAQ

2011-2014 : PROJECT MANAGER FOR ALMIRIHJ CONTRACTING CO. PROJECT construction of 3 Hospitals of 200 beds and 200 million$ .
2014 -recent : TECH. DIRECTOR for GOLDEN AXE .
PROJECT :Construstion of 2 big factories with supply commissioning machines

project manager في Al mirahij
  • العراق - الموصل
  • أغسطس 2012 إلى يونيو 2014

200 bed mega hospital consist of five multi story buildings of 145 dual patient residence rooms, seven different purposes operation rooms, doctor residents, emergency department, etc....
my role was making an assessment for all documents and drawings to determine their comply to specifications, execute drawingsوsupply all materials, labors, skilled labors, machines and equipment essential for construction

Project manager for electro-mechanic ofALrusafa water treatment: في NOVA E.T.C
  • العراق - بغداد
  • يناير 2011 إلى ديسمبر 2011

2011 U - Project manager for electro-mechanic ofALrusafa water
U Treatment project : management of recruitment of engineers, technicians & labors . construction of camp near by the site which includes :administration, warehouses, workshops &etc .Formation of electrical & mechanical for implementing the items of the project which consist of all electrical &mechanical installations for the treatment of raw water taken from the river &treated to be tap water pumped in the main network of Baghdad city with a capacity 500000 mgd .

resident engineer one of English firm crew في J.W.J ENGLAND
  • العراق - البصرة
  • يناير 2010 إلى ديسمبر 2010

2010 U -As a resident engineer one of English firm crew for youth Ministry in sport town in BASRAH. my role as a consultant engineer reviewing structural and services drawings to comply with the technical standards, giving confirmation to the methods of statement , consequences of work category , supervising the execution works giving approvals for rebaring and shuttering and submittal materials .

contractor في Ministry of Industry
  • العراق - بغداد
  • يناير 1988 إلى ديسمبر 1988

1988 As a contractor for Ministry of Industry.
- Construction the concrete structure & footing for 2 story
building.

execution engineer في Nova Contraction Company
  • العراق - بغداد
  • يناير 1988 إلى ديسمبر 1988

1988 As an execution engineer for Nova Contraction Company.
- Construction of 8000 m2 concrete floor warehouse.
- Construction 1000 m2 asphalted parking area.

sub contractor في Austrian firm (Elboo)
  • العراق - بغداد
  • يناير 1987 إلى ديسمبر 1987

1987 - As subcontractor for Austrian firm (Elboo)
- Earth works & sub base work for the inner roads of Um-
Alutham resident building complex.construction of inner roads &parking lots for VIP resident complex inside of THE PRESIDENTIAL AREA .

owner في ENGINEER ALI ABDULRAZZAK bureau
  • العراق - بغداد
  • يناير 1986 إلى ديسمبر 1986

1986 - Rehabilitation of youth center.
- Rehabilitation for woman union 4 story building.

owner في ENGINEER ALI ABDUL RAZZAK bureau
  • العراق - بغداد
  • يناير 1985 إلى ديسمبر 1985

19980- 1985 - Military service (air force corps of engineers), resident
engineer.
- Main responsibilities: - Quality control, Quantity calculations,
monthly payments preparation and approving.
- Air force head quarters shielded building.
- Al Baghdadi air base inner roads act.
- Al Baghdadi air base heavy airplanes shelters.
As A main contractor:

الخلفية التعليمية

بكالوريوس, BSC in civil engineering
  • في Civil Department /Engineering College - Baghdad unversity
  • أغسطس 1979

Specialties & Skills

On Site
Project Management
CONCRETE
DESIGNING WASTE
ENGINEER
PAYMENTS
PROJECT MANAGER
TREATMENT PLANTS
WATER TREATMENT
civil engineering

اللغات

العربية
متمرّس
الانجليزية
متمرّس

العضويات

IRAQI ENGINEERS UNION
  • member
  • October 1979

التدريب و الشهادات

PMP Exam Preparation Course (تدريب)
معهد التدريب:
MAPLES Project MANAGEMENT
تاريخ الدورة:
April 2015
المدة:
35 ساعة