Project Engineer Assistant
World Vision Lebanon
Total years of experience :9 years, 0 Months
Project Specification: building water canals for the irrigation system in Akkar territory and executing access roads to the fields.
• Support in the development of Bill of Quantities (BOQs) based on the technical drawings and tender documents.
• Assist in the design, specifications and planning for water and wastewater treatment and infrastructure projects.
• Work with the Project engineer to develop detailed, site-specific (Monthly) work plans to ensure adequate technical oversight of the interventions at the field-level.
• Supervise field-level infrastructure implementation for an irrigation canal with all the related civil works.
• Attend and participate in capacity building trainings locally and internationally.
• Attend and participate in World Vision Lebanon’s spiritual nurture and other organizational events.
Responsible of and site managing project “ Total Destroyed Building” in Naher Al Bared Camp, In charge of its design and execution. Supervise all execution work including foundation, reinforcements, formwork, and concreting of all structural elements. Tests for concrete quality checking ( compressive strength, slump)
Surveying and responsible of renovating and rectifying old schools buildings in North Lebanon, surveying and handing over block erection, plastering, painting, tile fixing with all the necessaries site inspection.
Quantities estimator and surveyor for the above-mentioned subjects, following up the delivery of the requested resources and materials.
supplier and applicator assignment for designed scope work, managed end-to-end daily and weekly reporting to the construction manager and managed project closure activities while ensured client satisfaction.
Lead technical assessments of housing rehabilitation and upgrades, totally destroyed buildings, schools… in line with NRC’s project criteria, in order to support assessments and any other shelter intervention.
Produce accurate drawings, reports, measurements (BoQs) and/or photographs as evidence of a technical assessment.
Work with the Team Leader & Technical Coordinator on the implementation of projects including properties selection, meeting with refugee and host communities, assessments, monitoring, distribution, BoQs production, revision, and approval duplication, Supervision of work.
•Responsible of designing and executing a whole floor at a roof building from A to Z, the design was based on steel construction( steel supporting, corrugated sheet roof with insulation, interior wall partitioning) and finishing (plastering, tile erection, painting..)
•In charge of managing the site staff and assigning sub-contractors ( civil, architect, MEP) quality control, preparing the BOQ’s and work schedules for the project.
•Work as a Site Engineer and supervise all construction activities. Manage site staff, quality control, Preparing the BOQ’s and work schedules for the project.
•Preparing AutoCAd Shop drawings and as built drawings for all project( Six building, Coops, Plans, Roads, Parking..).
•Preparing AutoCAD Shop drawings and as built drawings.
•Supervising the work and making sure it is done as shop drawings and specifications.
•Dealing with suppliers.
•Preparing AutoCAD Shop drawings and as built drawings.
•Prepare take offs and BOQ’S.
•Deluxe Construction.
•Supervision.
• Gained experience with Post tension.
• Gained experience with stairs construction, reinforcements and formworks.
• Gained experience with of all structural elements (columns, beams).
• Finishing.
Supervised all execution work including foundation, reinforcements, formwork, and concreting of all structural elements.
• General introduction to structural drawings
• AutoCAD drafting of reinforcement details for columns and beams
• Design of beams and ribs for Hourdi slab system