Department: Development Projects - Major projects Management.
• Year from 2012 to Feb. 2024
• Lead many committees of projects and Construction, D&Ds units' installation in DS04, DS03 Degassing stations with excellent results now single point accountability for Mishrif Quarinat New Trains ongoing construction, D&Ds /E-MQNT, D&DS/DS05 ongoing construction, I have experience of technical evaluation for major projects in Rumaila Field.
• Concept projects study council for FWKO/PWT (SR & NR (DG02, DG04 & DG05), RPP150MW, Water projects (PWRI/PWT/PWD), D&Ds unites.
• Module Review & modify a (30, 60 &90% huge projects constructed) in ROO.
• RFI, RFP, TBE/ MQNT 240MBD Degassing station of Rumaila Field, currently I'm led to manage of RFP stage of this project, so I'm SPA, Team leader.
• Identify, Assessment projects Risks.
• Lead meeting (projects management meetings) MOM.
• Participation for reports and review the cost and budget for projects .
• Hold and participate for all stages(SG1, SG2, SG3 and MC1, MC2, Strat up), implement for projects and illustrate the deviation through an execution .
• SPA OF DSO5/TEST TRAIN D&Ds 60 mbd ongoing installation.
• E- MQNT /D&Ds HAZOP & LOPA (Notes& comments )
• HAZOP &LOPA free water knock drums for (SHAMYIA, QURAINT, RUMAILA, JANUBYA, DSO2 and DSO4) With BP, WOOD GROUP, TEKFEN, PETROFACT AND PEG).
• HAZOP &LOPA DS05 NEW TRAINS.
• LP FLARE PROJECTS HAZOP REVIEW FOR DS02.
• Projects Management .
Piping and Instrument Diagram (P&ID)
• Review many PIDs for oil and water facilities in Rumaila.
• Review typical PIDs for oil and water injection manifolds.
• Worked in technical evaluation team.
• Attended many meetings with international and local contractors to negotiate contracts.
• Single point accountability for Mishrif Quraint New Trains Project & other projects
• I have good knowledge and relationship with all Rumaila staff that make my job very easy to find information fast.
• Involved in & participated of lot of meeting, discussion were hold in IRAQ, overseas (UK)
• Involved in Completion engineering package of extension water injection manifold of CPSs. NR. (TYPICAL DOCUMENTS)
• Participated at RFI, RFP of lots of projects in Rumaila field, HAZOP &LOPA(New trains, D&Ds units, LP/Flare DEG, PWP.
• SPA for lots of projects currently SPA MQNT/Rumaila field
• Also following 24"export line from MQNT New trains to ZUB2 Farm .
Year from 2012-2013
My responsibility on these sites as follows:
• Optimization team for oil wells (South Rumaila), engineering team (MOC), TANKS DIP, Measurement).
• Have good assessment, for example, arrange with the fire department or ambulance. Shut the plant safely where possible and if not then evacuate the station as per guidelines.
• Operation and shutdown for degassing station: When on shift I was responsible on every shutdown and operation for degassing station. This was done as per the procedures, for example starting a well in the field.
- Company industry:
- Oil & Gas
- Job role:
-
Engineering