Ali Hyder shah, Senior Project Engineer

Ali Hyder shah

Senior Project Engineer

China Petroleum engineering and construction corporation

Lieu
Pakistan - Hyderabad
Éducation
Baccalauréat, Mechanical Engineering
Expérience
26 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :26 years, 8 Mois

Senior Project Engineer à China Petroleum engineering and construction corporation
  • Irak - Al Amarah
  • Je travaille ici depuis septembre 2022
Construction Manager à Sendan International
  • Arabie Saoudite - AlJubail
  • septembre 2021 à août 2022

The project covers design, engineering, material, procurement, fabrication, assembly, testing, supply, installation supervision and commissioning of and AXL & GAS Condensate Fire Protection System Upgrade Project and Replace Chemical Injection Skid System Project required utilities and facilities

Deputy Manager Construction à China Petroleum Engineering & Construction Corporation
  • Irak - Bassorah
  • janvier 2019 à mai 2020

Project: Garraf Oil Field Project-Iraq
Client: PETRONAS Carigali Iraq Holding B.V (PCIHBV)
Contractor: China Petroleum engineering & construction corporation (Middle East)
Project summary:
CONTRACTOR’s scope of WORK under this CONTRACT shall include Engineering, Procurement, Construction and Commissioning of the following Facilities:
Crude Oil Trains 3, 4 and 5 and its associated facilities;
Garraf River Water Intake System Upgrade.

Senior Mechanical Engineer à China Petroleum engineering and construction corporation
  • Irak - Bassorah
  • janvier 2019 à mai 2020

EPCC, Engineering, Procurement, Construction and Commissioning of the following Facilities:
Crude Oil Trains 3, 4 and 5 and its associated facilities including oil processing system, chemical injection system, oil storage system, oil metering and export system, close & open drain system and LP & ATM flare system etc.
Garraf River Water Intake System Upgrade including the new two sets of river water treatment system and the 14’’ 8 km HDPE water pipe line from WIS to GIFT.

Senior Mechanical Engineer à China Petroleum engineering and construction corporation
  • Iran - Ahvaz
  • octobre 2013 à décembre 2018

EPCC the contract for engineering, Procurement, Construction, Commissioning. The North Azadegan Oil field surface facilities Development Project with a refining capacity of 75000 barrels per day.
The North Azadegan Oil field surface facilities Development Project, covers
Field surface facilities: Total of 58 N0s new wells, 02 water injection pipelines, Gas Lift artificial method, Construct of Oil gathering flow lines, 07 Oil gathering manifolds (OGMs), 18’’& 16’’ trunk lines. Equipment’s: Close Drain Drum, Test Separator, Chemical injection skid, Pig launcher, Vent pipe/flame arrestor etc.
Export Pipe lines: 85 KM 16’’ Oil export Pipe line and 120 KM 12’’ Gas export Pipe line The scope also includes EPCC work for Valve Stations, Metering Systems, Launcher and Receiver Stations, Fiber Optical Cables, as well as road, Canal and rail crossings and installation of Trap stations.
Central process facilities: Oil storage and Transportation area, Oil Treatment & Heat medium area, Gas processing area, Produced Water Treatment area, Service building & firefighting area, Flare stack area, Electrical Power Plant and piping.
Storage Tanks: The design, fabrication, installation, erection, testing, commissioning of welded steel above ground storage tanks (09 N0s) and meet the requirement of API 650.
Gas Turbine Power Plant
Installation of Gas Turbine driven power plant (48.8 MW) related equipment’s & accessories.

Construction Manager à R.H Al-Marri & Sons
  • Arabie Saoudite - Yanbu
  • septembre 2012 à juillet 2013

Project Summary: The Yanbu Export refinery project is the development and installation of new Grass roots refinery. The situation is also exacerbated in that other lines: 18’’ ethane, 16’’ &6’’ Butane, 30’’ lateral, 8’’ flare pipelines, utility pipelines and installation of new scraper 26’’, 18’’& 6’’

Site Manager à Peoples steel Mills Ltd
  • Pakistan - Karachi
  • septembre 2011 à septembre 2012

Project Summary
Construction, Installation/ erection, testing and mechanically complete all the civil, Mechanical, Electrical and Instrumentation works and provide Pre-commissioning and Commissioning Assistance for installation of(02) N0s of Reciprocating Compressors . Dismantling the (01) N0 Turbo compressor.

Deputy Manager Mechanical à China Petroleum engineering & construction corporation
  • Pakistan - Karachi
  • février 2007 à août 2011

Pakistan petroleum limited (PPL) intends to provide Gas compression project facil¬ity and all utilities under Kandhkot well Gas compression project. Compressed Gas from new facility will be delivered to existing Dehydration units in Dehydration plant; Gas compression facility will provide:
Process facilities: Gas Turbine Driven centrifugal compression trains and the utility system such as instrument, nitrogen, power generation, fire water System, service water, Potable water, Flare system, Inert Gas Package, Water Treat¬ment Package, Corrosion Inhibitor Package, compressed Air Package, Vessels, station Piping, Hydro static testing.
Storage Tanks: The design, fabrication, installation, erection, testing, commissioning of welded steel above ground storage tanks and allied facilities to meet the requirement of API 650

Mechanical Project Engineer à R.H Al-Marri & Sons company
  • Arabie Saoudite - AlAhsa
  • décembre 2005 à décembre 2006

PIPE LINE PROJECTS DEPARTMENT
Oil & Gas upstream projects (Saudi ARAMCO)
Udhailiya Oil Field, Abqaiq Oil Field, Shed gum Oil Field, Harad Oil Field
Scope of work identifies the work required to construct several Crude oil Flow lines, well head Piping, Trunk lines & Test lines, various Manifolds, operating platforms, Tie-ins in Oil & GAS Separation Plants. Perform installation of all phases of flow-lines, trunk lines, test lines and any other pipelines as directed by Saudi Aramco Onshore Oil Fields in the (Haradh Oil Field, Abqaiq Oil Field, and Shadgum Oil Field &Udhailya Oil Field). Perform installation of Supervisory Control and Data Acquisition (SCADA/RTU),

Mechanical Project Engineer à Techno Engineering
  • Pakistan - Karachi
  • mars 2002 à décembre 2005

PROJECT DESCRIPTION
Cross country White oil pipe line (WOPP) Project 817-km Port Qasim to Mahmoodkot.
Fabrication, Erection, Installation of piping & Structure in oil Pumping & Terminal Stations.

25KM 26’’dia bidirectional pipeline connecting PARCO Korangi PS-1 Pumping station with PARCO WOTS-1 Port Qasim pumping& Terminal station.
Project NO: 2 WHITE OIL PIPE LINE PROJECT (WOPP)

Pipe line Engineer à CPECC & TECHNO CONSORTIUM
  • Pakistan - Karachi
  • mars 2002 à décembre 2005

PROJECT DESCRIPTION
25KM 26’’dia bidirectional pipeline connecting PARCO Korangi PS-1 Pumping station with PARCO WOTS-1 Port Qasim pumping& Terminal station.
Project NO: 2 WHITE OIL PIPE LINE PROJECT (WOPP)
Cross country White oil pipe line (WOPP) Project 817-km Port Qasim to Mahmoodkot.
Fabrication, Erection, Installation of piping & Structure in oil Pumping & Terminal Stations

Asstt Shift Engineer à 150 MW FBC Power station Lakhra
  • Pakistan
  • janvier 1996 à décembre 2001

Overall, 5 years’ experience of coal & combined cycle Power plant (operation and maintenance)
Responsible for operation, maintenance and repair of plant equipment & auxiliary system.
Supervising the welding & erection of circulating water (CW)& intake line Indus River Pipeline
Daily Calculation Sheet

Éducation

Baccalauréat, Mechanical Engineering
  • à Mehran University Of Engineering And Technology Jamshoro
  • septembre 2002
Master, Business And Economics
  • à University Of Sindh
  • septembre 1998
Diplôme, Electrical And Mechanical Engineering
  • à Sindh board of Technical Education
  • février 1992

Specialties & Skills

Equipments
Pipelines
Commissioning
MS Word, Excel

Langues

Anglais
Expert

Adhésions

Pakistan Engineering Council
  • Engineering council
  • December 2002

Formation et Diplômes

Risk Management Professional (PMI-RMP) (Certificat)
Date de la formation:
February 2024
Valide jusqu'à:
February 2027
IOSH (Certificat)
Date de la formation:
July 2009
Valide jusqu'à:
February 2022
LEAN SIX SIGMA GREEN BELT (LSGBB) (Formation)
Institut de formation:
Pakistan institute of Management
ISO 9001-2015(QMS)Lead Auditor (Certificat)
Date de la formation:
December 2022
Valide jusqu'à:
January 2040
Project Management Professional(PMP) (Certificat)
Date de la formation:
May 2022
Valide jusqu'à:
May 2025

Loisirs

  • Reading english novels, newspapers