Construction team leader
GAMA construction
Total years of experience :16 years, 4 Months
Create an inspiring team environment with an open communication culture
Delegating work to team members
Working to budgets and managing team finances efficiently
Briefing your team on targets and providing business updates
Monitoring team performance and carrying out appraisals
Ensuring work is completed on time, to a high standard and in line with health and safety guidelines
Listen to team members’ feedback and resolve any issues or conflicts Showing new and inexperienced construction workers how to do the job
Ensuring workers follow company policy and procedures Checking and internal audit of work
Working with technical drawings and plans.
Planning and coordinating site daily different works (civil, architecture and electro-mechanic).
Managing site resources to achieve project goals (quality, cost, time).
Quantity Surveying works.
Page 3 of 5
Conduct on -site investigations and analyse data (maps, reports, tests, drawings and other).
Assess potential risks, materials and costs.
Provide advice and resolve creatively any emerging problems /deficiencies.
Handle over the resulting structures and services for use.
Monitor progress and compile reports in project status.
Comply with guidelines and regulations including permits, safety etc. and deliver technical files and other technical documentation as required
Complete Building from Foundation to complete Finishing works
Contains Activities
- All concrete works, Finishing works
- Firefighting, Fire alarm, Fire safety systems, Ventilation works
-Main electrical works (substation, mv panels, generator
, inside studios electrical works etc…), Elevators
- Aluminum works ( windows, panels ), G R C for Interfaces
-Epoxy works for car parking floors
-Isolation works for water tank, wet areas, Roof
Main contractor
BENAA FOR Real Estate DEVELOPMENT
Complete factory all industrial works Silos, Preheater
&crasher & lime stone storage & substations, Cooler, tunnels, landscape, roads, and etc.
Using systems like (slip form system & post tension cables for Silos & using scaffolding design on heavy works & ready mix concrete.
Applied industrial safety in all the phases of the project
Complete factory all industrial works silos, Preheater
&crasher & lime stone storage & substations and etc.
Using systems like (slip form system & post tension cables for Silos & using scaffolding design on heavy works &ready mix concrete.
Applied industrial safety in all the phases of the project
670 villas ( concrete and finishing ) contain swimming pools, lakes, roads, landscaping, stone bridges, water tank, irrigation tank
Building a factory to produce milk products and have all civil works \[production building -boiler - (water - gas and treatment tanks\]
And have terms:
Post tension concrete and high finishing works
-floors (ceramic-granite…etc.)
-doors (France metal - Hormann -Delta )
- False celling.
-Roads (R c slabs - interlock )
-Ready mix concrete (with fiber steel and with fiber glass)
-central air conditioning and firefighting works
-Exterior paints (saveto …etc)
-Interior paints ( acrylic )
- Epoxy paints for (walls and floors )
-Isolation against (sound -water -heat) for roofs and tanks
-Make lines of feeding and drainage and test this lines
Complete factory all industrial works silos & packing and etc. Using systems like (slip form system & Pre-stress cables for Silos & using scaffolding design on heavy works &ready mix concrete
Scope of work is concrete works.
Building 14 Floors (Concrete) (raft -2 basements and 4 floors).
Use slipfom techniques to achieve Silos works (formwork, steel reinforcement, embedded parts, openings, post tension cables, and concreting and finishing).
32 Floors with plan runway (concretes), swimming pool, steel form works (acrow misr scaffolding systems), automatic car parking system and placing concrete using stationary pump.
High rise building 12 floor (concrete works, finishing works).
Excavation works, steel reinforcement works, RC concrete work, parking cars steel structures
Every Unit 5 Floors (Concrete works, finishing works).