Electrical Engineer
Hill International
مجموع سنوات الخبرة :4 years, 1 أشهر
Riyadh Metro Package 3 (RAMPED) JV \[WSP, Hill International\] PMCM - Riyadh Advanced Metro Project Execution & Development
Electrical Quality Engineer and Testing and Commissioning Engineer
• Electrical activities for (6H2 station and Park & Ride PR6.2), a tunnel (6.4), an emergency exit shaft.
• Inspected and tested various systems such as LV, fire alarm, BMS, and ICT
• Inspected and tested LV systems such as MDBs, SMDBs, PDPs, UPSs, CBSs, diesel generators, and LCSs
Worked in three stages: construction, testing and commissioning, and handover.
• Construction, supervised the contractor, ensured work was executed according to project specifications, and issued non-conformance reports (NCRs) if necessary.
• submitted weekly progress reports to manager for Site HSE status.
• Testing and commissioning: I performed site acceptance tests (SATs) to verify the functional and performance requirements of the installed systems, ensured all installations were completed according to project requirements and that all documentation was approved, including the installation acceptance test (IAT), installation release note (IRN), test readiness review (TRR)
• Handover, ensured all documentation was completed and closed, including the electrical design (ED), (SDR), (MAR) materials approval request (MIR), materials inspection (IR), IAT, and Test Witness Authorization (TWA)
• The handover process ensured contractor completed & closed all snagging items on site.
As an Electrical Engineer working on the SEDRA Phase of the ROSHN Project:
• Reviewed and processed all electrical material submittals to ensure compliance with project specifications and standards.
• Checked electrical load calculations to confirm that they were sufficient and met project requirements.
• Inspected electrical works at the site to ensure compliance with specifications, standards, and codes.
• Prepared Document Reports such as Material Inspection Reports (MIR), Work Inspection Reports (WIR), Non-Conformance Reports (NCR), and others as necessary.
• Collaborated with the project team to resolve issues and ensure adherence to project schedules.
• Conducted testing and commissioning of electrical systems to ensure functionality and reliability.
• Monitored and tracked electrical equipment and material delivery to ensure timely delivery and availability.
• Provided technical support and guidance to the project team and contractors as needed.
Working in Riyadh Township Project
• Daily Checklist
• Weekly Risk Assessment
• Daily Observation Reports (PIC)
Training Overview:
• Principles of household electrical wiring
• Load distribution
• Electrical constructions
Training Overview:
• Writing EE technical reports.
• Installing the underground cable.
• Workshop in electric power connectors.
• Training in electrical and instrumentation E&I-Jazan Refinery and Terminal Project
• Learning HSSE measures.
• Knowledge of the conduct of administrative work.
Graduation Project: Design and Implementation of an Advanced Smart Home Automation System Based on Renewable Energy