THE OXFORD PARTNERSHIP LLC
Total years of experience :12 years, 11 Months
Intarnational female technical college
Madenah)
Designation : Facilities Support (CHILLERS, AHUS, PACKAGE SUBSTATION
MAINTENACE OPRATION.
MARSHLING CABENATS INTEGRATION
FOR ARAMCO (DAMMAM STAGING)
PLC INTEGRATION FOR RABIGH POWER
PLANT & ARABIAN CEMENT FACTORY.
(DELMA, DAQING, SINOPEC) (OXYGEN & BREATHING OPPRATUSINSTALLATION AND HIGH PRESSURE TEST AT RIG.
CHROMATOGRAPH demolition & installation.
•DCS Cabinet Cutover (Installation, Termination, Glanding, Cable pulling, Testing )
•Assign job tasks and work as per electrical and instrument project schedules.
•Console installation and commissioning
•Analyser gc installation and sample system and tubing installation
•Review all electrical & Instrument drawings with Supervising performing on assigned jobs to them.
•Stimulate fabric standards to ensure quality work attained from assigned staff.
•Recommend effective solutions specified particular weight related to employment status of employees.
•Schedule, assign, plan and supervise electrical shop personnel performance on different E&I projects.
•Plan and prepare work and equipment usage schedules.
•Develop electrical expenditures priority and equipment and appliance maintenance procedures.
•motor operating valve assembly, installation trouble shooting.
•Provide information on modification on work policies, safety regulations, electrical codes and specifications.
•CHILLERS & AHUs, ACB MAINTENANCE AND OPRATIONs.
•Support Electrical and instrument Engineers in design needs.
•Review of Project specification and P&ID.
•Coordinate with calibration and testing of all types of pressure, flow, level and temperature transmitters, gauge, control values loop checking and commissioning
•Having better knowledge to read and understand single line diagrams, schematic diagram, P&ID, ILD and logic diagram
•Planning daily activities and resources.
•To prevent breakdowns and to ensure quality of jobs carried out.
•Perform annual shut down activities of smelter.
•Co-Ordination with vendor/contractors to resolve quality and construction issues.
•Review of instrument specification sheet (ISS), instrument Data sheet (IDS), Instrument installation sheet (IIS)
• Responsible electrical and instrument cable megger and Hi-pot test
•Tracking and recording of RFI and work progress on site.
•Responsible to see that the assigned job is timely completed as per the project schedule.
•Responsible to verify the installation of the instruments by performing inspection as per the inspection and test plan (ITP) and record the findings on the Quality record (QR).
•Carryout the surveillance inspections of wiring termination and checking that all the tags termination penal integration instalition tarmiantion glnding wiring modification as per the schedule
•Carryout the pressure testing/service testing of the process.
• Carryout inspection of the material when it arrives in the warehouse to ensure its conformity to the project specification and purchase order.
•Tracking and recording of Request for inspection (RFI) and work progress on site, Responsible for the clearance of Mechanical Completion Check Records (MCCR).
•Attend quality and progress meetings with contractors to resolve construction/quality issues. Co-ordination with commissioning and construction personnel for mechanical completion and work.
•Establishing the safety work environment for erection and instrument activities,
•Performing Testing and Installation inspections of all electrical and instrument equipment and evaluation as per