Abdul Malik Darsan, IT Telecom Consultant

Abdul Malik Darsan

IT Telecom Consultant

Faruq Salman Consultant

Location
Indonesia
Education
Bachelor's degree, Telecom engineering
Experience
28 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :28 years, 3 Months

IT Telecom Consultant at Faruq Salman Consultant
  • Indonesia
  • My current job since August 2016

- Commissioning VSAT, Radio Base Station, Microwave and all aspct telecom IT
network, PA/GA, IP Phone, Hot line Phone, Digital Trunke Radio System, CCTV,
Access Control, Fence Intrution System Security
- FAT and SAT system with operator and coordinate with vendor,

Telecom Commissioning Engineer Supervisor at Brunel Energi-Tripatra Samsung-Exxon Mobil Oil
  • Indonesia
  • May 2015 to July 2016

Telecommunications System:
Supervise 100 technicians and contractors to do the work of commissioning of IT devices,
security and telecommunications with reference to the aspects of safety and health standards
compliant oil and gas industry
Analyze and propose methods of work safety and work permits for all the work
Telecommunications IT, Security that consist 1000 work items throughout the area of oil
drilling Exxon Mobil Cepu, Indonesia
precommissioning and commissioning completed the first hop microwave link valve
stations coast to FSO
precommissioning and commissioning completed the second hop VSAT, consisting of
fixed VSAT station onshore and one offshore Stabilized VSAT
Completing precommissioning and commissioning 1 Inmarsat radio communication
system on a hub
Completing precommissioning and commissioning of three stations Inmarsat remains in
onshore consisting of supervisors radio room, administration rooms and a helicopter
landing field
precommissioning and commissioning completed Digital Trunked Radio System (DTRS),
Data Control NMS systems, radio systems, mobile radio systems on vehicles of more
than 250 radio hand
Complete 3 VHF marine radio stations, 2 in onshore, Banyuurip Cepu, one at the port of
departure to offshore
Completing precommissioning and commissioning radio High Frequency Single Side
Band (SSB) 2 stations in one station in the Onshore and offshore,
Completing precommissioning and commissioning radio very high requency Amplitude
Modulation 2 stations 1 station in onshore and offshore
Completing precommissioning and commissioning 1 radio NDB in building onshore
aviation,
Completing precommissioning and commissioning of AWOS at Radio Central Control
Room
Precommissioning and commissioning of 60 VOIP handset,
Precommissioning and commissioning Business Network LAN as many as 60 panels,
Precommissioning and commissioning Shittim fiber optic cable network in all areas of
utility, process and oil wells,
Precommissioning and commissioning hotline in all areas of utility, process, valve, and a
second offshore oil wells,
Security System:
Precommissioning completing and commissioning the system CCTV network throughout
the area of 600 hectares of oil well location, which is divided into two areas of oil wells B
and C, consisting of 600 CCTV of 10 division loop circuit, divided into two types of CCTV,
the indoor and outdoor,
Completing precommissioning and commissioning systems perimeter security fence
along the 600 hectares, both in a server at the central controller, and on each hole the
meeting on some loop of optical fiber,
Completing precommissioning and commissioning PA / GA PAEAS Gaitronic indoor and
outdoor 600 units and 1 master station in the control room SCADA
Access Control System, precommissioning and commissioning over 200 gates in the area
of utility, process and oil wells B and C,
Precommissioning and commissioning carpark barrier main entrance door and the rear
door area oil wells.

IT Telecom Consultant at Invesnsys Process System ( Schenider )
  • Indonesia
  • January 2011 to December 2015

Analyze, Produce, and create methods of work safety and work permits PTW for all
the work Telecommunications IT, and Security work scoupe around all area gas
production, lead team consist of contractor to finishing the telecom and IT,
- Perform precommissioning and commissioning VSAT Radio SCPC 8 station in Gas
office station at Banten, Jakarta and West Java contains 150 VSAT IP Phone around
areas of customer, 2 hop radio microwave station, perform and commissioning
tower quality since pondation to erection the tower till acceptance,

Services Engineer-Coordinator at Ericsson Indonesia
  • Indonesia
  • January 2005 to December 2009

Roll Out Network Div. Radio and Access Network Integration Dept.
Radio Base Station Engineer/Service Engineer-Experience
- ITC Coordinator Batam Bintan and Riau Island for tinem Telkomsel ( March 2005-Oct 2005 )
• Ensure installation testing commissioning MW Minilink E and Minilink TN Hicap and RBS installed match with schedule under coordination with subcontractor
-ITC Coordinator Aceh for tinem telkomsel ( Nov 2005 - Feb 2009 )
• Ensure installation testing commissioning MW Minilink E and Minilink TN Hicap and RBS installed match with schedule under coordination with subcontractor
-ITC Coordinator NTS Axis West Sumatera ( march 2009- June 2009 )
• Ensure installation testing commissioning MW Minilink E and Minilink TN Hicap and RBS installed match with schedule under coordination with subcontractor
-ITC Coordinator NTS Axis North Sumatera ( June 2009-Oct 2009 )
• Ensure installation testing commissioning MW Minilink E and Minilink TN Hicap and RBS installed match with schedule under coordination with subcontractor
- RBS Service Engineer in Jabotabek and East Java 3G Project ( Oct 2009 - Dec 2009 )
• - Implementation new feature Telkomsel product services like Dual Stack with speed data 21 Mbps in Jabotabek,
• Implementation new feature Telkomsel East Java services like Second carrier with speed data 14.4 Mbps and 21 Mbps,
• Supervise Installation, Testing and Commissioning RBS 2106, 2111, 2116, 2206, 2206 v2, 2207, 2216, 2308 & 3206, 3116, 3412, 3418, 6102V2, 6201V2 (2G&3G)
• Commissioning for configuration 3x8 and 3x12 with TG synch between 2206 - 2106, 2206 - 2216, 2206 - 2116, 2206v2 - 2216, 2206v2 - 2116, 2106 - 2106.
• Upgrade RAX, RU, HS-TX 60, and RRU
• Installation of RBS ERICSSON (1800 &900 MHz)
Configuration of RBS & Microwave (Minilink).
• Testing of VSWR of Feeder cables By using Site Master
• Installation of Microwave ERICSSON( ADM & PDH System) (Minilink)

Roll Out Manager at Alandick Indonesia
  • Indonesia
  • October 2003 to December 2004

Responsibility:
• To manage daily activity about installation, testing and commissioning Nokia radio and integration around East Java Area,
• Cost control operational budget for all the team activity,
• Lead the team ti achieve client target for on air of BTS
• Coordinate with all engineer at site on integration time to all site that include
in target, make sure all network ready at site, like electric, BTS( Base Transceiver System ) ok, transmission ok, and coordinate also with
BSC/OMC( Base System Circuit /Outside Maintenance Centre ) personnel to
activate the BTS and raising the coverage,
• Coordinate between Indosat and Nokia to delivery timeschedule the installation and integration all sites in east Java Indosat,
• Interface between Project Management team Jakarta and East Java to calculate all resources needed for purpose accelerate the project,
• As Human Resources Regional to identification performance all team member,
-Meet Ericsson Project Jakarta-Bogor-Tangerang-Bekasi-Depok Indosat Inner and Outer testing, commissioning, verification and acceptance test with Indosat, conered BTS 2202, 2206, Mini-Link-E classic
-Prepare and complete C-Module,
-Upgrade and down grade TRU RBS 2202 and 2206 in Batam Island,
-With team to prepare trial 3G WCDMA CAC project, transmission with link from Ericsson office to plan New RNC and MSC at Wisma barito Pacific

June-November 2004

Team member at Ericsson Indosat Jabotabek and Batam-Bintan Project, as Supervisor Field / RBS Engineer

• Supervise all subcontractor activity at site, the supervise covered
installation of antenna sector, installation of microwave mini link, coaxial
and feeder installation, power and secure installation, RBS installation and
make sure meet the VSWR, and no alarm arise,

• Testing and commissioning RBS, re-engineering radio of minilink
Ericsson product at Batam Riau Island to meet the Telkomsel Tinem-2
Project that include in Sumbagut area,

Coordinator Engineeering at Swatama Mega Teknik
  • Indonesia
  • January 2000 to August 2003

- Installation, testing and commissioning radio microwave MELODIE
Alcatel,
- Testing and commissioning Base Transceiver System Alcatel product,
- Acceptance the radio with operator related, such as Satelindo, Excelcomindo
on behalf as Alcatel institution,
- Meeting with operator and Alcatel to match all operator needed before
execute the installation, the parameter that must be match are power require,
standard of installation, power electric secure,
• To brief all team member between technician and engineer to meet delivery customer needed as schedule,

Engineer Support at CSM Satellite and network services
  • Indonesia
  • January 1995 to October 2000

- support technician in activity install, testing VSAT SCPC, kinds of activity
such: x-poll, link budget
- Create, edit, analyze topology network at customer site, such protocol life,
likely : X.25 protocol, SDLC protocol, Frame relay protocol, TCP/IP
protocol, packet size, windows size
- Monitoring alarm system switching, packet switching that operate for TDMA
network around the customer network,
- Support customer to solve their network daily operation, like Bit Error Rate
Test at network,
- Give solution to customer what their needed in network, and consult it with
customer, like windows size, IP address, node, network topology, link
budget for the link,
- Close all problem of customer with CPR “customer problem report” after
•Installing and commissioning of V-SAT Earth station

•Site survey for the V-SAT location and Wireless link through using of GPS.

•Coordination with different earth station for maintenance and establishment of new V-SAT circuit

•Testing of equipment for the new and existing V-SAT sites

•Handles different VSAT equipment and testing the whole network for VOIP and data connection including Cisco equipment
Installation of 1.2M, 1.8M (Patriot Offset) 2.4& 3.7M (Ruman centre feed) 3.7 (Patriot centre feed ) Satellite Dish Antenna. 9 Dbi, 16 Dbi, 32 Dbi R.F antennas for wireless link.
Installation of Modem (Comtech 625 L-band -570) BUC (Mitec, Alga, Codan, Upcomm) OMT, Reflector, Feed Horn, LNB.
Configuration of Modems & Tran receiver (Comtech) .
Perform Uplink & Downlink of Frequency. And pointing of satellite Antenna and R.F antenna for wireless link.
Termination of TX & Rx cables
Azimuth and Elevation selection
Perform Preventive Maintenance (PM) and Casual Maintenance (CM) of all Equipements.
Perform point to point connectivity and point to multi point in wireless links.
Planning of wireless links.
To move the teams on site.

Education

Bachelor's degree, Telecom engineering
  • at university of indonesia
  • August 2000

Specialties & Skills

WIRELESS ENGINEERING
Microwave Systems
satellite vsat, microwave, Radio base station, Data communication, Management,

Languages

English
Expert

Memberships

Indonesia Engineer Association
  • as a member in telecom engineering
  • August 2000

Training and Certifications

certificate (Certificate)
Date Attended:
July 2007
Valid Until:
July 2007
Certificate (Certificate)
Date Attended:
March 1995
Valid Until:
March 1995
Certificate (Certificate)
Date Attended:
June 1996
Valid Until:
June 1996
Certificate (Certificate)
Date Attended:
May 2005
Valid Until:
May 2005
certificate (Certificate)
Date Attended:
May 2005
Valid Until:
May 2005