Account Manager
Saudi Telecom Company
Total years of experience :15 years, 10 Months
Business development.
study new real estate project to added to STC network and provide consultancy for smart building solution to add value to project
marketing STC new business module to get complete building solution include green building
Summery
Management, control, coordinate, generate and develop new ideas, propose and develop optimum working methods with effective utilization of business structure resources, ensuring the quality and time of deliverable
- Project planning and framing
- Review statement of work and confirm scope of work
- Ensure all project deliverable are completed in time and within budget
- Lead and motivate working team within different structure and culture
- Ensure customer satisfaction and meet expectations
- Facilitate the use of project management best practice to drive project
- Proven experience in managing multiple projects in same time
- Quality assurance for deliverable at each stage of project cycle
- Establish and develop communication channels with project parties and stakeholders
- Evaluate risks and mange changes to adopt with internal and environmental variables
- Ability to initiate new working methods and structure to meet with Project/Market demands
- Friendly personality with flexibility to work with different working environments and multiple cultures
-coordinating between department to deliver the project on time
-prepare daily report and weekly presentation to high management
-Support team to install some of test sites
-Training companies for new system
-Support contractor to solve all problem in site -
-Troubleshooting the problem in all telecom work
Project Coordinator (Jan 2010 - Des2011)
Seoul Commtech Company Limited (member of SAMSUNG) (KSA-Riyadh)
STC (SAMSUNG) 4G project.
Mobily (SAMSUNG) WIMAX wave2 replacement to LTE project.
Mobily (SAMSUNG) WIMAX (LTE+1) project.
Mobily (SAMSUNG) WIMAX wave1 replacement towave2 project.
Mobily (SAMSUNG) WIMAX wave2 project.
• Coordinate and management all project progress (whole area)
• Supports and follow up in survey activity
• Make installation plane
• Make daily update report
• Training companies for new system
• Support contractor to solve all problem in site
• Troubleshooting the problem in all telecom work
Microwave Engineer (Aug 2009 - Des 2009)
Seoul Commtech Company Limited (member of SAMSUNG) (KSA-Riyadh)
Mobily (SAMSUNG) WIMAX wave2 project
• Management all MW installation progress from starting installation until link on air (whole area)
• Solving installation problem
• Work on troubleshooting to solve technical issue (NERA equipment)
• Give some solution for design
Telecom Engineer (Jul 2008 - Jul 2009)
Silicon city (KSA-Riyadh)
Mobily 3G second carrier project (nokiaseimensnetworks)
• Operate & Repair BTS & Node B if it is completely or partly down • Tracing E1 cables & repair or change it, And redistribute it by software for BTS & Node B
• Update BTS & Node B software completely or partly
• Configure new BTS & Node B or reconfigure it to repair errors.
• Clearing all alarms for BTS & Node B &Flexi Hybrid & FIU/19"
• Troubleshooting MHA problems by hardware & reconfigure it by software for Node B
• Change any module when it be poor performance or faulty in BTS & Node B &Flexi Hybrid & FIU/19"
• Reconfigure Flexi Hybrid & FIU/19"
• Troubleshooting down links completely & repair it by hardware & software
• Check Ethernet settings and modify it for FIU/19"
• Check cross connection and Redistribution for Flexi Hybrid & FIU/19"..
Master of business Administration in International Management
Misr university for science and technology (B.Sc.) Electronic and Communication Engineer (2008/2009) • Graduation project: Minimizing interference in line of sight microwave link. Grade (A) • Rating is Good
Certificate of General Secondary Education/Scientific Stream (2002/2003)