Project Engineer
GUPCO Petroleum Co.
Total years of experience :17 years, 2 Months
* Senior Facilities Engineer : BP Egypt - JV (- Ras/Shukeir Facilities Engineering Team)
Offshore: 9 Complex Platforms and more than 75 Satellite platforms.
Onshore: 3 oil/gas treatment process facilities. The current production 400 MBFPD with 78% BS&W and 500 MMSCFD
Skill Profile
•Oil & gas engineering experience (Fully conversant with relevant international standards.
•Experience with Company and/or Shell Group projects and conversant with international codes such as ASME B31.3, ASTM, API 6A and standards (SPs / ERDs and DEPs).
•Experience in hydraulic analysis (static modelling), piping isometrics, piping design / draught software
•Hands on experience on AutoCAD, PDS working Knowledge, Finite Element Analysis(FEA) Software such as CAESAR II, CAEPIPE
Activities & Responsibilities:
Provides technical advice and consultancy on aspects for the facilities (Pipe work - Pipelines Separators Control valves Safety Relief valves - Pumps - heat exchangers - Choke valves Orifices -…etc. for being used for the following facilities and systems
1-Off shore/On shore facilities (Gas/Oil/Water)
2- Fire fighting systems
3-Water Treatment units, Water Flood stations ...etc
Develop and elaborates the Statement of Requirements (SOR) for consultants And/or engineering contractors for new projects/modifications in Collaboration with operators/sponsors
Participate in risk, safety, health and environmental related studies (HAZOP) and reviews with consultants to ensure that the engineering aspects of all Temporary and permanent modifications are risk assessed and managed.
Develop sound recommendations for on hand operation problems according To the international standards. (API - ASME- ANSI - BP -...etc.)
Sep 2011- Present PIPING ENGINEER - Worley Parsons, Cairo Part time
Project - Basic & Detailed Design And Engineering Of A New 150, 000 Bbl Oil Storage Tank Proposal- Petrogulf Company) - Egypt.
The responsibility is to develop the followings:
• The required piping man-hours to achieve the basic design and detailed design of the Piping network required to connect the new 150, 000 Bbl Oil storage tank to the existing storage facilities piping network
• Equipment Layout Plan (Unit Plot Plan)
• Piping Assembly Drawings Key Plan
• Piping routing studies and Stress analysis by Caesar ii 5.1
Project - Khalda Oil And Gas Company Proposal for Basic & Detailed Design for Propane tank Projects - Egypt
The responsibility is to develop the followings:
• The required piping man-hours to achieve the basic design and detailed design of the Piping
• Isometric drawing & bill of materials
• As - built drawings of existing piping.
• Piping material take off for estimation and purchasing
Design different parts of Compressors.
Checking the assembly of the Block and making the suitable stress analysis test
Diploma of Natural gas Processing(Cairo University) Contain: piping and pipeline transportation , Construction and storage tanks and pressure vessels ,drilling, The Drilling Rig, Junk Drill pipe Design, Down hole Drilling Equipment, Drilling Fluid, Casing and Cementing, Formation Evaluation, Normal Drilling Operations, Special Drilling Operations, Drilling Problems, Completions, New developments,Natural gas reservoirs, Gas Engineering Fundamentals, and Gas Production Petrochemical, Natural gas Utilization, Processing of Fractionation, Seperation and Purification, Instrumentation and Control, Measurements, Transportation&Storage. Petrochemical (industries of hydrogen , fertilizer (Urea),ammonia ,Ethylene oxide and vinyl choride,butadiene ,Polymers and its structure and properties of polymer .Industries of polymer like High density poly ethylene and Nylone 66, Gas to Liquid Technology Like Fisher –Tropsh method. E.g. Sasol, Shell, Syncrude, Exon and Syntroleum.
Pumps- Compressor-turbines-Vibration -Control-Fluid dynamics-Power Plants- Energy Balance- Material