Senior QA.QC Engineer
Keo International Consultants - Qatar
Total years of experience :21 years, 3 Months
Projects:
DN099-P05 - Roads & Infrastructure in Al Ebb and Leabaib.
DN004-P01 - Roads & Infrastructure in Al Kharaitiyat and Lzhgawa.
Duties and Responsibilities:
Ensure that processes needed for the Quality Management System are established, implemented and maintained.
Shall be responsible for overseeing the implantation and operation of the project quality plans at all levels. Conduct quality assurance audits on the Contractor’s operations in accordance with the Programme Management Consultant’s and Client’s requirements. Provide monthly update for quality performance and improvement on the project and an action plan for enhancement. Keep track of the quality performance KPI and alert the project management on gaps and related corrections. Conduct training for the contractor’s staff and measure the effectiveness and efficiency of the training output. Manage preparation and implementation of Quality Control supervision construction manual Requirements and implementing procedures. Coordinate with the project team on the review process of submittals and the minimum quality requirements as per project specs and international standards.
Arrange for and chair quality related meetings with Contractors, Subcontractors and Material Suppliers to define the action required for follow-up and issue the meeting minutes. Conduct internal audits of the QMS elements at least once quarterly, and provide follow up on the implementation of the required corrections and corrective actions.
Conduct external audits on Contractor and sub-contractors and suppliers on a quarterly basis and provide the proposed schedule as per QCS and project specification requirements.
Responsible for verifying the efficiency of the root cause and the corrective actions taken. Assessing and reporting on identified trends generated by audit findings and non-compliant reports and provide required workshops for improvements. Enforce initiating and sharing of lessons learned. Overlook the project handing over process.
QMS Audit for the Ashghal (Public Works Authority) Consultants and Contractors.
Departments
Express Highway Project Department (HPD).
Local Roads Project Department (RPD).
Drainage Project Department (DPD).
Building Project Department (BPD).
Beautification Department (BUD).
Duties:
Performing QMS Audit based on QCS 2014. Preparation and submissions of Non - Conformity Reports, Preparation of QMS Checklists and Audit Reports for each Audit Activity, Review of NCR’s Proposals, Root Cause Analysis, Corrections, Corrective Actions and Preventive Actions.
Audit Skills - QMS Evaluation Parameters:
Contractors: Project Quality Plan. Quality Organization Plan. Contractor’s Quality Personnel. Staff Trainings. Inspection and Test Plans. Quality Checklist. Key Performance Indicators. Document, Data Control & Quality Records. Quality Audits. Non-Conformance Monitoring. Measuring and Test Equipment. Site Meeting & records. Project Meetings. Submittal & Shop Drawings.
Consultants: Quality Responsibilities and Duties. Quality System Documentation. Inspection and Test Plan’s (ITP). Technical Procedures, Work Instruction and Method Statements. Mentoring by Supervision Consultants. Review of Contractor Quality Documentation. Inspection responsibilities. Interfacing. Punch List (Snag List). Protection of the Works. Quality Records.
Project:
• Construction & Upgrading Fire Life Safety Installation and CCTV Security Surveillance System Installation & Commissioning for Al Wakra Hospital.
Client: Hamad Medical Corporation.
Duties and Responsibilities:
Preparation of all required Quality Documents and Procedures, Monitoring all QC related records, Preparation of all existing condition (Hospital Machineries, Equipment’s & Devices) reports and submitting to the client / end user (Al Wakra Hospital - HMC / AWH) approval before start of work, Arranging Take over inspections and Hand over inspections for each phases / zone along with Hospital Top Management, Witnessing the Authority (Qatar Civil Defense Department- QCDD) inspections and submission of Handover Documents to Consultant and End-User for Final Approval
• Doha Port Project, Doha.
Doha Port Re-Development Project (DPP)
Client: Supreme Committee.
• Hamad Port Project, Mesaieed.
Port Access Road Project.
Client: Hamad Port Authority.
• Marina District East, South and North
Promenades Public Realm Development,
• Lusail Development Construction Package -
CP10-B5
Client: LREDC.
• New Doha International Airport Project, CP-67
Street Lighting Installation and Landscaping
Upgrade
Client: Hamad International Airport Steering
Committee.
Projects:
• Medina Centrale - Pearl Qatar.
• Entry Court and Landmark - Pearl Qatar.
• Sidra Medical & Research Center.
• Intercontinental Hotel.
• Hilton Hotel.
Projects: Phase -1: New Doha International Airport (NDIA): Air Traffic Control and MET (ATC & MET) Meteorological Specific Equipment (CP35).
.
Scope: Design, construction, installation, testing and commissioning of all elements of ATC & MET Specific Equipment (ILS, Radars, Backbone, Communication systems, etc.). Civil and structural works such as included 17 Airfield shelters, 30 steel towers (max. height 45m), and underground duct bank-manhole system linking all the facilities spread over the NDIA site (2, 200 ha). Electrical-Mechanical works such as Control rooms, installation, testing and commissioning antennas, transformers, generators, power/ signal cabling and earthing systems, air conditioning, fire alarm & lighting systems.
Projects: Yanbu National Petrochemical Company, Olefins Plant Project, Ethylene and Propylene Plant, Yanbu.
Saudi Aramco Projects:- QA.QC Engineer
1. Fiber Optic Cable Installation, Rastanura to Riyadh. K.S.A
2. Mosque Building Project in Rastanura Terminal South, K.S.A
MEP Projects:- Testing and Commissioning Engineer.
1. Project: Arabian Pipes Company Saw Pipe Mill Project, Al Jubail. Saudi Arabia.
2. Project: Saudi Arabian Mining Co, Ma’aden Wet Phosphoric Acid Plant, Ra’s Az Zawr, Kingdom of Saudi Arabia
Scope: Construction of High-rise Buildings - 03 Zones - 60 rooms, new boutique in Guest area, Pizza Pavilion Extension, New Spa Sauna & Courtyard.
Position: Civil Engineer - Feb 1999 - Feb 2001
Project: Avinash Residential Complex
Scope: Construction of High-rise Buildings - 05 Blocks with Recreation club and Swimming Pool. L&T Avinash Apartment Apartments constructed with new standards for customer centricity, architectural design, quality, and safety.