الخبرة العملية

مجموع سنوات الخبرة :20 years, 10 أشهر

Senior Planning Engineer في AE7
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ يونيو 2013

Mohamed Bin Rashid City - District One; Dubai (Sep 2015 to Present)”
- Reviewed the baseline and recovery programs submitted by the contractors;
- Raised early warnings on timely manner to Project Manager;
- Advised Project Heads in timely manner on any lapses on planning & control aspects;
- Monitored the cost baseline and continuously kept tracking of the variances;
- Identified projects’ risk, impact analysis and response plan on regular basis,
- Evaluation of the listing and detailing of all MEP activities and coordinating with civil activities
- Coordinated the work program with procurement and design engineers.
- Formulated the Primavera information to simpler charts, graphs and drawings to facilitate communications with consultants/contractors;
- Reviewed contractors’ weekly and monthly reports, and highlighted discrepancies to Project Manager;

Maliha Hospital; Maliha (June 2013 to Aug 2015)”
- Reviewed the baseline and recovery programs submitted by the contractors;
- Raised early warnings on timely manner to Project Manager;
- Advised Project Heads in timely manner on any lapses on planning & control aspects;
- Monitored the cost baseline and continuously kept tracking of the variances;
- Identified projects’ risk, impact analysis and response plan on regular basis,
- Evaluation of the listing and detailing of all MEP activities and coordinating with civil activities
- Coordinated the work program with MEP engineers.
- Coordinated the work program with procurement and design engineers.
- Formulated the Primavera information to simpler charts, graphs and drawings to facilitate communications with consultants/contractors;
- Reviewed contractors’ weekly and monthly reports, and highlighted discrepancies to Project Manager;
- Evaluated time extension claims using cause and effect programs and issued necessary recommendations.

Senior Planning Engineer في Pearl Dubai FZ LLC – Dubai Pearl
  • الإمارات العربية المتحدة - دبي
  • أبريل 2010 إلى مايو 2013

- Prepared the Enterprise Project Structure (EPS) of the Project using Primavera 6 along with the Organizational Breakdown Structure (OBS);
- Monitored the progress of the project’s packages and generated reports representing the overall progress of the project, identifying critical areas lacking progress and implemented recovery plans to overcome delays;
- Evaluation and review of work breakdown structure (WBS) for the project packages;
- Evaluation and review of submitted baseline programs from engineers and contractors;
- Monitored the tracking status of submittals and approvals for drawings, materials & sub-contractors;
- Raised early warnings on timely manner to Project Director and upper managment;
- Conducted several presentations for the top management, elaborating the progress on site;
- Identified projects’ risk, impact analysis and response plan on regular basis,
- Formulated the Primavera information to simpler charts, graphs and drawings to facilitate communications with consultants/contractors;

Project Control System Engineer في Hill International – SAMA Tower
  • الإمارات العربية المتحدة - دبي
  • نوفمبر 2008 إلى مارس 2010

- Reviewed the baseline and recovery programs submitted by the contractors;
- Raised early warnings on timely manner to Project Director;
- Conducted several presentations for the top management and the client, elaborating the progress on site;
- Managed the weekly progress meetings with the main and subcontractors;
- Advised Project Heads in timely manner on any lapses on planning & control aspects;
- Monitored the cost baseline and continuously kept tracking of the variances;
- Developed monthly cash flow analysis;
- Identified projects’ risk, impact analysis and response plan on regular basis,
- Coordinated the work program with MEP engineers.
- Formulated the Primavera information to simpler charts, graphs and drawings to facilitate communications with consultants/contractors;
- Reviewed contractors’ weekly and monthly reports, and highlighted discrepancies to Project Director; and
- Evaluated time extension claims using cause and effect programs and issued necessary recommendations.

Prtoject Control System Engineer في Nakheel – Al Furjan
  • الإمارات العربية المتحدة - دبي
  • نوفمبر 2007 إلى نوفمبر 2008

- Prepared the Enterprise Project Structure (EPS) of the Project using Primavera 6 along with the Organizational Breakdown Structure (OBS);
- Prepared a unified database for activity codes and the various types of resources to be used by the contractors for unified submittal of data;
- Monitored the progress of the project’s packages and generated reports representing the overall progress of the project, identifying critical areas lacking progress and implemented recovery plans to overcome delays;
- Evaluation and review of work breakdown structure (WBS) for the major activities for all the project packages;
- Evaluation and review of submitted baseline programs from engineers and contractors;
- Attended coordination meeting with different packages contractors and highlighted the critical technical and contractual issues;
- Managed the project manager consultant’s planners during monitoring, updating & reporting of project’s packages baseline programs;
- Evaluation and reviewal of the Consultant/Contractors progress of works through monthly reports;
- Assessed project performance and developed progress analysis reports, identifying critical areas lacking progress and implemented recovery plans to bridge schedule gaps.

Planning Engineer في Al Habtoor Engineering
  • الإمارات العربية المتحدة - دبي
  • أبريل 2006 إلى نوفمبر 2007

"Head Office (July 2007 to Nov 2007)"
-Prepared the Enterprise Project Structure (EPS) of the company using Primavera 5 along with the Organizational Breakdown Structure (OBS);
-Downloaded all the company’s on going projects baselines programs for monitoring and tracking purpose;
-Prepared a unified database for activity codes and the various types of resources in the company;
-Studied the contracts and the BOQ for new projects to develop preliminary tendering schedules, followed by the detailed Master Program and the WBS for the major deliverables;
-Conducted courses for the planning department migrating them from using Primavera 3 to Primavera 5;

"Dubai Land (260 Villas for Dubai Properties);(Oct 2006 to July 2007)"
-Marked the milestones, for each phase and developed tendering programs;
-Produced the Master Program; loaded with the resource projection for man power & material used during the project;
-Assignments of Project Planning & Control for the MEP works for buildings, Villas & towers
-Listing and detailing of all MEP activities and coordinating with civil activities
-Coordinated the work program with MEP engineers.
-Coordinated the work program with procurement and design engineers.
-Preparation of Weekly & Monthly reports generated from P3;
-Monitored and control of the construction schedule, analysing variances & causes and recommending necessary actions;
-Tracked and recorded the changes required by the consultant; and developed a claim for the extension of time.

"JBR (Jumairah Beach Residence);(April 2006 to Oct 2006)"
-Preparation of detailed look-ahead schedule; including the projection for the required resources;
-Developed procurement schedules, to ensure the materials’ delivery on the due date; and
-Monitored the performance of subcontractors & vendors; with continuous evaluation to their progress & invoices;
-Followed up the progress of works on site and updated the program accordingly;

Planning Engineer (Technical Office) في The Arab Contractors (Osman Ahmed Osman)
  • مصر - دمياط
  • مايو 2005 إلى أبريل 2006

-Studied the Contract and the drawings along with the BOQ for the projects;
-Produced the Master Program; loaded with the resource projection for man power & material used during the project;
-Followed up the progress of works on site and updated the program accordingly;
-Preparation of Weekly & Monthly reports;
-Monitoring and control of the construction schedule, analysing variances & causes and recommending necessary actions;
-Monitored the performance of subcontractors & vendors; with continuous evaluation to their progress & invoices;
-Developed procurement schedules, to ensure the materials’ delivery on the due date; and
-Evaluated & verified actual accomplishment and progress of work and reports to Project Manager

Site Engineer في The Arab Contractors (Osman Ahmed Osman)
  • مصر
  • يوليو 2003 إلى أبريل 2005

-Studied the technical drawings for steel reinforcement;
-Supervised the daily works on site of concrete and finishes;
-Carried out the concrete tests;
-Measured and calculated the work produced by the subcontractors;
-Assisted in producing detailed shop drawings using AutoCAD; and
-Issued inspection requests for the consultant.

الخلفية التعليمية

دبلوم, Planning & Scheduling
  • في AACEI - Association for the Advancement of Cost Engineering International
  • يوليو 2007

Planning & Scheduling Professional (PSP)

بكالوريوس, Civil Engineering
  • في Cairo University
  • يونيو 2003
الثانوية العامة أو ما يعادلها, High School
  • في Cambridge University
  • يوليو 1996

International General Certificate of Secondary Education (I.G.C.S.E)

Specialties & Skills

Schedule Planning
Program Monitoring
Progress Reports
Progress Monitoring
Schedule Control
AutoCAD
Microsoft Office
Primavera

اللغات

العربية
متمرّس
الانجليزية
متمرّس

التدريب و الشهادات

yes (الشهادة)
تاريخ الدورة:
September 2004
صالحة لغاية:
October 2004
yes (الشهادة)
تاريخ الدورة:
April 2009
صالحة لغاية:
May 2009
yes (الشهادة)
تاريخ الدورة:
July 2004
صالحة لغاية:
July 2004
yes (الشهادة)
تاريخ الدورة:
June 2006
صالحة لغاية:
June 2006
yes (الشهادة)
تاريخ الدورة:
February 2007
صالحة لغاية:
April 2007