عقيل Ur rehman, Planning Engineer

عقيل Ur rehman

Planning Engineer

KBR

البلد
الإمارات العربية المتحدة
التعليم
الثانوية العامة أو ما يعادلها, Civil Engineering
الخبرات
18 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 5 أشهر

Planning Engineer في KBR
  • الإمارات العربية المتحدة - أبو ظبي
  • نوفمبر 2023 إلى يونيو 2024

Control and implementation of EPC Contractors’ procedures and schedules, scheduling and progress control methodology, to monitor EPC contractors’ execution schedule on site, to check and approve EPC Contractors’ progress measurement and progress reports.
Reviewing contractor master EPC baseline schedule in line with Client requirement.
Coordinate with the Project Control team, and specifically with the GMP Planning & Reporting Lead, from whom he shall comply with rules and requirements.

Define and update as necessary, in liaison with the MP/PM Planning & Reporting Lead, suitable Weekly and Monthly report structure complying with Project needs and to develop and issue accordingly detailed and accurate GMP weekly and Monthly Reports (and any other report as requested).

Planning Engineer في BP ROO ( Tuner & Towsend)
  • العراق - البصرة
  • فبراير 2022 إلى فبراير 2023

Control and implementation of EPC Contractors’ procedures and schedules, scheduling and progress control methodology, to monitor EPC contractors’ execution schedule on site, to check and approve EPC Contractors’ progress measurement and progress reports.

Support to Manager’s to develop works break down for baseline schedule.

Attending weekly, monthly progress meeting in order to line to match projects milestones.

Planning & Costing Engineer في TA'AZ Construction
  • العراق - البصرة
  • ديسمبر 2019 إلى يناير 2022

Road Work, Earth Work, Equipment's Foundations, Fencing Work, Concrete Paving, Concrete Demolition, Structure Work, Grouting Work
• Preparation of monthly valuation, submission to client, and agree the interim valuation with cost consultant.
• Attend WOP opening meetings, clarification meeting to finalized the requested
• Submission of VOWD (Volume of Work Done)
• Level -4 Schedule preparation & monitoring according to approved WOP.
• Preparing the measurement sheet for monthly Interim Payment Application (IPA) to submit consultant.
• Making variation order as per contract
• Solving the ongoing issue as per management direction.

Planning Engineer في Ghantoot General Contracting Road & Transport
  • الإمارات العربية المتحدة - أبو ظبي
  • ديسمبر 2012 إلى ديسمبر 2019

• Preparation baseline schedule and monitoring at Level 4 according to agreed progress measurement sheet.
• Preparation of Weekly report monthly report as per project requirement.
• Preparation and monitoring of 3month look ahead schedule at level 4 details.
• Preparation of main activity KPI sheet as per requirement.
• Review the of for monthly Interim Payment application and finalizing with Consultant.
• Attend weekly and monthly progress meeting with consultant.
• Submission of VOWD (Volume of Work Done)
• Level -4 Schedule preparation & monitoring according to approved WOP.
• Preparing the measurement sheet for monthly Interim Payment Application (IPA) to submit consultant.
• Making variation order as per contract
• Solving the ongoing issue as per management direction.

Project في Expansion of District Cooling Plant Khalifa University Al
  • الإمارات العربية المتحدة
  • نوفمبر 2011 إلى ديسمبر 2011

Estimated Project Cost: 23 Million AED
Project Task. EPC Project 400ton District Cooling Plant (EPC)

6.3 PROJECT PLANNING ENGINEER | AFIC UAE / QATAR
Project-1 | Cathodic Protection of 460 Wellheads ADCO ASAB, Sahil, Shaha, QASAVIRA
Estimated Project Cost: 63 Million AED
Project-2 | Cathodic Protection of 7 Wellheads RASGAS QATAR.

project planning engineer في AFIC Abudulla Fouad
  • الإمارات العربية المتحدة - أبو ظبي
  • نوفمبر 2008 إلى نوفمبر 2011

Project Task. EPC Project 460 Nos Wellhead in UAE & EPC of 7 Nos H2s Gas Injection Wells in Qatar

CIVIL SUPERVISOR في SANAMPROGETTI SPA
  • المملكة العربية السعودية
  • نوفمبر 2007 إلى يوليو 2008

Tasks. Sub-Station, Heavy Equipment’s Foundation, Electrical Trenches, Dike Walls of Evaporation Ponds. Pipe Sleepers FND.

Project Cost في Heavy Equipmen
  • أبريل 2003 إلى سبتمبر 2006

130 Million $ US
Work Task. Sub-Station 130 KV,

planning engineer في DESCON Engineering UAE
  • الإمارات العربية المتحدة - أبو ظبي
  • مارس 2003 إلى يوليو 2006

9. Planning site activities in detail, setting targets and accurately forecasting completion dates.
10. Preparation of Weekly report, Monthly report and updated Master baseline schedule as per the PMS.
11. Preparation of Extension of Time Claim and record the delay events as per claim.
12. Preparation of detail level -4 and KPI schedule for site construction team.
13. Conduct regular project meetings with (consultants, Sub-contractors) for project tracking and progress review.

الخلفية التعليمية

الثانوية العامة أو ما يعادلها, Civil Engineering
  • في GCT LAHORE
  • يناير 1996

Specialties & Skills

OIL PAINTING
CABLEADO
CUSTOMER RELATIONS
DRIVING
ENGINEERING
FIRST AID
FORECASTING
MEETING FACILITATION
NETWORKING
PRIMAVERA

اللغات

الانجليزية
متمرّس

التدريب و الشهادات

Primavera P6 (الشهادة)
تاريخ الدورة:
March 2003